SLR46TBLSP
Bundles Required for SLR46TBLSP
69082 Literature Bag - Trailers - Brakes 1
80490-- Frame Bundle - 2X5 - R46TBLSP 1
4300236 ST185/80R 13C MR Tire / TS Dir Rim 4
67178-- Tongue Assembly w/UFP Disc 5x3x65 1
6238600 Rocker Bag - Tandem 1
66520 Bag w/Chains - No Coupler 1
ShoreLand’r offers their product line in either galvanized or
painted finish. When ordering parts it is important that you
specify the finish or color you have on your product. The five
(5) digit number along with a two (2) digit space _ _, note the
parts which can be purchased with various finishes. When
ordering these items use the five (5) digit number along with
a two (2) digit suffix for the proper finish.
00 ....... Galvanized
01 ....... Arctic White
03 ....... Black
33 ....... Galvanized w/Black Plastic Parts
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003561
Page 1
Table of Contents: Page
Frame Drawing & Bill of Materials ............................... 2-3
Safety Instructions ....................................................... 3
Tongue & Safety Chain Dwg/BOM/Assy Instr. ............. 4-5
SP Winch Dwg/BOM/Assy Instr. .................................. 5-7
Tire Size & Carrying Capacity Chart ............................ 8
Spring Assembly Instructions ...................................... 8
Chassis Drawing & Bill of Materials ............................. 8-9
Axle Assembly Instructions .......................................... 9
Tire & Wheel Assembly ............................................... 9
Roller Assembly Instructions ....................................... 10
Trailer Adjustments ...................................................... 10
Axle Adjustments ......................................................... 10
Winch Post Adjustments .............................................. 10
Diagram A
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003561
Page 2
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts and sort
by size.
R SERIES
The R-series roller rack is installed by placing the roller arm assembly mounting channel over the rear cross member and securing in
place with a 1/2” x 4-1/2” hex bolt and lock nut. (See Diagram A).
Note that it should be left loose until the boat is placed on the trailer.
Once the proper positions is determined, it may be tightened. Repeat on the other roller arm assembly.
The short stabilizer bunk is installed to the adjustable bunk bracket
on the front cross member with a 3/8” x 1” hex bolt and lock nut.
(See Diagram A, Detail C).
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003561
Page 3