Seetru G27 Instructions Manual

Page 1
MINI GAUGE G27
Issue: 3 Date: 12.10.10
The Seetru Mini Gauge consists of a transparent sight tube, protected against breakage by a transparent polycarbonate guard tube or Stainless Steel with viewing slots.
The sight tube is sealed into collars at both ends which in turn are fixed and sealed to the tank by connection nipples.
Installation Instructions
Tank connection thread of ¼” BSP.PL. is required [standard Mini Gauge connection].Ensure good surface for flat face seal.
1. The gauge should not be fitted to tank bosses whilst welding bosses to tank, to avoid heat soak damage to seals.
2. After welding, check face and bore of tank boss [or tank face if bosses have not been used] is free of damage and weld splatter. Ensure correct alignment and squareness of top and bottom tank connection to avoid undue strain on gauge.
3. Fit gauge assembly up to tank, ensure seals are in position on collar, screw nipples (item 9) into tank to seal gauge to tank. Tightening torque of 12 – 16Nm MAX.
4. Gauge may be adjusted by +/- 2mm on nominal centre distance by slacking off gland nuts and sliding the collars on the sight tube, retighten gland nuts after adjustment.
The gauge is now ready for service, check for leaks.
Important
Nominal centre distance must not be exceeded by 1.6mm as this could affect the gauge sealing and re­assembly of the gauge, as per maintenance paragraph, will be necessary.
Operation Faults Table
FAULT
PROBABLE CAUSE
RECTIFICATIOIN
Empty tank Fill tank
Gauge not filling
Obstruction in gauge Clear
Mis-use Renew
Broken sight tube
Mis-alignment Renew, check face flat
Loose retaining nut Tighten
Leaks from collar seal
Damaged 'O' ring Renew
Loose gland nut Tighten
Sight tube gland leaking
Damaged 'O' ring
Renew
Nipple loose Tighten
Leaking from tank boss
Sealing washer damaged Renew
Page 2
2
MINI GAUGE G27
MAINTENANCE
Before undertaking any maintenance work on gauge, ensure discharge of gauge or tank cont ent will not create a hazard to personnel. Particular attention being given to hazardous fluids, system temperature and pressure.
TO REPLACE SIGHT TUBE, CLEAN GAUGE OR REPLACE SEALS
1. Drain tank.
2. Unscrew top and bottom nipples (9) remove gauge assembly from tank.
3. Remove nipples from collar (8).
4. Check and renew seals (10) if required.
5. Unscrew top gland nut (4) from gauge collar (8)
6. Remove top gauge collar (8) from tubes by pulling.
7. Remove guard tube (2) by sliding off sight tube.
8. Unscrew lower gland nut (4) from lower gauge collar (8).
9. Remove sight tube (1).
10. Clean or renew sight tube, inspect all bushes and seals (5, 6 & 7) renew if required.
11. Check internal passages of collar and nipples are clear of obstructions.
12. Refit lower gland nut, bushes and seals to sight tube.
13. Screw lower gland nut to lower collar.
14. Refit guard tube.
15. Refit upper gland nut, bushes and seals to sight tube.
16. Screw upper gland nut to upper collar.
17. Gauge is now ready for refitting to tank.
Page 3
3
MINI GAUGE G27
Assemble as follows: Gland nut (4) to be placed over sight tube (1), then one ferrule (7), large O’ring (6) SXX01433, small O’ring (5) SXX01333, then the second ferrule (7), which should then be pushed into the collar (8) and the gland nut (4) to be screwed onto the collar (8) and tightened to 12Nm.
Loading...