SLB40TCBXLW-__ & SLB40TCBBXLW-__
SLB40TCBXLW-__ Shown
SLB40TCBXLW Bundles Required:
66520 Bag with Chains, No Coupler..............1
69082 Lit Packet Brake Trailers.....................1
80772__ Frame Bundle - 2X4W B40TCBXLW..1
66996__ Tongue Assy 55”, W/UFP Actuator …1
TA0991-__ Winch Stand Kit 9” w/Mtg HDWE……1
(or)
TA0992-__ Winch Stand Kit 7” w/Mtg HDWE…....1
(or)
TA0993-__ Winch Stand Kit 14” w/Mtg HDWE……
ST215/75R14C Tire/TS Dir Rim.........4
(or)
ST215/75R14C Tire/Galv Dir Rim.......4
SLB40TCBBXLW Bundles Required:
ST215/75R14C Tire/TS Dir Rim.............4
(or)
ST215/75R14C Tire/Galv Dir Rim..........4
66520 Bag with Chains, No Coupler.................1
69082 Lit Packet Brake Trailers........................1
80773__ Frame Bundle - 2X4W B40TCBBXLW...1
66996__ Tongue Assembly 55”, W/UFP Actuator 1
69352 Brake Kit - Tandem Axle Connection.....1
TA0991-__ Winch Stand Kit 9” w/Mtg HDWE………1
(or)
TA0992-__ Winch Stand Kit 7” w/Mtg HDWE……...1
(or)
TA0993-__ Winch Stand Kit 14” w/Mtg HDWE……..1
ShoreLand’r offers their product line in either galvanized or painted finish. When ordering parts it is
important that you specify the finish or color you have on your product. The five (5) digit number along with a
two (2) digit space _ _, note the parts which can be purchased with various finishes. When ordering these
items use the five (5) digit number along with a two (2) digit suffix for the proper finish.
00........Galvanized
01........Arctic White
03........Black
Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028 www.shorelandr.com 0004263
Page 1 of 14 9/24/2010
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove
parts and sort by size.
TONGUE
The tongue is shipped separate of the frame. Locate
the appropriate tongue and install by sliding it in the
front of the tongue channel.
Line the holes in the tongue with the holes in the
tongue channel. Install the 1/2” x 4” hex bolt in the
front cross hole and secure with a 1/2” lock nut.
Remove the wire harness from the rear of the tongue.
Place the wire harness and the brake line through the
hole provided in the tongue cover plate. See Detail A in
Diagram A.
Secure the tongue cover plate in position with the
same 1/2” x 1-1/2” hex bolt that secures the back on
the tongue to the tongue channel of the frame. Secure
with 1/2” lock nut. Tighten both bolts just installed.
Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028 www.shorelandr.com 0004263
Page 3 of 14 9/24/2010
Plug the tongue wire harness ends into the frame
Plug the tongue wire harness ends into the frame
harnesses by matching colors and ends. Pushes the
harnesses by matching colors and ends. Pushes the
extra wire provided into the rear of the tongue or
extra wire provided into the rear of the tongue or
remove the grommet in the side frame and place the
remove the grommet in the side frame and place the
extra wire in the side frame. Replace grommet just
extra wire in the side frame. Replace grommet just
removed.
removed.
WHITE GROUND WIRE INSTALLATION
SAFETY CHAINS
Place the self-tapping screw provided through the
Locate the 1/2” x 1-1/4” hex bolt. Slip the bolt
round metal ring on the white ground wire of the
through a 1/2” at washer, then place through the last
tongue harness located at the rear of the tongue. At-
link of one of the safety chains. Place a second flat
tach the ground wire to the main frame by driving the
washer on the bolt and insert through the hole as
screw in the hole provided next to the tongue
shown in Diagram B. Secure with a 1/2” .flange lock
channel of the frame. This will assure a positive
nut. Tighten. Repeat this process on the second
ground for the lighting.
safety chain on the opposite side of the tongue.
Assembly is complete.
SAFETY CHAINS
Locate the 1/2” x 1-1/4” hex bolt. Slip the bolt
through a 1/2” at washer, then place through the last
BRAKE LINE
Locate the brass brake line coupling. Remove the
link of one of the safety chains. Place a second flat
plastic cap and thread the brake line hose coming
washer on the bolt and insert through the hole as
out the rear of the tongue into one end of the
shown in Diagram B. Secure with a 1/2” .flange lock
coupling. Bend the line in a smooth gradual radius
nut. Tighten. Repeat this process on the second
being careful not to kink the line. Bend so it can be
safety chain on the opposite side of the tongue.
mated to the brake line hose from the side frame.
Once aligned, thread the side frame brake line hose
Assembly is complete.
into the other end of the coupling. Tighten both lines
into the coupling.
BRAKE LINE
Locate the brass brake line coupling. Remove the
ROCKER ARMS
plastic cap and thread the brake line coming out the
Locate the rocker arms (Ref. No. 6 of Detail A in Dia-
rear of the tongue into one end of the coupling. Bend
gram D. Note that the center bushing has a grease
the line in a smooth gradual radius being careful not
zerk in it. Position the rocker arms up into the center
to kink the line. Bend so it can be mated to the brake
channel welded in the center of the tandem spring
line from the side frame. Once aligned, thread the
bracket so that the grease zerk is pointing down.
side frame brake line into the other end of the
Align the holes in the channel with the rocker arm.
coupling. Tighten both lines into the coupling.
Secure in place with a 3/4” x 4-1/2” hex bolt and lock
nut. Tighten. Repeat this process on the other rocker
ROCKER ARMS
arm and spring bracket. Grease the rocker at this
Locate the rocker arms (Ref. No. 6 of Detail A in Dia-
time by applying grease through the zerk just
gram D. Note that the center bushing has a grease
discussed.
zerk in it. Position the rocker arms up into the center
channel welded in the center of the tandem spring
NOTE: The grease zerk is positioned down so
bracket so that the grease zerk is pointing down.
that it is accessible for servicing when needed.
Align the holes in the channel with the rocker arm.
Secure in place with a 3/4” x 4-1/2” hex bolt and lock
nut. Tighten. Repeat this process on the other rocker
arm and spring bracket. Grease the rocker at this
time by applying grease through the zerk just
discussed.
NOTE: The grease zerk is positioned down so
that it is accessible for servicing when needed.
SPRINGS
Position the axles so they are properly aligned with
the trailer. Position the brake axle so that the disc
brake calipers are on the back side of the axle. The
brake axle must always be mounted as the rear axle
to give you the best braking possible (See Diagram
D. There is no right and left to the axle without
brakes. It can be mounted either way.
Place the springs on the topside of the spring pads
welded to the axle. (See chassis diagram). Note that
the hook end of the spring must be to the rear of the
trailer. Place a spring clamp on the top center of the
spring as shown. Next place the 1/2” x 6-1/2” U-bolts
down over the top of the spring clamp, spring and
axle as shown.
Place the spring and axle U-bolt plate onto the ends
of the two U-bolts just placed. Secure in place with
1/2” lock nuts. Thread onto the U-bolts but do not
tighten securely until the complete unit is in position
on the trailer. Repeat on the other spring.
AXLE
Place one of the spring bracket bushings into the
rear of the spring bracket and secure with a 9/16” x
3-1/4” hex bolt and hex lock nut. Repeat in other
spring bracket. Position the rear axle under the
frame, then hook the loop of the springs around the
bushings just installed. Note that if the axle is
positioned too low when trying to hook, the loops will
not hook around the bushings.
Raise the front of the springs up so they align with
the rear hole in the axle boogie just installed. Secure
in place with 9/16” x 3-1/4” hex bolts and lock nuts.
Install another spring bracket bushing in the front
hole on the rock arm assemblies. Secure with a
9/16” x 3-1/4” hex bolt and lock nut. Tighten.
Hook the hook end of the springs mounted to the
front axle over the bushing just installed in the rocker
arm assembly. Then swing the front of the spring up
and attach the front mounting hole in the spring
bracket with another 9/16” x 3-1/4” hex bolt and lock
nut.
Tighten all axle U-bolts and spring bolts.
Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028 www.shorelandr.com 0004263
Page 5 of 14 9/24/2010