61395 Coupler P-2 Bag with Chains...........................1
69175_ _ Keel Cradle Bundle 1X3/2X3 Roller.................1
3310050 Jack 1000 LB Swivel........................................1
3310053 Jack Mounting Hardware Bag..........................1
*Check with your dealer/customer service representative for current tire/rim
assembly part number.
Shoreland’r
ordering parts, it is important that you specify the finish or color
you have on your product. The 5-digit number along with a 2digit space _ _, note that the parts can be purchased in
various finishes.
03 .........Black
39……...Galvanized w/Black Plastic Components
offers its product line in painted finishes. When
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003666
Page 1 of 10 REV C 3/23/2011
Page 2
Recommended carrying capacity is based on shipping weight of the trailerwith standard equipment. Adding
optional equipment may decrease the trailer’s carrying capacity.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003
Page 2 of 10
REV C 3/23/2011
666
Page 3
Tire Size and Carrying Capacity Chart
Tire Size
GVWR
Carrying Capacity
Axle
Refer to the tire side wall for correct tire pressure.
ST185/80R13-C
2960 lb.
2200 lb.
Standard (Non-Brake)
Consumer / Owner:
Your
to fit your boat. If properly maintained it will give your boat
maximum support and many years of care free service.
Follow these instructions before using your trailer:
Read your
decals on the trailer.
Wash and wax your trailer regularly. Always rinse your
trailer after each use, especially when boating in salt or
brackish water.
Re-check all fasteners for tightness before towing.
Contact your authorized
experience a problem with your trailer. To locate a d ealer,
please use
For further information or assistance, contact
at 1-800-859-3028 or visit
trailer is designed, assembled and pre-adjusted
Lund
Shoreland’r Owner’s Guide
Shoreland’r
www.shorelandr.com
www.shorelandr.com
- dealer locator feature.
and all safety
dealer if you
Shoreland’r
.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003666
Page 3 of 10 REV C 3/23/2011
Page 4
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003
Page 4 of 10
REV C 3/23/2011
666
Page 5
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003666
REV C 3/23/2011 Page 5 of 10
Page 6
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003
Page 6 of 10 REV C 3/23/2
666
011
Page 7
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003
Page 7 of 10 REV C 3/23/2
666
011
Page 8
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003666
Page 8 of 10 REV C 3/23/2011
Page 9
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003666
Page 9 of 10 REV C 3/23/2011
Page 10
JACK ASSEMBLY AND INSTALLATION INSTRUCTIONS
It is recommended that the jack be mounted on the right side of the tongue. This will place it on the
opposite side of the winch handle to eliminate the possibility of the two interfering when being
operated.
Remove the hardware bag from the jack and sort all items by size.
Note that the jack mounting plate has only one pair of holes on one side of the plate while the other
side has holes punched to accommodate either 3”, 4”, or 5” tongue.
Place a 3/8” x 4” hex bolt into the single hole of the mounting plate so the head of the bolt is on the
jack side of the plate.
Once inserted, place one of the mounting channels onto the bolt so the legs of the mounting channel
are pointing away from the jack. Place on a 3/8” flat washer and hex nut. Thread on only far enough
to secure in place.
Repeat the above process on the other single hole of the mounting plate.
Place the jack on the tongue so that the two bolts just installed are on the top side of the tongue with
the jack on the right side of the tongue and the mounting channels on the other side of the tongue.
Visually check which of the bottom three holes in the plate will align just under the bottom side of the
tongue. Insert the remaining two 3/8” x 4” hex bolts into these holes and then through the mating
holes in the mounting channel. Secure with 3/8” flat washers and hex nuts.
Rotate the jack into the up position. Slide the jack forward or backward on the tongue to make sure it
will not hit the frame of the trailer when in the up position.
Tighten all of the mounting bolts to secure the jack assembly to the tongue.
Always rotate the jack in the up position before towing the trailer.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003666
Page 10 of 10 REV C 3/23/2011
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.