ShoreLand'r SLRB40TBLW User Manual V.2

®
SLRB40TBLW
SLRB40BLW Bundles Required:
ST175/80R13C Tire/TS Dir Rim .................2
(or)
ST175/80R13C Tire/Galv Dir Rim .............. 2
66520 Bag with Chains, No Coupler .....................1
62340 Literature Bag - Trailers .............................. 1
80313-- Frame Bundle - 2X4W RB40BLW ............. 1
66996-- Tongue Assembly 55”, W/UFP Actuator ..... 1
62168 Bunk Assy Rear Bunk Kit - RB ................... 2
ShoreLand’r offers their product line in either galvanized or
painted nish. When ordering parts it is important that you specify the nish or color you have on your product. The ve
(5) digit number along with a two (2) digit space _ _, note the
parts which can be purchased with various nishes. When ordering these items use the ve (5) digit number along with a two (2) digit sufx for the proper nish.
00..........Galvanized
01..........Arctic White
03..........Black
33..........Galvanized w/Black Plastic Parts
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003451
Page 1 REV A 10/11/06
Table of Contents: Page
Frame Drawing & Bill of Materials ............................ 2-3
Safety Instructions .................................................... 3
Tongue & Safety Chain Dwg/BOM/Assy Instr. .......... 4-5
Prole 2000 Winch Dwg/BOM/Assy Instr. ............... 6-7
Tire Size & Carrying Capacity Chart ......................... 8
Chassis Drawing & Bill of Materials .......................... 8-9
Rocker Arm Assembly Instructions ........................... 9
Spring Assembly Instructions ................................... 9
One Axle Brake Installation ...................................... 10
Tire & Wheel Assembly ............................................ 10
RB Assembly Instructions ......................................... 11-12
Trailer Adjustments ................................................... 13-14
Axle Adjustments ...................................................... 13
Rear “RB” Support System ....................................... 13
Front Roller Support System .................................... 13
Winch Post Adjustments ........................................... 13-14
Diagram A
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003451
Page 2 REV A 10/11/06
Refer to your ShoreLand’r Owner’s Guide and other decals on trailer for
additional information.
SAFETY INSTRUCTIONS
4810709
Proper tongue weight must be maintained.
Rev C 8/28/06
Before towing, check the following to ensure that:
1. All parts, bolts, nuts and wheel lug nuts are tight.
2. All wheel lug nuts must be tightened to a minimum torque rating of 85 ft/lb.
3. Lug nuts must be re-torqued after the first 50 miles, then periodically there after.
4. Tires are inflated to manufacturer’s standards. (See tire sidewall)
5. Wheel bearings have adequate grease.
6. Hitch ball is the proper diameter and has a rating equal to or greater than the GVWR of the trailer.
7. Coupler is properly attached and secured to coupler ball.
8. Trailer safety chains are crossed under the tongue and attached to towing vehicle.
9. All lights are operational. Note: It is recommended that the trailer lights be disconnected before backing into the water.
10. Tie downs, winch strap and bow­ eye safety chain are secure.
11. Trailer tongue jack is in up or travel position.
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts and sort by size.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003451
Page 3 REV A 10/11/06
Diagram B
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003451
Page 4 REV A 10/11/06
TONGUE
The tongue is shipped separate of the frame. Locate the appropriate tongue and install by sliding it in the front of the tongue channel.
Line the holes in the tongue with the holes in the tongue channel. Install the 1/2” x 4” hex bolt in the front cross hole and secure with a 1/2” lock nut.
Remove the wire harness from the rear of the tongue. Place the wire harness and the brake line through the hole provided in the tongue cover plate. See Detail A in Diagram A.
Secure the tongue cover plate in position with the same1/2” x 1-1/2” hex bolt that secures the back on thetongue to the tongue channel of the frame. Secure with 1/2” lock nut. Tighten both bolts just installed.
Plug the tongue wire harness ends into the frame har­nesses by matching colors and ends. Push the extra wire provided either into the rear of the tongue or else remove the grommet in the side frame and place the extra wire in the side frame. Replace grommet just re­moved.
SAFETY CHAINS
Locate the 1/2” x 1-1/4” hex bolt. Slip the bolt through a 1/2” at washer, then place through the last link of one
of the safety chains. Place a second at washer on the
bolt and insert through the hole as shown in Diagram
B. Secure with a 1/2” ange lock nut. Tighten.
Repeat this process on the second safety chain on the opposite side of the tongue.
Assembly is complete.
BRAKE LINE
Locate the brass brake line coupling. Remove the plastic cap and thread the brake line coming out the rear of the tongue into one end of the coupling. Bend the line in a smooth gradual radius being careful not to kink the line. Bend so it can be mated to the brake line from the side frame. Once aligned, thread the side frame brake line into the other end of the coupling. Tighten both lines into the coupling.
WHITE GROUND WIRE INSTALLATION
Place the self-tapping screw provided through the round metal ring on the white ground wire of the tongue harness located at the rear of the tongue. At­tach the ground wire to the main frame by driving the screw in the hole provided next to the tongue channel of the frame. This will assure a positive ground for the lighting.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003451
Page 5 REV A 10/11/06
Loading...
+ 9 hidden pages