SLB83TAL, SLR83TAL, SLRB83TAL & SLXR83TAL
Aluminum Trailers
SLB83TAL
Bundles Required for SLB83TAL
69082 Literature Bag - Trailers - Brakes 1
6680700 Frame Bundle 8300 lbs. Aluminum Bunk 1
*ST225/75R 15D Tire / Galv. Dir Rim 4
4510353 Actuator 10,000 lb. UFP - Plated 1
68732 Brake Box - Tandem 1
SLR83TAL
Bundles Required for SLR83TAL
69082 Literature Bag - Trailers - Brakes 1
6815600 Frame Bundle Roller Aluminum 8300 lbs. 1
*ST225/75R 15D Tire / Galv. Dir Rim 4
4510353 Actuator 10,000 lb. UFP - Plated 1
68732 Brake Box - Tandem 1
SLRB83TAL
Bundles Required for SLR B83TAL
69082 Literature Bag - Trailers - Brakes 1
6710100 Frame Bundle 8300# Aluminum RB 1
*ST225/75R 15D Tire / Galv. Dir Rim 4
4510353 Actuator 10,000 lb. UFP - Plated 1
68732 Brake Box - Tandem 1
SLXR83TAL
Bundles Required for SLXR83TAL
69082 Literature Bag - Trailers - Brakes 1
8037900 Frame Bundle 8300# Aluminum XR 1
*ST225/75R 15D Tire / Galv. Dir Rim 4
4510353 Actuator 10,000 lb. UFP - Plated 1
68732 Brake Box - Tandem 1
*Check with your dealer/customer service representative for current tire/rim assembly part number.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003356
Page 1
REV G 4/28/06
Frame Assembly
IMPORTANT: All hardware for your trailer is stainless
steel. It is important that you use an anti-seize material
on the bolt threads when assembling to prevent gaulding.
Frame:
The SL83TAL frame is assembled by the manufacturer.
Please review all assembly parts drawings throughout
this service manual. This parts breakdown is reference to
various components that make up this trailer.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003356
Page 2
REV G 4/28/06
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003356
Page 3
REV G 4/28/06
Tongue Assembly
Tongue:
Slip the tongue under front frame plate and into the channel welded
to the front cross member. Line up the holes, fasten the tongue in
the rear with a 1/2” X 4-1/2” stainless steel hex bolt and 1/2” stainless steel flat washer under the head bolt another 1/2” stainless steel
flat washer and a 1/2” stainless stell lock nut. Fasten the tongue to
the frame plate with two (2) 1/2” X 3-9/16” X 5” stainless steel square
u-bolts,1/2” stainless steel washers and 1/2” stainless steel lhex lock nuts
with nylon inserts at the front of the tongue plates
Safety Chain:
Mount the safety chains to the front on the tongue using a 1/2” X 5-1/2” stainless steel hex bolt (Ref#4) with a 1/2” stainless steel flat washer at the head
of the bolt, followed by a safety chain through the drop tongue tube. Place the
other safety chain on the bolt on the opposite side of tongue and secure with a
1/2” stainless steel flat washer and 1/2” stainless steel hex lock nut with nylon
insert. Refer to Diagram E.
White Ground Wire Installation
Pull the white wire out the hole in the tongue with either the brown
and yellow or brown and green plug. Place the self-tapping screw
provided through the round metal ring on the white ground wire of
the tongue harness just pulled out. Attach the ground wire to the
main frame by driving the screw into the bottom flange of the side
frame. This will assure a positive ground for the lighting.
Brake Line
Place one end of the 58” tongue brake line into
the hole in the top of the tongue located just behind the front joint of the two side frames. Insert
until the end of the line comes out the front of
the tongue. Place the actuator into its approximate location on the tongue. Remove the plastic plug in the rear of the actuator and thread
the brake line into the port. Tighten. Align the
actuator to be mounted to the tongue. Place a
grommet around the brakeline where it comes
out of the top of the tongue to keep it from
vibrating and chaffing as it is being towed.
Actuator:
Mount the actuator (Item #10) on the drop
the tongue using three (3) 1/2” X 4-1/2”
he x bolts (Item #3) and 1/2” stai nless
steel hex lock nuts with nylon inserts.
Form the remaining end of the brake line so it
will mate up with the brake line running down
the side frame. Secure the two lines together
with the brass coupling provided. Tighten to
prevent leaks but do not over tighten.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003356
Page 4
REV G 4/28/06
Winch Post Assembly
Winch Post:
Mount the winch post assembly to the tongue at a location that best fits your watercraft. Secure the winch post
base weldment (Item #3) to the tongue using two (2) 1/2”
X 3-9/16” X 5” stainless steel square u-bolts (Item #13)
and four (4) 1/2” stainless steel hex lock nuts with nylon
inserts. Mount the winch post angle tube weldment (Item
#4) on the tongue at a height that would best fit your watercraft using two (2) 1/2” X 3-9/16” X 5” stainless steel
square u-bolt over the flange as shown in the drawing.
Place the legs of the U-bolt into the winch hold down
clamp (Item #7) and secure with four (4) 1/2” stainless
steel hex lock nuts with nylon inserts.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003356
Page 5
REV G 4/28/06
Chassis Assembly
Tire Size & Carrying Capacity Chart
Tire Load Carrying
Size Range Capacity
ST225/75R-15 D 8300 lbs.
Refer to the tire side wall for proper tire pressure.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003356