SLRB2313BL
SLRB2313BL Bundles Required:
ST185/80R13C Tire/TS Dir Rim .................2
(or)
ST185/80R13C Tire/Galv Dir Rim .............. 2
66520 Bag with Chains, No Coupler .....................1
69082 Literature Bag - Trailers - Brakes................1
80229-- Frame Bundle - 2X4 RB2313BL ................1
66996-- Tongue Assembly 55”, W/UFP Actuator ..... 1
62168 Bunk Assembly - Rear Bunk Kit RB............1
ShoreLand’r offers their product line in either galvanized or
painted nish. When ordering parts it is important that you
specify the nish or color you have on your product. The ve
(5) digit number along with a two (2) digit space _ _, note the
parts which can be purchased with various nishes. When
ordering these items use the ve (5) digit number along with
a two (2) digit sufx for the proper nish.
00..........Galvanized
01..........Arctic White
03..........Black
33..........Galvanized w/Black Plastic Parts
Table of Contents: Page
Frame Drawing & Bill of Materials ................................2-3
Safety Instructions ........................................................3
Tongue, Actuator & Safety Chain Dwg/BOM. ............... 4
Tongue Assembly Instructions ......................................5
White Ground Wire Installation .....................................5
Safety Chains Instructions ............................................5
Brakeline Instructions ................................................... 5
Prole 2000 Winch Dwg/BOM/Assy Instr. ................... 6-7
Chassis Drawing & Bill of Materials ..............................8-9
Tire Size & Carrying Capacity Chart .............................8
Spring Assembly Instructions ....................................... 9
Axle Assembly Instructions ...........................................9
One Axle Brake Installation .......................................... 9
Tire & Wheel Assembly ................................................9
Roller/Bunk Dwg / Assembly Instructions .....................
Trailer Adjustments .......................................................12
Axle Adjustments ...................................................... 12
Rear RB Support System Adjustment .......................12
Front Roller Support Adjustment ...............................12
Winch Post Adjustments ...........................................12
10-11
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003393
Page 1 REV A 10/11/06
Diagram A
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003393
Page 2 REV A 10/11/06
Refer to your ShoreLand’r Owner’s
Guide and other decals on trailer for
additional information.
SAFETY INSTRUCTIONS
4810709
Proper tongue weight must be maintained.
Rev C 8/28/06
Before towing, check the following to ensure
that:
1. All parts, bolts, nuts and wheel lug
nuts are tight.
2. All wheel lug nuts must be tightened
to a minimum torque rating of 85 ft/lb.
3. Lug nuts must be re-torqued after the
first 50 miles, then periodically there
after.
4. Tires are inflated to manufacturer’s
standards. (See tire sidewall)
5. Wheel bearings have adequate
grease.
6. Hitch ball is the proper diameter and
has a rating equal to or greater than
the GVWR of the trailer.
7. Coupler is properly attached and
secured to coupler ball.
8. Trailer safety chains are crossed
under the tongue and attached to
towing vehicle.
9. All lights are operational. Note: It is
recommended that the trailer lights
be disconnected before backing into
the water.
10. Tie downs, winch strap and bow eye safety chain are secure.
11. Trailer tongue jack is in up or travel
position.
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts
and sort by size.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003393
Page 3 REV A 10/11/06
Diagram B
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003393
Page 4 REV A 10/11/06