SLR2313BS
SLR2313BS Bundles Required:
4300236 ST185/80R13C MR Tire/TS Dir Rim ...........2
(or)
4300237 ST185/80R13C MR Tire/Galv Dir Rim ........ 2
66520 Bag with Chains, No Coupler .....................1
69082 Literature Bag - Trailers ..............................1
80204-- Frame Bundle - 2X4W R2313BS ..............1
66996-- Tongue Assembly 55”, W/UFP Actuator ..... 1
ShoreLand’r offers their product line in either galvanized or
painted finish. When ordering parts it is important that you
specify the finish or color you have on your product. The five
(5) digit number along with a two (2) digit space _ _, note the
parts which can be purchased with various finishes. When
ordering these items use the five (5) digit number along with
a two (2) digit suffix for the proper finish.
00 .........Galvanized
01 .........Arctic White
03 .........Black
33 .........Galvanized w/Black Plastic Parts
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003388
Page 1
Table of Contents: Page
Frame Drawing & Bill of Materials ................................2-3
Tongue & Safety Chain Dwg/BOM/Assy Instr. ..............4
Safety Instructions ........................................................5
Profile 2000 Winch Dwg/BOM/Assy Instr. ................... 6-7
Tire Size & Carrying Capacity Chart ............................. 8
Spring Assembly Instructions ....................................... 8
Chassis Drawing & Bill of Materials ..............................8-9
Axle Assembly Instructions ........................................... 9
Tire & Wheel Assembly ................................................9
Roller Assembly Instructions ........................................ 10
Trailer Adjustments .......................................................10
Axle Adjustments ..........................................................10
Rear Support System Adjustment ................................ 10
Roller Adjustment ......................................................... 10
Front Roller Support Adjustment .................................. 10
Winch Post Adjustments ............................................... 10
Diagram A
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003388
Page 2
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts
and sort by size.
R SERIES
The R-series roller rack is installed by placing the roller arm
assembly mounting channel over the rear cross member and securing in place with a 1/2” x 4-1/2” hex bolt
and lock nut. (See Diagram A). Note that it should be
left loose until the boat is placed on the trailer. Once
the proper positions is determined, it may be tightened. Repeat on the other roller arm assembly.
The short stabilizer bunk is installed to the adjustable bunk
bracket on the front cross member with a 3/8” x 1” hex bolt
and lock nut. (See Diagram A).
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003388
Page 3