SLB40TABBLW
SLB40TABBLW Bundles Required:
ST215/75R14C Tire/Dir Rim ......................... 4
66520 Bag with Chains, No Coupler ....................... 1
69082 Literature Bag - Trailers - Brakes.................. 1
80250-- Frame Bundle - 2X4W B40TABBLW ........... 1
66996-- Tongue Assembly 55”, W/UFP Actuator ....... 1
69352 Brake Kit-Tandem Axle Connect-Hose ......... 1
ShoreLand’r offers their product line in either galvanized or
painted nish. When ordering parts it is important that you
specify the nish or color you have on your product. The ve
(5) digit number along with a two (2) digit space _ _, note the
parts which can be purchased with various nishes. When
ordering these items use the ve (5) digit number along with
a two (2) digit sufx for the proper nish.
00..........Galvanized
01..........Arctic White
03..........Black
33..........Galvanized w/Black Plastic Parts
Table of Contents: Page
Frame Drawing & Bill of Materials ............................ 2-3
Tongue & Safety Chain Dwg/BOM. .......................... 4
Tongue Assy Instr ..................................................... 5
Safety Chain Assy Instr............................................. 5
Brake Line ................................................................ 5
Safety Instructions .................................................... 5
Prole 2000 Winch Dwg/BOM/Assy Instr. ............... 6-7
Chassis Drawing & Bill of Materials .......................... 8-9
Tire Size & Carrying Capacity Chart ......................... 9
Rocker Arms ............................................................. 9
Spring Assembly Instructions ................................... 9
Axle Assembly Instructions ....................................... 9-10
One Axle Brake Installation ...................................... 11
Dual Axle Brake Installation ...................................... 11
Tire & Wheel Assembly ............................................ 11
Bunk Dwg / Assy Instructions ................................... 12
Trailer Adjustments ................................................... 13
Axle Adjustments ...................................................... 13
Rear Support System ............................................... 13
Bunks........................................................................ 13
Front Bunk Support .................................................. 13
Winch Post Adjustments ........................................... 13
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003725
Page 1 11/27/06
Diagram A
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003725
Page 2 11/27/06
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts
and sort by size.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003725
Page 3 11/27/06
Diagram B
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003725
Page 4 11/27/06
Refer to your ShoreLand’r Owner’s
Guide and other decals on trailer for
additional information.
SAFETY INSTRUCTIONS
4810709
Proper tongue weight must be maintained.
Rev C 8/28/06
Before towing, check the following to ensure
that:
1. All parts, bolts, nuts and wheel lug
nuts are tight.
2. All wheel lug nuts must be tightened
to a minimum torque rating of 85 ft/lb.
3. Lug nuts must be re-torqued after the
first 50 miles, then periodically there
after.
4. Tires are inflated to manufacturer’s
standards. (See tire sidewall)
5. Wheel bearings have adequate
grease.
6. Hitch ball is the proper diameter and
has a rating equal to or greater than
the GVWR of the trailer.
7. Coupler is properly attached and
secured to coupler ball.
8. Trailer safety chains are crossed
under the tongue and attached to
towing vehicle.
9. All lights are operational. Note: It is
recommended that the trailer lights
be disconnected before backing into
the water.
10. Tie downs, winch strap and bow eye safety chain are secure.
11. Trailer tongue jack is in up or travel
position.
TONGUE
The tongue is shipped separate of the frame. Locate
the appropriate tongue and install by sliding it in the
front of the tongue channel.
Line the holes in the tongue with the holes in the tongue
channel. Install the 1/2” x 4” hex bolt in the front cross hole
and secure with a 1/2” lock nut.
Remove the wire harness from the rear of the tongue. Place
the wire harness and the brake line through the hole provided in the tongue cover plate. See Detail A in Diagram A.
Secure the tongue cover plate in position with the same
1/2” x 1-1/2” hex bolt that secures the back on the tongue to
the tongue channel of the frame. Secure with 1/2” lock nut.
Tighten both bolts just installed.
Plug the tongue wire harness ends into the frame harnesses
by matching colors and ends. Push the extra wire provided
either into the rear of the tongue or remove the grommet in
the side frame and place the extra wire in the side frame.
Replace grommet just removed.
SAFETY CHAINS
Locate the 1/2” x 1-1/4” hex bolt. Slip the bolt through a 1/2”
at washer, then place through the last link of one of the safe-
ty chains. Place a second at washer on the bolt and insert
through the hole as shown in Diagram B. Secure with a 1/2”
ange lock nut. Tighten. Repeat this process on the second
safety chain on the opposite side of the tongue.
Assembly is complete.
TONGUE BRAKE HOSE CONNECTION
Locate the brass brake line coupling. Remove the plastic
cap from the tting on the end of the tongue hose. Thread
into one end of the coupling. Remove the hose from the side
frame enough to reach into the rear of the tongue. Remove
the plastic cap from the tting on the side frame hose, then
thread into the other end of the coupling. Tighten.
Push the excess hose back inside the tongue so that the coupling just installed is located inside the rear of the tongue.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003725
Page 5 11/27/06