Quickmount Installation, Operating and Maintenance Instructions Issue 3 08/10/98
Page 6 of 8
INSTALLATION OPERATING AND
MAINTENANCE INSTRUCTIONS
SEETRU LTD.
ALBION DOCKSIDE WORKS, HANOVER PLACE, BRISTOL BS1 6UT. ENGLAND
TEL: 0117 927 9204. FAX :0117 929 8193. EMAIL:enquiries@seetru.co.uk
To remove Gauge from Tank :
1. Close all valves (14), (25) and (29).
2. Remove gauge fixing screws (5).
3. Remove gauge retaining nuts (26).
4. Remove gauge from tank complete with ‘0’ rings.
5. Check and renew ‘0’ rings if required (13) and (22).
6. Refit gauge to tank complete with ‘0’ rings (13).
7. Refit gauge retaining nuts (26).
8. Refit screws (5).
9. Refill tank and check for leaks.
To remove or renew Gauge Sight Tube :
1. Remove gauge from tank using steps 1 to 4 of Section A
2. Unscrew top gland nut (11) from gauge collar (6).
3. Remove top gauge collar (6) by pulling straight up.
4. Remove support bracket (4).
5. Remove guard tube (2).
6. Unscrew lower gland nut (11) from lower collar (7).
7. Remove sight tube (1) complete with gland nut (11), ‘0’ ring (9 & 10) and bushes (8) from lower valve
collar (7). Remove anti-rattle rings from sight tube where fitted.
8. Clean or renew sight tube, inspect all seals, renew if required.
9. Check internal passages of collars, clear of obstruction.
10. Refit sight tube (1) complete with top and bottom gland nut (11), ‘0’ rings (9 & 10) bushes (8) and
anti-rattle rings (3) where used.
11. Screw lower gland nut (11) to bottom gauge collar (6).
12. Refit guard tube (2).
13. Refit support bracket (4) where used.
14. Refit to top gauge collar (6).
15. Screw top gland nut (11) to top gauge collar (6).
16. Push anti-rattle rings (3) where used behind bridges of guard tube (2).
17. Refit gauge to tank using steps 6 to 9 from Section A.
To inspect or renew Screw-down Seals (23 & 24) in Top Valve :
1. Drain tank below level of connection.
2. Unscrew retaining nut (26) to facilitate removal of retaining clip (21).
3. Completely remove valve (25) by unscrewing.
4. Inspect and renew ‘0’ rings (23 & 24) if required.
5. Check internal passages are clear.
6. To re-assemble, screw valve (25) into valve body (20).
7. Refit retaining clip (21), check ‘0’ ring (13) is in position, screw on retaining nut (26).
8. Refill tank and check for leaks.