ShoreLand'r SLB46TBBL User Manual V.1

®
SLB46TBBL
Bundles Required for SLB46TBBL
69082 Literature Bag - Trailers - Brakes 1 80479-- Frame Bundle - 2X5 - B46TBBL 1 4300236 ST185/80R 13C MR Tire / TS Dir Rim 4 67178-- Tongue Assembly w/UFP Disc 5x3x65 1 6238600 Rocker Bag - Tandem 1 66520 Bag w/Chains - No Coupler 1 66541 Brake Kit Tandem Axle Connection 1
Table of Contents: Page
Frame Drawing & Bill of Materials ................................2-3
Safety Instructions ........................................................3
Tongue & Safety Chain Dwg/BOM/Assy Instr. ..............4-5
Profile 2000 Winch Dwg/BOM/Assy Instr. .................... 5-7
Tire Size & Carrying Capacity Chart .............................8
Spring Assembly Instructions ....................................... 8
Chassis Drawing & Bill of Materials .............................. 8-9
Axle Assembly Instructions ...........................................9
ShoreLand’r offers their product line in either galvanized or painted finish. When ordering parts it is important that you specify the finish or color you have on your product. The five (5) digit number along with a two (2) digit space _ _, note the parts which can be purchased with various finishes. When ordering these items use the five (5) digit number along with a two (2) digit suffix for the proper finish.
00 .........Galvanized
01 .........Arctic White
03 .........Black
33 .........Galvanized w/Black Plastic Parts
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003554
Page 1
Tire & Wheel Assembly ................................................9
Bunk Assembly Instructions .........................................10
Trailer Adjustments .......................................................10
Axle Adjustments .......................................................... 10
Winch Post Adjustments ...............................................10
Diagram A
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003554
Page 2
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts and sort by size.
B-SERIES BUNK ASSEMBLY
(See Diagram A, Detail C) Locate two of the bunk support pivots and place one on each end of one of the bunk equalizer arms attached to the rear cross member. Position so the concave in the bunk support pivot is downward as shown in Detail C, then align the holes in the bunk support pivot with those in the equalizer arm.
sert into the holes in the bunk support pivot and the equalizer arm. Secure the U-bolt in place by sliding a spacer bushing on one leg of the U-bolt, then a ½” flat washer and ½” flange lock nut. Repeat on the other leg of the U-bolt. Repeat on the other U-bolt on the opposite end of the equalizer arm. Tighten the nut until it is securely against the spacer and flat washer.
Place the front end of the bunk into the bunk bracket on the top of the adjustable bunk bracket located on the front cross member. Secure the bunk in the bracket using two No. 10 screws.
Locate one of the carpeted bunks. Note that one end of the bunk has two galvanized plates with U-bolts extending below. Align the
Repeat the above process on the bunk on the other side of the trailer.
legs of the U-bolts with the holes in the bunk support pivots, then in-
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003554
Page 3
Loading...
+ 7 hidden pages