SLRB2313BLW
SLRB2313BLW Bundles Required:
4300236 ST185/80R13C Radial Tire/TS Dir Rim ...... 2
(or)
4300237 ST185/80R13C Radial Tire/Galv Dir Rim ...2
66520 Bag with Chains, No Coupler .....................1
69082 Literature Bag - Trailers - Brakes ...............1
80298-- Frame Bundle - 2X4W RB2313BLW ......... 1
66996-- Tongue Assembly 55”, W/UFP Actuator ..... 1
62168 Bunk Assembly - Rear Bunk Kit RB ...........1
ShoreLand’r offers their product line in either galvanized or
painted finish. When ordering parts it is important that you
specify the finish or color you have on your product. The five
(5) digit number along with a two (2) digit space _ _, note the
parts which can be purchased with various finishes. When
ordering these items use the five (5) digit number along with
a two (2) digit suffix for the proper finish.
00 .........Galvanized
01 .........Arctic White
03 .........Black
33 .........Galvanized w/Black Plastic Parts
Table of Contents: Page
Frame Drawing & Bill of Materials ................................2-3
Roller/Bunk Assembly Instructions ...............................3
Tongue, Actuator & Safety Chain Dwg/BOM. ............... 4
Safety Instructions ........................................................5
Tongue Assembly Instructions ......................................5
White Ground Wire Installation .....................................5
Safety Chains Instructions ............................................5
Brakeline Instructions ................................................... 5
Profile 2000 Winch Dwg/BOM/Assy Instr. ................... 6-7
Spring Assembly Instructions ....................................... 7
Axle Assembly Instructions ...........................................7
Chassis Drawing & Bill of Materials .............................. 8-9
Tire Size & Carrying Capacity Chart .............................9
One Axle Brake Installation .......................................... 9
Tire & Wheel Assembly ................................................9
Trailer Adjustments .......................................................10
Axle Adjustments ...................................................... 10
Rear RB Support System Adjustment .......................10
Front Roller Support Adjustment ...............................10
Winch Post Adjustments ...........................................10
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003414
Page 1
Diagram A
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003414
Page 2
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts
and sort by size.
RB SERIES
The RB -series rear bunk assembly is installed by placing
the bunk assembly mounting channel over the rear crossmember and securing in place with a 1/2” x 4-1/4” hex bolt
and lock nut. (See Diagram A). Tighten only enough to hold
in position until the boat is placed on the trailer. Repeat on
the other RB-bunk assembly.
The short stabilizer bunk is installed to the adjustable bunk
bracket on the front cross member with a 3/8” x 1” hex bolt
and lock nut. (See Diagram A, Detail B).
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003414
Page 3