CM-74 Vertical Cable Management
Installation Instructions for the
SharkRack CM-74 Vertical Cable Management Rail
Kit Contents
List # Part # Part Name Quantity Detail
1 SH55300
74” vertical
cable management rail
2 SH55300-8001 Velcro Strips 7
1
3 SH55300-5000 Hardware Packet
• 1/4-20 Spring Nut (2)
• 1/4-20 x 1/2 Cap Screw (2)
• 1/4” Flat Washer (2)
CM-74 04/30/03 Rev 1.0 Page 1 of 3
Proprietary Information of SharkRack, Inc.
32910 Alvarado Niles Road #140, Union City, CA 94587
510-477-7900• 510-324-1664 • www.sharkrack.com
1
CM-74 Vertical Cable Management Installation Instructions
Installation Instructions
Step Detail
The CM-74 is a vertical cable management
rail that secures vertically run cables. The
CM-74 is mounted at the rear of the
cabinet on either side.
1. Choose a location for the vertical cable
management rail.
Note: The vertical cable management
rail can be installed on either side of the
cabinet.
2. Install the trapezoidal spring nut into the
cabinet frame. Fit the spring nut into the
cabinet slotted part of the cabinet
extrusion with the spring facing the
opening. Turn the spring nut 90 degrees
to secure it into place.(See Figure A)
3. Place the mounting hole of the vertical
cable management rail over the spring
nut.
4. Secure the vertical cable management
rail to the cabinet frame using (2) 1/4-20
cap screws. Do not tighten the screws
until the final placement is made.
5. The rail can be moved forward or
backward before the mounting screws
are tightened. Once the rail is in
positionm tighten the (2) 1/4-20 cap
screws.
CM-74 04/30/03 Rev 1.0 Page 2 of 3