ShoreLand'r SLRB40TABXLW User Manual

®
SLRB40TABXLW
SLRB40TABXLW Bundles Required:
ST215/75R14C Tire/Dir Rim .......................4
66520 Bag with Chains, No Coupler .....................1
69082 Literature Bag - Trailers - Brakes................1
80310-- Frame Bundle - 2X4W RB40TABXLW ....... 1
66996-- Tongue Assembly 55”, W/UFP Actuator ..... 1
69352 Brake Kit - Tandem Axle Connect - Hose ... 1
62168 Bunk Assy Rear Bunk Kit - RB ................... 2
ShoreLand’r offers their product line in either galvanized or
painted nish. When ordering parts it is important that you specify the nish or color you have on your product. The ve
(5) digit number along with a two (2) digit space _ _, note the
parts which can be purchased with various nishes. When ordering these items use the ve (5) digit number along with a two (2) digit sufx for the proper nish.
00..........Galvanized
01..........Arctic White
03..........Black
33..........Galvanized w/Black Plastic Parts
Table of Contents: Page
Frame Drawing & Bill of Materials ............................ 2-3
Safety Instructions .................................................... 3
Tongue & Safety Chain Dwg/BOM/Assy Instr. .......... 4-5
Prole 2000 Winch Dwg/BOM/Assy Instr. ............... 6-7
Tire Size & Carrying Capacity Chart ......................... 8
Chassis Drawing & Bill of Materials .......................... 8-9
Rocker Arm Assembly Instructions ........................... 9
Spring Assembly Instructions ................................... 9
Axle Assembly Instructions ....................................... 9
RB Assembly Instructions ......................................... 11-12
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003736
Page 1 12/06/06
Diagram A
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003736
Page 2 12/06/06
Refer to your ShoreLand’r Owner’s Guide and other decals on trailer for
additional information.
SAFETY INSTRUCTIONS
4810709
Proper tongue weight must be maintained.
Rev C 8/28/06
Before towing, check the following to ensure that:
1. All parts, bolts, nuts and wheel lug nuts are tight.
2. All wheel lug nuts must be tightened to a minimum torque rating of 85 ft/lb.
3. Lug nuts must be re-torqued after the first 50 miles, then periodically there after.
4. Tires are inflated to manufacturer’s standards. (See tire sidewall)
5. Wheel bearings have adequate grease.
6. Hitch ball is the proper diameter and has a rating equal to or greater than the GVWR of the trailer.
7. Coupler is properly attached and secured to coupler ball.
8. Trailer safety chains are crossed under the tongue and attached to towing vehicle.
9. All lights are operational. Note: It is recommended that the trailer lights be disconnected before backing into the water.
10. Tie downs, winch strap and bow­ eye safety chain are secure.
11. Trailer tongue jack is in up or travel position.
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts and sort by size.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003736
Page 3 12/06/06
Diagram B
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003736
Page 4 12/06/06
TONGUE
The tongue is shipped separate of the frame. Locate the appropriate tongue and install by sliding it in the front of the tongue channel.
Line the holes in the tongue with the holes in the tongue channel. Install the 1/2” x 4” hex bolt in the front cross hole and secure with a 1/2” lock nut.
Remove the wire harness from the rear of the tongue. Place the wire harness and the brake line through the hole pro­vided in the tongue cover plate. See Detail A in Diagram A.
Secure the tongue cover plate in position with the same 1/2” x 1-1/2” hex bolt that secures the back on the tongue to the tongue channel of the frame. Secure with 1/2” lock nut. Tighten both bolts just installed.
Plug the tongue wire harness ends into the frame harnesses by matching colors and ends. Push the extra wire provided either into the rear of the tongue or remove the grommet in the side frame and place the extra wire in the side frame. Replace grommet just removed.
SAFETY CHAINS
Locate the 1/2” x 1-1/4” hex bolt. Slip the bolt through a 1/2” at washer, then place through the last link of one of the safe-
ty chains. Place a second at washer on the bolt and insert
through the hole as shown in Diagram B. Secure with a 1/2”
ange lock nut. Tighten. Repeat this process on the second
safety chain on the opposite side of the tongue.
Assembly is complete.
TONGUE BRAKE HOSE CONNECTION Locate the brass brake line coupling. Remove the plastic
cap from the tting on the end of the tongue hose. Thread
into one end of the coupling. Remove the hose from the side frame enough to reach into the rear of the tongue. Remove
the plastic cap from the tting on the side frame hose, then
thread into the other end of the coupling. Tighten.
Push the excess hose back inside the tongue so that the cou­pling just installed is located inside the rear of the tongue.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003736
Page 5 12/06/06
Loading...
+ 9 hidden pages