Seiko TF-6, TF-6B Instruction Manual

TE
TF-B.BB
NEEDLE
OPERATOR
'S GUIDE
1. Move needle bar to highest poi
2. Insert needle
3. Long groove faces
4. Tighten needle set screw.
THREADING
Raise needle bar thread stand according
up
as
left
NEEDLE
to
highest
far
to
as
possitile.
.
the
point
direction
~
:----
.....:
-=--
nt.
and lead thread
of
the
allow
from
mark
Long g
roov
e
----
Fig. 1
.
Fig. 3
Thread needle
F
ig.
2
\
\
Fig. 4
from
left
to right
.
TO OPEN
1.
Move
2.
Press
3.
Move screw head.
4.
Remo
Shuttle
THE
needle
shuttle
right
ve
cap
race cap
SHUTT
bar
to
race cap
side
of
from
LE
RACE
highest point.
latch
outward.
cap
upward
shuttle
race.
/
CAP
to
disengage it
Screw
from
TO
REMOVE
1. Remove
WINDING
1. Place a
2. Lead thread
3.
shuttle
BOBBIN
bobbin
Press
down
disengaged
thread.
THE
BOBBIN
body
on
the
as
shown
lever
for
from VĀ·belt
Fig. 5
from
shutt
le race.
Shuttle
Fi
g.
7
bobbin winder spind le
by
Fig. 9
and
then
wind
start
mach
after
drive
automatically
race
as far
several times
ine.
Pulley
bobb
in f
as
possible.
on
bobbin
will
ills up
2. Open
.
be
with
Fig. 6
shuttle body
~~
Shuttle
cover
body
Bobbin
and
cover
take
out
bobbin.
'
Fig. 8
~Lever
Un
o
Ad winder
even windi justable
ng:
by
loosen screw (1)
to
right
or
to
left
Screw
and
.
move
Fig. 9
o Win
ding
Adjustable
(2)
amount
by
screw
:
121
.
Loading...
+ 2 hidden pages