IMPORTANT:PLEASE READ THESE INSTRUCTIONS CAREFULLY. NOTE THE SAFE OPERATIONALREQUIREMENTS, WARNINGS & CAUTIONS. USETHE PRODUCT CORRECTLYAND WITH CARE FOR THE PURPOSE FOR WHICH IT IS INTENDED. FAILURE TO DO SO MAY CAUSE DAMAGE AND/ORPERSONAL INJURYAND WILL INVALIDATE THE WARRANTY. KEEPTHESE INSTRUCTIONS SAFE FOR FUTURE USE.
340KG/220KG CAPACITY PER LEVEL
mODEL NO’S: AP900R/AP1200R
Thank you for purchasing a Sealey product. Manufactured to a high standard, this product will, if used according to these instructions,
and properly maintained, give you years of trouble free performance.
Refer to
instruction
manual
Wear protective
gloves
1. SAFETY
WARNING! Ensure Health & Safety, and local authority regulations are adhered to when assembling and using these shelves.9 Locate shelves in a suitable area where they will not be an obstruction. 9 Keep the general area clean, uncluttered and ensure there is adequate lighting.
WARNING! Erect shelves on a level and solid surface such as concrete.9 Keep children and unauthorised persons away from the storage area.
8DO NOT use the shelvesfor any purpose other than that for which they are designed.8DO NOT site the shelves out of doors.8DO NOT get the shelves wet or use in damp or wet locations or areas where there is condensation. 8DO NOT clean the shelf supports with any solvents which may damage the coated surface.
9 Ensure that the shelves are properly assembled before loading them with any items.9 Where possible the unit should be fixed to the wall with suitable fixings9 Place heavier items on the lower shelves.9 Where possible heavier items should be evenly distributed across the shelves.
2. INTRODUCTION
Fully painted steel frame with ve chipboard shelves. 340/220kg capacity per level giving a maximum capacity of 1700kg/1100kg per rack
depending on model. Boltless design means no tools required to assemble. Slots together in minutes. Two piece uprights allow use as a single
bay rack or split into two separate shelf systems or workstations.
3. SPECIFICATION
Model no.AP900RAP1200R
Overall size W x D x H915 x 460 x 1830mm1220 x 460 x 1830mm
Capacity1700kg1100kg
Shelf capacity340kg220kg
Nett weight23.3kg33.66kg
4.1. Carefully unpack the product and check the contents against g.3. Should any items be damaged or missing contact your Sealey
stockist.
3
fig.
fig.
4
5. ASSEMbLY Fig.4
5.1. Fig.4
Support two upright angle posts (A) in a vertical position ensuring that the keyhole slots are pointing downwards. Join them together at
the base using a short ‘Z’ beam (C) ensuring that the shelf support is facing upwards. Tap the beam at either end, close to each angle
post to ensure that the rivets are seated at the bottom of the keyhole slots.
5
fig.
6
fig.
5.2. Fig.5
Continue to assemble the complete bottom frame in the order indicated above in fig.5 starting with a long ‘Z’ beam (B). Ensure that each ‘Z’ beam is facing upwards. Tap the beam at either end, close to each angle post to ensure that the rivets are seated at the bottom of the
keyhole slots.
5.3. Fig.6
Now make up an upper end frame by connecting two angle posts together at the top with a short ‘Z’ beam (C). Tap the beam at either
end to ensure that the rivets are properly seated at the bottom of the keyhole slots. Take a second short ‘Z’ beam and insert the top rivets
into the bottom keyholes. Only use the top rivets, the bottom rivets will be used to join the bottom and upper frames. Make up a
second upper end frame using the remaining two angle posts and a two short ‘Z’ beams.
Join the upper and bottom end frames together using the
open rivets on the short ‘Z’ beam (C) see detail in fig.7.
5.5. Fig.8
Stabilise the frame assembly by inserting a shelf support halfway up the frame. As each ‘Z’ beam is added ensure that the top rivets are
inserted into the bottom keyholes of the upper frame and the lower rivets are inserted into the top keyholes of the bottom frame as shown
below. Tap the beams at either end to ensure that the rivets are properly seated into the keyholes.
9
fig.
fig.
fig.
8
10
5.6. Fig.9
Now stabilise the top part of the frame by adding two long
Z’ beams (B) to make a shelf support at the top of the frame
as shown in fig.9. Ensure that the beams are the right way
up with the shelf support at the top. Tap the beams at either
end to ensure that the rivets are properly seated into the keyholes.
5.7. Fig.10
Build one shelf support in the top half of the frame and one shelf support in the bottom half of the frame at the heights required. (The
keyholes allow adjustment in 38mm/1
the beams at either end to ensure that the rivets are properly seated into the keyholes.
” increments). Ensure that the beams are the right way up with the shelf support at the top. Tap
Original Language Version
AP900R, AP1200R| Issue:3 (3) 26/02/19
fig.
11
fig.
12
13
fig.
5.8. Fig.11
Insert a post cap (E) into the top of each angle post ‘A’ as shown above. Lay a shelf ‘D’ in between the ‘Z’ beams at each level created
(see lower detail in fig.12.)
5.9. hALF hEIGhT STORAGE STATION See Fig.12
Follow steps for Fig.4 and Fig.5 to create a bottom frame with four ‘A’ posts attached. Using two long ‘Z’ beams (B) and two short ‘Z’
beams (C) insert a shelf support level at the top of the angle posts (A). Tap the beams at either end, close to each angle post to
ensure that the rivets are seated at the bottom of the keyhole slots. Insert another shelf support level at the desired height within the frame using additional long and short ‘Z’ beams and ensure that the rivets are seated at the bottom of the keyhole slots.
5.10. Fig.13
Now start to build the second low level unit by making up two end frames as shown in Fig.14. One short ‘Z’ beam (C) should be fixed at
the top of the angle posts and the other short ‘Z’ beam (C) should be fixed at the 7th and 8th keyholes up from the bottom of the angle
posts as shown below. Ensure that each ‘Z’ beam is facing upwards. Tap the beam at either end, close to each angle post to ensure that
the rivets are seated at the bottom of the keyhole slots.
Join the two end frames together using the four remaining long ‘Z’ beams as shown above. Ensure that each ‘Z’ beam is facing upwards.
Tap the beams at either end, close to each angle post to ensure that the rivets are seated at the bottom of the keyhole slots.
5.12. Fig.15
Lay the shelves into position between the ‘Z’ beams as shown above.
5.13. Fig.16
Place the two units end to end as shown below and join them together using 2 post clips (F). Insert a post cap (E) into the top of each ‘A’
post.
16
fig.
Parts support is available for this product. Please email sales@sealey.co.uk or telephone 01284 757500
ENVIRONMENT PROTECTION
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids
according to local regulations.
Note: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior
notice.
Important: No Liability is accepted for incorrect use of this product.
Warranty: Guarantee is 12 months from purchase date, proof of which is required for any claim.
Sealey Group, Kempson Way, Suffolk business Park, bury St Edmunds, Suffolk. IP32 7AR