SharkRack CM-74 User Manual

CM-74 Vertical Cable Management
Installation Instructions for the SharkRack CM-74 Vertical Cable Management Rail
Kit Contents
1 SH55300
74” vertical cable management rail
2 SH55300-8001 Velcro Strips 7
1
3 SH55300-5000 Hardware Packet
• 1/4-20 Spring Nut (2)
• 1/4-20 x 1/2 Cap Screw (2)
• 1/4” Flat Washer (2)
CM-74 04/30/03 Rev 1.0 Page 1 of 3
Proprietary Information of SharkRack, Inc.
32910 Alvarado Niles Road #140, Union City, CA 94587
510-477-7900• 510-324-1664 • www.sharkrack.com
1
CM-74 Vertical Cable Management Installation Instructions
Installation Instructions
Step Detail
The CM-74 is a vertical cable management rail that secures vertically run cables. The CM-74 is mounted at the rear of the cabinet on either side.
1. Choose a location for the vertical cable management rail.
Note: The vertical cable management rail can be installed on either side of the cabinet.
2. Install the trapezoidal spring nut into the
cabinet frame. Fit the spring nut into the cabinet slotted part of the cabinet extrusion with the spring facing the opening. Turn the spring nut 90 degrees to secure it into place.(See Figure A)
3. Place the mounting hole of the vertical
cable management rail over the spring nut.
4. Secure the vertical cable management
rail to the cabinet frame using (2) 1/4-20 cap screws. Do not tighten the screws until the final placement is made.
5. The rail can be moved forward or
backward before the mounting screws are tightened. Once the rail is in positionm tighten the (2) 1/4-20 cap screws.
CM-74 04/30/03 Rev 1.0 Page 2 of 3
Loading...
+ 1 hidden pages