PLEASE READ THESE INSTRUCTIONS CAREFULLY. NOTE THE SAFE OPERATIONAL REQUIREMENTS, WARNINGS & CAUTIONS. USE
THE PRODUCT CORRECTLYAND WITH CARE FOR THE PURPOSE FOR WHICH IT IS INTENDED. FAILURE TO DO SO MAY CAUSE DAMAGE AND/OR
PERSONAL INJURYAND WILL INVALIDATE THE WARRANTY. KEEPTHESE INSTRUCTIONS SAFE FOR FUTURE USE.
RACKING UNIT WITH 4 MESH SHELVES
640KG CAPACITY PER SHELF
MODEL NO: AP6372 & AP6572
INCORPORATING EXTENSION PACK WITH 4 MESH SHELVES MODEL NO'S: AP6372E & AP6572E
Thank you for purchasing a Sealey product. Manufactured to a high standard, this product will, if used according to these instructions,
and properly maintained, give you years of trouble free performance.
Refer to
Instruction
Manual
1. SAFETY
1.1. GENERAL SAFETY
WARNING! Ensure Health & Safety, and local authority regulations are adhered to when assembling and using these shelves.
9Locate shelves in a suitable area where they will not be an obstruction.
9Keep the general area clean, uncluttered and ensure there is adequate lighting.
WARNING! Erect shelves on a level and solid surface such as concrete.
9Keep children and unauthorised persons away from the storage area.
8DO NOT use the shelves for any purpose other than that for which they are designed.
8DO NOT site the shelves out of doors.
8DO NOT get the shelves wet or use in damp or wet locations or areas where there is condensation.
8DO NOT clean the shelf supports with any solvents which may damage the coated surface.
9Ensure that the shelves are properly assembled before loading them with heavy items.
9Maximum load for each shelf is 640kg. Load must be evenly distributed.
9Where possible the unit should be fixed to the wall with suitable fixings
9Place heavier items on the lower shelves.
9Where possible heavier items should be evenly distributed across the shelves.
IMPORTANT NOTE!
It is important that the load is evenly distributed. Please note that
the cross beams will flex even before max. capacity is reached. This
is normal and the beams will return to their original shape once load
is removed.
2.i INTRODUCTION
AP6372 & AP6572: Fully painted steel frame with four heavy-duty mesh shelves. Industrial structured beams offers added strength with 640kg
capacity per level, giving a maximum capacity of 2560kg per rack. Boltless design means no tools required to assemble. Clips together in minutes.
Suitable storage solution for workshop, body shop, warehouse and agricultural environments.
AP6372E & AP6572E: Pack includes one upright end frame and four heavy-duty wire mesh shelves. Connects to AP6372 and AP6572 to make
one extra bay. No limit to the number of bays that can be added, to make a continuous run.
3.i SPECIFICATIONs
AP6372 (W x D x H): 980 x 600 x 1830mm
AP6572 (W x D x H): 1955 x 600 x 1830mm
Carefully unpack the product and check the contents (fig.1) against the list below. Should any items be missing or damaged make immediate
contact with your Sealey stockist.
Part Description............................................................Quantity
A Upright Frame .............................................................................2
B Cross Beam (Long) .....................................................................8
C Wire Mesh Shelves .....................................................................4
D Cross Beam (Short) ..................................................................16
5. ASSEMBLY
5.1.
5.2. See Fig.2. Support one end frame ‘A’ in a vertical position and attach the end of one cross beam ‘B’ to it at the base of one of the
5.3.Attach another cross beam ‘B’ to the other side of the end frames ‘A’ ensuring that it is at the same level as the first cross beam.
We recommend that this shelving unit be assembled by two people. The only tool required is a rubber mallet. DO NOT use a hard
faced hammer as this will damage the surface finish of the cross beams. Make sure that all the clips lock in place securely before using
the unit. DO NOT use any parts that are damaged and/or distorted. These may assemble incorrectly and result in an installation
that is unsafe, which may cause injury or damage when the shelves are loaded.
uprights. Ensure that both tags on the end bracket engage properly with the slots in the upright as shown in the inset diagram above. Tap
the cross beam gently next to the end bracket so that the beam is properly seated into the slots in the upright. Connect the other end of
the beam to the second end frame at the same height and tap into place.
Attach 4 smaller cross beams ‘D’ between the main cross beams ‘B’.
Fig.2
D
D
Fig.3
D
D
5.4. See Fig.3. Continue to assemble the next two pairs of cross beams at the heights required. The end frames allow adjustment in 3” increments. Each pair of beams must be mounted at the same height. Ensure that all tabs on the cross beam brackets are fully
engaged in the slots in the uprights and that the cross beams are properly tapped down into place.
5.5. See Fig.4. Assemble the remaining two cross beams to the top of
the frame as shown below ensuring that the tabs are fully engaged into the end frames.
5.6. See Fig.5. Each wire deck ‘C’ is reinforced with four cross members welded onto the underside of the mesh. Each of these cross members has a turned down tab at either end that must pass through slots in the cross beams. Place a wire deck onto each pair of cross
beams as shown below ensuring that it sits into the recessed section on the top surface of each cross beam and all tabs pass through the
slots in the cross beams as shown in the inset diagram at the bottom of Fig.5.
5.7. See Fig.6. Extra components are available to create extra
storage bays as required (see Section 3). In the example below a
third storage bay is achieved by joining two free standing units .
Fig.5
C
Fig.6
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be
sorted, taken to a recycling centre and disposed of in a manner which is compatible with the environment.
When the product becomes completely unserviceable and requires disposal, drain off any fluids (if applicable)
into approved containers and dispose of the product and the fluids according to local regulations.
NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specications and component parts without prior notice.
IMPORTANT: No liability is accepted for incorrect use of this product.
WARRANTY: Guarantee is 12 months from purchase date, proof of which will be required for any claim.
Sole UK Distributor, Sealey Group.
Kempson Way, Suffolk Business Park,
Bury St. Edmunds, Suffolk.
IP32 7AR
Carefully unpack the product and check the
contents against the list below. Should any
items be missing or damaged make immediate
contact with your Sealey dealer.
Part Description ..................................Qty .
A Upright Frame ............................................1
assembled by two people. The only tool
required is a rubber mallet. DO NOT use a
hard faced hammer as this will damage the
surface finish of the cross beams. Make sure
that all the clips lock in place securely before
using the unit. DO NOT use any parts that are
damaged and/or distorted as these may
assemble incorrectly and result in an
installation that is unsafe and which may cause
injury or damage when the shelves are loaded.
2.0See Fig.A. Support one end frame 'A' in a
vertical position and attach the end of one
cross beam 'B' to it at the base of one of
the uprights. Ensure that both tags on the end
brackets engage properly with the slots in the
uprights as shown in the inset diagram. Tap the
cross beam gently next to the end bracket so
that the beam is properly seated into the slots
in the upright. Connect the other end of the
beam to the existing racking unit at the same
height and tap into place.
3.0Attach another cross beam 'B' to the other side
of the end frames 'A' ensuring that it is at the
same level as the first cross beam. Attach 4
smaller cross beams 'D' between the main
cross beams 'B'.
4.0See Fig.B. Continue to assemble the next
three pairs of cross beams at the heights
C
required. The end frames allow adjustment in
3" increments. Each pair of beams must be
mounted at the same height. Ensure that all
tabs on the cross beam brackets are fully
engaged in the slots in the uprights and that
the cross beams are properly tapped down into
place.
5.0See Fig.C. Each wire deck 'C' is reinforced
with four cross members welded onto the
underside of the mesh. Each of these cross
members has a turned down tab at either end
that must pass through slots in the cross
beams. Place a wire deck onto each pair of
cross beams as shown ensuring that it sits into
the recessed section on the top surface of
each cross beam and all tabs pass through the
slots in the cross beams as shown in the inset
diagram at the top of Fig.C.