
Shark® 100T Quickstart
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
5.02”
[12.75cm]
3.25”
[8.26cm]
Ic Ib Ia
HI HI HI
LO LO LO
3.52”
[ 8.90cm]
0.62”
[1.61cm]
[12.10cm]
4.78"
[2.31cm]
0.91"
4.16”
[10.60cm]
DIN Installation
Release clip
100T
Dimensions
DIN Rail with black
rubber stoppers
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
3 x 0.1A
FUSE
3A
C
C
B
B
A
A
N
N
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
Earth Ground
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
3 x 0.1A
FUSE
3A
C
C
B
B
A
A
N
N
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
Earth Ground
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
2 x 0.1A
FUSE
3A
C
C
B
B
A
A
WYE direct, 3
phase, 4 wire
Delta direct, 3
phase, 3 wire
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
3 x 0.1A
FUSE
3A
C
C
B
B
A
A
Shark® 100T Quickstart Guide
Mechanical Installation
Installation Steps: Slide top of groove of meter onto DIN Rail. Press gently until the meter clicks into place. If
mounting with DIN Rail provided, use Black Rubber Stoppers (also provided) shown above.
To remove meter, pull down on Release clip
. Electrical Installation: Select diagram for your application.
NOTE: Other wiring configurations are available. See the full Manual on the enclosed CD.
WYE with PTs,
3 phase, 4 wire
Delta with PTs, 3
phase, 3 wire
Doc# E145704 V.1.10 QS - 1

Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
RS485 Programming (for Ethernet see page QS-3)
Shark® 100T Quickstart
Communication Wiring: The Shark
uses standard 2-wire, half duplex architecture.
Factory Initial Default Settings: When the Shark 100T is powered
up, for 10 seconds you can connect to the meter using the Factory
Default Settings (even if the Device Profile has been changed). After
10 seconds the Device Profile reverts to the actual Device Profile in
use. This is one way you can always connect to the meter. The
Factory Initial Default Settings are:
Device Address:1
Baud Rate:9600
Protocol:Modbus RTU
Connection Steps:
1.Open Communicator EXT (download from product CD).
2.Click Connect on the tool bar. The Connect screen
opens. Make sure your settings match these (use pull-
down windows).
3.Click Connect. The Device Status screen confirms
the connection.
4.Click OK. Communicator EXT’s Main screen opens.
Configuration Steps:
5.Click the Profile button on the tool bar. The Device Profile screen opens.
6.Click the Communication tab and select settings based
on your application - RS485 ONLY, not INP10.
7.Click the Scaling tab and select settings based on your
application.
Communications Settings (RS485 ONLY, not INP10):
NOTE: The IrDA settings do not apply to the 100T.
COM2 (RS485): Enter the following settings:
Address (1-247)
Protocol (Modbus RTU, ASCII or DNP)
Baud Rate (9600 to 57600)
Response Delay (0-750 msec)
Scaling Settings (CT, PT Ratios and System Wiring):
Enter the following settings:
CT Numerator (enter value you want), Denominator (display only), Multiplier (1, 10, or 100), CT
Fullscale (Calculated automatically)
PT Numerator (enter value you want), Denominator (enter value you want), Multiplier (1, 10, 100, or
10000), PT Fullscale (Calculated automatically)
® 100T meter’s RS485 port
Doc# E145704 V.1.10 QS - 2