Secure Meters CENTAURPLUS C27 Installation Instructions

CentaurPlus C21 & C27 Series 2
Installation Instructions
CentaurPlus C21 and C27 two channel programmers offer up to three on/off periods a day for hot water and heating with a hot water boost and heating advance facility.
Installation and connection should only be carried out by a suitably qualified person and in accordance with the current edition of the lET wiring regulations.
WARNING: Isolate mains supply before commencing installation.
Fitting the backplate
Once the backplate has been removed from the pa ck agin g pl ea se ensure the programmer is resealed to prevent damage from dust and debris.
The backplate should be fitted with the wiring terminals located at the top and In a position that allows a total clearance at last 50mm around the unit.
50mm
50mm
1 2 3 4
N L
50mm
100mm
Direct Wall mounting
Offer the backplate to the wall in the position where the programmer is to be mounted, remembering that the backplate fits to the left hand end of the control. Mark the fixing positions through the slots on the backplate (fixing centres of 60.3mm), drill and plug the wall, then secure the backplate position. The slots in the backplate will compensate for any misalignments of the fixing.
Wiring box mounting
The backplate may be fitted directly onto a single gang steel flush wiring box complying with BS4662 using two M3.5 screws. CentaurPlus controls are suitable for mounting on a flat surface only, they must not be positioned on a surface mounted wall box or on unearthed metal surfaces.
Electrical Connections
All necessary electrical connections should now be made. Flush wiring can enter from the rear through the aperture in the backplate. Surface wiring can only enter from beneath the programmer and must be securely clamped. The mains supply terminals are intended to be connected to the supply by means of fixed wiring. Recommended cable sizes are 1.00 or 1.5 mm2.
CentaurPlus programmers are double insulated and do not require an earth connection but an earth connection is provided on the backplate for terminating cable earth connectors. Earth continuity must be maintained and all bare earth connectors must be sleeved. Ensure no earth conductors are left protruding outside the central space enclosed by the backplate.
Internal wiring diagram - C21 & C27 Series 2
L
N
230V 50Hz
3
1 2
HW
CH
OFF OFF ON ON
4
CHHW
New Installations
Example circuit diagrams for some typical installations are shown in the pages which follow. These diagrams are schematic and should be used as a guide only.
Please ensure that all installations comply with current IET regulations.
For reasons of space and clarity not every system has been included and the diagrams have been simplified - for example some Earth connections have been omitted.
Other control components shown in the diagrams, i.e valves, Room stats etc are general representations only. However the wiring detail can be applied to the corresponding models of most manufacturers for example Honeywell, Danfoss Randall, ACL Drayton etc.
Cylinder and Room Thermostat key;
C= Common; CALL = Call for heat or break on rise; SAT = satisfied on rise; N = neutral.
L
N
E
MAINS SUPPLY
N L
L
N
BOILER
1.Gravity Hot water with pumped heating
1 2
3
N
PUMP
4
L
Loading...
+ 8 hidden pages