SLR34BXLW
SLR34BXLW Bundles Required:
ST205/75R15D Tire/TS Dir Rim .................2
(or)
ST205/75R15D Tire/Galv Dir Rim ..............2
68224 Brake Box w/Hardware ...............................1
69082 Literature Brake Bag - Trailers....................1
80287-- Frame Bundle - 2X4W R34BXLW .............1
66996-- Tongue Assembly 55”, W/UFP Actuator .....1
ShoreLand’r offers their product line in either galvanized or
painted nish. When ordering parts it is important that you
specify the nish or color you have on your product. The ve
(5) digit number along with a two (2) digit space _ _, note the
parts which can be purchased with various nishes. When
ordering these items use the ve (5) digit number along with
a two (2) digit sufx for the proper nish.
00..........Galvanized
01..........Arctic White
03..........Black
33..........Galvanized w/Black Plastic Parts
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003446
Page 1 REV A 10/05/06
Table of Contents: Page
Frame Drawing & Bill of Materials ................................2-3
Safety Instructions ........................................................ 3
Tongue & Safety Chain Dwg/BOM. ..............................4
Tongue & Safety Chain Assy Instr. ...............................5
White Ground Wire/Brakeline Assy Instr ......................5
Prole 2000 Winch Dwg/BOM/Assy Instr. ...................6-7
Axle / Chassis Dwg & BOM .......................................... 8-9
Tire Size & Carrying Capacity Chart .............................9
Spring Assembly Instructions .......................................10
Axle Assembly Instructions ...........................................10
One Axle Brake Installation Instr ..................................10
Tire & Wheel Assembly ................................................10
Keel Cradle/Roller Dwgs /Assembly Instructions .........
Trailer Adjustments ....................................................... 13
Axle Adjustments ..........................................................13
Rear Support System Adjustment ................................13
Roller Adjustment .........................................................13
Front Roller Support Adjustment ..................................13
Winch Post Adjustments ...............................................13
11-12
Diagram A
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003446
Page 2 REV A 10/05/06
Refer to your ShoreLand’r Owner’s
Guide and other decals on trailer for
additional information.
SAFETY INSTRUCTIONS
4810709
Proper tongue weight must be maintained.
Rev C 8/28/06
Before towing, check the following to ensure
that:
1. All parts, bolts, nuts and wheel lug
nuts are tight.
2. All wheel lug nuts must be tightened
to a minimum torque rating of 85 ft/lb.
3. Lug nuts must be re-torqued after the
first 50 miles, then periodically there
after.
4. Tires are inflated to manufacturer’s
standards. (See tire sidewall)
5. Wheel bearings have adequate
grease.
6. Hitch ball is the proper diameter and
has a rating equal to or greater than
the GVWR of the trailer.
7. Coupler is properly attached and
secured to coupler ball.
8. Trailer safety chains are crossed
under the tongue and attached to
towing vehicle.
9. All lights are operational. Note: It is
recommended that the trailer lights
be disconnected before backing into
the water.
10. Tie downs, winch strap and bow eye safety chain are secure.
11. Trailer tongue jack is in up or travel
position.
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts
and sort by size.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003446
Page 3 REV A 10/05/06
Diagram B
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003446
Page 4 REV A 10/05/06
TONGUE
The tongue is shipped separate of the frame. Locate the
appropriate tongue and install by sliding it in the front of the
tongue channel. Line the holes in the tongue with the holes
in the tongue channel. Install the 1/2” x 4” hex bolt in the
front cross hole and secure with a 1/2” lock nut.
Remove the wire harness from the rear of the tongue. Place
the wire harness and the brake line through the hole provided in the tongue cover plate. See Detail A in Diagram A.
Secure the tongue cover plate in position with the same
1/2” x 1-1/2” hex bolt that secures the back on the tongue to
the tongue channel of the frame. Secure with 1/2” lock nut.
Tighten both bolts just installed.
Plug the tongue wire harness ends into the frame harnesses
by matching colors and ends. Push the extra wire provided
either into the rear of the tongue or else remove the grommet in the side frame and place the extra wire in the side
frame. Replace grommet just removed.
WHITE GROUND WIRE INSTALLATION
Place the self-tapping screw provided through the round
metal ring on the white ground wire of the tongue harness
located at the rear of the tongue. Attach the ground wire to
the main frame by driving the screw in the hole provided
next to the tongue channel of the frame. This will assure a
positive ground for the lighting.
SAFETY CHAINS
Locate the 1/2” x 1-1/4” hex bolt. Slip the bolt through a 1/2”
at washer, then place through the last link of one of the safe-
ty chains. Place a second at washer on the bolt and insert
through the hole as shown in Diagram B. Secure with a 1/2”
ange lock nut. Tighten.
Repeat this process on the second safety chain on the opposite side of the tongue.
Assembly is complete.
BRAKE LINE
Locate the brass brake line coupling. Remove the plastic cap
and thread the brake line coming out the rear of the tongue
into one end of the coupling. Bend the line in a smooth gradual radius being careful not to kink the line. Bend so it can be
mated to the brake line from the side frame. Once aligned,
thread the side frame brake line into the other end of the
coupling. Tighten both lines into the coupling.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003446
Page 5 REV A 10/05/06