ShoreLand'r LURE22LTSH User Manual V.2

®
LURE22LTSH
LURE22LTSH (All Colors) Bundles Required:
ST185/80D13C Bias TSilver Dir Rim ........................ 2
66520 Coupler Bag with Chains ......................................... 1
62340 Literature Bag - Trailers ............................................ 1
80605-- Frame Bundle - LURE22LTSH ................................. 1
69175-- Keel Cradle Bundle................................................... 1
3310050 Jack - 800 lbs. Swivel ............................................... 1
3310053 Jack Mounting Hardware Bag .................................. 1
ShoreLand’r offers their product line a painted nish. When ordering parts it is important that you specify the nish or color you have on your product. The ve (5) digit number along with a two (2) digit space _ _, note the parts which can be purchased with various nishes. When ordering these items use the ve (5) digit number along with a two (2) digit sufx for the proper nish.
03..........Black
39..........Galvanized w/Silver Plastic Components
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0004035
REV A 12/19/2008
Page 1
LURE22LTSH Specications
Capacity 2200 lbs. GVWR: 2960 lbs. GAWR: 2960 lbs. Ship Wt: 572 lbs. Frm Size: 2X3 (11 Ga) Tire Size: ST185/80R13C Rim Size: 13 X 4 “J” Brake: 10” Disc (Optional) Coupler: 2” Class II Suspension: 5 Leaf Hook Springs Tongue Size: 3x3x65” Swing
Table of Contents
Frame Drawing & Bill of Materials .........................................2-3
Swing Tongue, Coupler, Safety Chain ...................................4
Winch Drawing & BOM .........................................................5
Keel Cradle Assembly ...........................................................6
Roller Assembly ....................................................................7
Swivel Jack & Mounting Hardware........................................8
Chassis / Axle Assembly Dwg / BOM (Disc) .........................9-10
Tire Size & Carrying Capapcity Chart ...................................10
Trailer Adjustments ...............................................................11
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0004035
REV A 12/19/2008
Page 2
the wire harness through the hole in the tongue cover plate. (See Detail A) Secure the tongue cover plate in position with a 1/2” X 1-1/2” hex bolt and 1/2” lock nut. Tighten. Plug the tongue wire harness ends into the frame harnesses by matching colors and ends. Push the extra wire into the rear of the tongue or remove the grom­mets in the side frame and place the extra wire in the side frame. Replace grommets just removed.
SAFETY CHAINS
Mount the safety chains to the front of the tongue by placing a 3/8” at washer onto a 3/8” X 1-1/4” hex bolt, then insert the bolt through the last link of the safety chain. Put the bolt through the hole on one side of the tongue as shown. Secure with a 3/8” hex ange nut. Tighten. Repeat on the other chain on the other side of the tongue.
WINCH POST
Place t he winc h pos t assembly on the tong ue and secur e wi th three 3/8” X 4 ” hex b ol ts and hex flange l oc k nu ts. Place the nuts on the bolts but do not tighten because they will have to be readjusted once the boat is on the trailer.
Remove the winch handle nut from the shaft. Align the hole in the winch handle with the at surfaces on the shaft. Slide in position and secure with the nut just removed. Tighten.
JACK
It is recommended that the jack be mounted on the right side of the tongue. This will place it on the opposite side of the winch handle to eliminate the possibility of the two interfering when being oper­ated.
ASSEMBLY INSTRUCTIONS
Remove all items from the frame. Locate the hardware bag and sort all items by size.
SWING TONGUE
Locate the coupler bag. Place the coupler on the end of the tongue, align holes and secure with one 1/2” X 4” hex bolts and hex ange lock nuts in the rear coupler hole. Place two 1/2” X 1” hex bolts into the front holes of the coupler and secure to the each side of the tongue with 1/2” ange lock nuts. Tighten.
WIRE HARNESS
Locate the wire harness. Push the two triangular plugs in the hole on the top of the tongue, then out the rear of the tongue. Place
Remove the hardware bag from the jack and sort all items by size.
Note that the jack mounting plate has only one pair of holes on one side of the plate while the other side has holes punched to accom­modate either 3”, 4”, or 5” tongue.
Once inserted, place one of the mounting channels onto the bolt so the legs of the mounting channel are pointing away from the jack. Place on a 3/8” at washer and hex nut. Thread on only far enough to secure in place.
Repeat the above process on the other single hole of the mounting plate.
Place the jack on the tongue so that the two bolts just installed are on the top side of the tongue with the jack on the right side of the tongue and the mounting channels on the other side of the tongue.
Visually check which of the bottom three holes in the plate will align just under the bottom side of the tongue. Insert the remaining two 3/8” x 4” hex bolts into these holes and then through the mating holes in the mounting channel. Secure with 3/8” at washers and hex nuts.
Rotate the jack into the up position. Slide the jack forward or back­ward on the tongue to make sure it will not hit the frame of the trailer when in the up position.
Always rotate the jack in the up position before towing the trailer.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0004035
REV A 12/19/2008
Page 3
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0004035
REV A 12/19/2008
Page 4
Loading...
+ 8 hidden pages