Scotsman AC-EC 57, AC-EC 47, AC-EC 127, AC-EC 87, AC-EC 177 Service Manual

...
Page 1
Page 1
Page 1
Scotsman Ice Srl Via Lainate, 31 - 20010 Pogliano M.se - Milano - Italy Tel. +39-02-93960.1 (Aut. Sel.)- Telefax +39-02-93550500 Direct Line to Service & Parts: Phone +39-02-93960350 - Fax +39-02-93540449 Website: www.scotsman-ice.it E-Mail: scotsman.europe@scotsman.it
ISO 9001 - Cert. n. 0080
AC-EC 47 AC-EC 57
AC-EC 87 AC-EC 107 AC-EC 127 AC-EC 177
R 290 version
Electronic cubers with storage
PC Board version
REV. 10/2018
SERVICE MANUAL
Page 2
Page 2
Page 2
INDICE
2 3 6
9 12 15 17
19 19 19 19 20 20 21
Table of contents page Specifications AC-EC 47 Specifications AC-EC 57 Specifications AC-EC 87 Specifications AC-EC 107 Specifications AC-EC 127 Specifications AC-EC 177
GENERAL INFORMATION AND INSTALLATION
Introduction Unpacking and Inspection Location and levelling Electrical connections Water supply and drain connections Final check list Installation practice
OPERATING INSTRUCTIONS
Start up Operational checks
OPERATING PRINCIPLES (How it works)
Freezing cycle Harvest cycle Electrical sequence Components description
ADJUSTMENT, REMOVAL AND REPLACEMENT PROCEDURES
Adjustment of the cube size Wiring diagram AC-EC 47-57-87-107-177 Service diagnosis
MAINTENANCE AND CLEANING INSTRUCTIONS
General Icemaker Clean - Replace of air condenser filter Cleaning instructions of water system
39 40 42
22 23
28 30 31 34
45 45 45 46
Page 3
Page 3
Page 3
Important operating requirements:
Air temperature Water temperature Water pressure Electr. voltage variations from voltage rating specified on nameplate
MIN. 10°C 5°C 1 bar
-10%
°C °F
SPECIFICATIONS
CUBER MODEL AC-EC 47
NOTE
. With the unit in "built-in" conditions, the ice production is gradually reduced in respect to the levels shown in the graf, up to a maximum of 10% at room temperatures higher than 32°C. The daily ice-making capacity is directly related to the condenser air inlet temperature, water temperature conditions of the condenser air filter and age of the machine.
To keep your SCOTSMAN CUBER at peak performance levels, periodic maintenance checks must be carried out as indicated on Maintenance and Cleaning section of this manual.
MAX. 40°C 35°C 5 bar
+10%
ice making capacity
25
24.5 24
23.5 23
22.5 22
21.5 21
20.5 20
19.5 19
18.5 18
17.5 17
16.5 16
15.5 15
14.5
Kg.
32 27 21 15 10
AIR COOLED MODELS
WA TER TEMPERATURE
AMBIENT TEMPERATURE
ICE PRODUCED PER 24 HRS.
10
21
32
38
°C
o
°C
o
Page 4
Page 4
Page 4
AC 47 AS 6 Air AC 47 WS 6 Water
Stainless steel 1/4 9 Kg.
Start . Electric power cons.
Amps Kwh per 24 Hr
Model Cond. unit Finish Comp. HP
SPECIFICATIONS
Basic electr. Amps Watts Nr. of wires Amps fuse
230/50/1 2.1 12 400 3 x 1.5 mm
2
10
8
NYA
AC 47 - CUBER
machine specifications
Cubes per harvest: 18 medium * At 32/21 °C amb.-water
96**
NYA
Bin Water req. Capacity lt/24 HR
Page 5
Page 5
Page 5
Stainless steel 1/4 9 Kg.
Start . Electric power cons.
Amps Kwh per 24 Hr
Model Cond. unit Finish Comp. HP
SPECIFICATIONS
Basic electr. Amps Watts Nr. of wires Amps fuse
230/50/1 2.1 12 400 3 x 1.5 mm
2
10
8
NYA
Cubes per harvest: 18 medium * At 32/21 °C amb.-water
96**
NYA
Bin Water req. Capacity lt/24 HR
EC 47 AS 6 Air EC 47 WS 6 Water
EC 47 - CUBER
machine specifications
643
Page 6
Page 6
Page 6
MIN. 10°C 5°C
1 bar
-10%
Important operating requirements:
Air temperature Water temperature Water pressure Electr. voltage variations from voltage rating specified on nameplate
SPECIFICATIONS
CUBER MODEL AC-EC 57
MAX. 40°C 35°C 5 bar
+10%
ice making capacity
NOTE
. With the unit in "built-in" conditions, the ice production is gradually reduced in respect to the levels shown in the graf, up to a maximum of 10% at room temperatures higher than 32°C. The daily ice-making capacity is directly related to the condenser air inlet temperature, water temperature conditions of the condenser air filter and age of the machine.
To keep your SCOTSMAN CUBER at peak performance levels, periodic maintenance checks must be carried out as indicated on Maintenance and Cleaning section of this manual.
34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18
Kg.
32 27 21 15 10
AIR COOLED MODELS
WA TER TEMPERATURE
AMBIENT TEMPERATURE
ICE PRODUCED PER 24 HRS.
10
21
32
38
°C
o
°C
o
Page 7
Page 7
Page 7
AC 57 AS 6 Air AC 57 WS 6 Water
Stainless steel 1/4 12.5 Kg.
Start . Electric power cons.
Amps Kwh per 24 Hr
Model Cond. unit Finish Comp. HP
SPECIFICATIONS
Basic electr. Amps Watts Nr. of wires Amps fuse
230/50/1 2.1 12 400 3 x 1.5 mm
2
10
0 96* **
NYA
AC 57 - CUBER
machine specifications
Cubes per harvest: 24 medium * At 32/21 °C amb.-water
7.6
NYA
Bin Water req. Capacity lt/24 HR
Page 8
Page 8
Page 8
Stainless steel 1/4 12.5 Kg.
Start . Electric power cons.
Amps Kwh per 24 Hr
Model Cond. unit Finish Comp. HP
SPECIFICATIONS
Basic electr. Amps Watts Nr. of wires Amps fuse
230/50/1 2.1 12 400 3 x 1.5 mm
2
10
0 96* **
NYA
EC 57 - CUBER
machine specifications
Cubes per harvest: 24 medium * At 32/21 °C amb.-water
7.6
NYA
Bin Water req. Capacity lt/24 HR
EC 57 AS 6 Air EC 57 WS 6 Water
Page 9
Page 9
Page 9
MIN. 10°C 5°C
1 bar
-10%
Important operating requirements:
Air temperature Water temperature Water pressure Electr. voltage variations from voltage rating specified on nameplate
SPECIFICATIONS
CUBER MODEL AC-EC 87
MAX. 40°C 35°C 5 bar
+10%
ice making capacity
NOTE
. With the unit in "built-in" conditions, the ice production is gradually reduced in respect to the levels shown in the graf, up to a maximum of 10% at room temperatures higher than 32°C. The daily ice-making capacity is directly related to the condenser air inlet temperature, water temperature conditions of the condenser air filter and age of the machine.
To keep your SCOTSMAN CUBER at peak performance levels, periodic maintenance checks must be carried out as indicated on Maintenance and Cleaning section of this manual.
44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29
Kg.
32 27 21 15 10
AIR COOLED MODELS
WA TER TEMPERATURE
AMBIENT TEMPERATURE
ICE PRODUCED PER 24 HRS.
10 21
32
38
°C
o
°C
o
Page 10
Page 10
Page 10
AC 87 AS 6 Air AC 87 WS 6 Water
Stainless steel 1/3 19 Kg.
Start . Electric power cons.
Amps Kwh per 24 Hr
Model Cond. unit Finish Comp. HP
SPECIFICATIONS
Basic electr. Amps Watts Nr. of wires Amps fuse
230/50/1 3.2 20 570 3 x 1.5 mm
2
10
0143*
*NYA
AC 87 - CUBER
machine specifications
Cubes per harvest: 24 medium * At 32/21 °C amb.-water
10.8
NYA
Bin Water req. Capacity lt/24 HR
Page 11
Page 11
Page 11
EC 87 AS 6 Air EC 87 WS 6 Water
Stainless steel 1/3 19 Kg.
Start . Electric power cons.
Amps Kwh per 24 Hr
Model Cond. unit Finish Comp. HP
SPECIFICATIONS
Basic electr. Amps Watts Nr. of wires Amps fuse
230/50/1 3.2 20 570 3 x 1.5 mm
2
10
0143*
*NYA
EC 87 - CUBER
machine specifications
Cubes per harvest: 24 medium * At 32/21 °C amb.-water
10.8 NYA
Bin Water req. Capacity lt/24 HR
Page 12
Page 12
Page 12
MIN. 10°C 5°C 1 bar
-10%
Important operating requirements:
Air temperature Water temperature Water pressure Electr. voltage variations from voltage rating specified on nameplate
SPECIFICATIONS
ELECTRONIC CUBER MODEL AC-EC 107
MAX. 40°C 35°C 5 bar
+10%
ice making capacity
NOTE
. With the unit in "built-in" conditions, the ice production is gradually reduced in respect to the levels shown in the graf, up to a maximum of 10% at room temperatures higher than 32°C. The daily ice-making capacity is directly related to the condenser air inlet temperature, water temperature conditions of the condenser air filter and age of the machine.
To keep your SCOTSMAN CUBER at peak performance levels, periodic maintenance checks must be carried out as indicated on Maintenance and Cleaning section of this manual.
53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38
Kg.
32 27 21 15 10
AIR COOLED MODELS
WA TER TEMPERATURE
AMBIENT TEMPERATURE
ICE PRODUCED PER 24 HRS.
10
21
32
38
°C
o
°C
o
Page 13
Page 13
Page 13
AC 107 AS 6 Air AC 107 WS 6 Water
Stainless steel 1/3 23 Kg.
Start . Electric power cons.
Amps Kwh per 24 Hr
Model Cond. unit Finish Comp. HP
SPECIFICATIONS
Basic electr. Amps Watts Nr. of wires Amps fuse
230/50/1 3.2 20 580 3 x 1.5 mm
2
10
0125* *NYA
AC 107 - CUBER (R290 version)
machine specifications
Cubes per harvest: 32 medium * At 32/21 °C amb.-water
10.7 NYA
Bin Water req. Capacity lt/24 HR
Page 14
Page 14
Page 14
Stainless steel 1/3 23 Kg.
Start . Electric power cons.
Amps Kwh per 24 Hr
Model Cond. unit Finish Comp. HP
SPECIFICATIONS
Basic electr. Amps Watts Nr. of wires Amps fuse
230/50/1 3.2 20 580 3 x 1.5 mm
2
10
0125* *NYA
EC 107 - CUBER (R290 version)
machine specifications
Cubes per harvest: 32 medium * At 32/21 °C amb.-water
10.7 NYA
Bin Water req. Capacity lt/24 HR
EC 107 AS 6 Air EC 107 WS 6 Water
Page 15
Page 15
Page 15
MIN. 10°C 5°C 1 bar
-10%
Important operating requirements:
Air temperature Water temperature Water pressure Electr. voltage variations from voltage rating specified on nameplate
SPECIFICATIONS
ELECTRONIC CUBER MODEL AC-EC 127
MAX. 40°C 35°C 5 bar
+10%
ice making capacity
NOTE
. With the unit in "built-in" conditions, the ice production is gradually reduced in respect to the levels shown in the graf, up to a maximum of 10% at room temperatures higher than 32
°
C. The daily ice-making capacity is directly related to the condenser air inlet temperature, water temperature conditions of the condenser air filter and age of the machine.
To keep your SCOTSMAN CUBER at peak performance levels, periodic maintenance checks must be carried out as indicated on Maintenance and Cleaning section of this manual.
76
74
72
70
68
66
64
62
60
58
56
54
52
50
48
46
Kg.
32 27 21 15 10
AIR COOLED MODELS
WATER TEMPERATURE
AMBIENT TEMPERATURE
ICE PRODUCED PER 24 HRS.
10 21
32
38
°C
o
°C
o
Page 16
Page 16
Page 16
AC-EC 127 AS 6 Air AC-EC 127 WS 6 Water
Stainless steel 1/2 39 Kg.
Start . Electric power cons.
Amps Kwh per 24 Hr
Model Cond. unit Finish Comp. HP
SPECIFICATIONS
Basic electr. Amps Watts Nr. of wires Amps fuse
230/50/1 4.5 20.5 670 3 x 1.5 mm
2
10
177**
AC-EC 127 - CUBER
machine specifications
Cubes per harvest: 56 medium * At 21°C water temperature
Dimensions: HEIGHT (without legs) 920 mm.
HEIGHT (with legs) 1009 mm. WIDTH 680 mm. DEPTH 600 mm. WEIGHT 70 Kgs.
12.9.0
Bin Water req. Capacity lt/24 HR
920
Page 17
Page 17
Page 17
MIN. 10°C 5°C 1 bar
-10%
Important operating requirements:
Air temperature Water temperature Water pressure Electr. voltage variations from voltage rating specified on nameplate
SPECIFICATIONS
ELECTRONIC CUBER MODEL AC-EC 177
MAX. 40°C 35°C 5 bar
+10%
ice making capacity
NOTE
. With the unit in "built-in" conditions, the ice production is gradually reduced in respect to the levels shown in the graf, up to a maximum of 10% at room temperatures higher than 32°C. The daily ice-making capacity is directly related to the condenser air inlet temperature, water temperature conditions of the condenser air filter and age of the machine.
To keep your SCOTSMAN CUBER at peak performance levels, periodic maintenance checks must be carried out as indicated on Maintenance and Cleaning section of this manual.
97 96 95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67
Kg.
32 27 21 15 10
AIR COOLED MODELS
WA TER TEMPERATURE
AMBIENT TEMPERATURE
ICE PRODUCED PER 24 HRS.
10 21
32
38
°C
o
°C
o
Page 18
Page 18
Page 18
Stainless steel 3/4 48 Kg.
AC-EC 177 AS 6 Air AC-EC 177 WS 6 Water
Start . Electric power cons.
Amps Kwh per 24 Hr
Model Cond. unit Finish Comp. HP
SPECIFICATIONS
Basic electr. Amps Watts Nr. of wires Amps fuse
230/50/1 4 22 1000 3 x 1.5 mm
2
16
150**
AC-EC 177 - CUBER
machine specifications
Cubes per harvest: 56 medium * At 21°C water temperature
Dimensions: HEIGHT (without legs) 990 mm.
HEIGHT (with legs) 1079 mm. WIDTH 680 mm. DEPTH 600 mm. WEIGHT 70 Kgs.
17.4.0
Bin Water req. Capacity lt/24 HR
Page 19
Page 19
Page 19
Forward the completed self-addressed registration card to Frimont factory.
11. If necessary, replace the four standard legs with the taller ones supplied in the machine and adjust them to level the unit.
C. LOCATION AND LEVELLING
WARNING. This Ice Cuber is designed for indoor installation only. Extended periods of operation at temperatures exceeding the following limitations will constitute misuse under the terms of the SCOTSMAN Manufacturer’s Limited Warranty resulting in LOSS of warranty coverage.
1. Position the unit in the selected permanent location. Criteria for selection of location include:
a) Minimum room temperature 10°C (50°F)
and maximum room temperature 40°C (100°F).
b) Water inlet temperatures: minimum 5°C
(40°F) and maximum 35°C (90°F).
c) Well ventilated location for air cooled
models.
d) Service access: adequate space must be left for all service connections through the rear of the ice maker. A minimum clearance of 15 cm (6") must be left at the sides of the unit for routing cooling air drawn into and exhausted out of the compartment to maintain proper condensing operation of air cooled models.
2. Level the unit in both the left to right and front to rear directions.
D. ELECTRICAL CONNECTIONS
See data plate for current requirements to determine wire size to be used for electrical connections. All SCOTSMAN icemakers require a solid earth wire. All SCOTSMAN ice machines are supplied from the factory completely pre-wired and require only electrical power connections to the wire cord provided at rear of the unit. Make sure that the ice machine is connected to its own circuit and individually fused (see data plate for fuse size). The maximum allowable voltage variation should not exceed -10% and + 10% of the data plate rating. Low voltage can cause faulty functioning and may be responsible for serious damage to the overload switch and motor windings.
NOTE.
All external wiring should conform to national, state and local standards and regulations.
A. INTRODUCTION
This manual provides the specifications and the step-by-step procedures for the installation, start­up and operation, maintenance and cleaning for the SCOTSMAN AC-EC series icemakers. These Cubers are quality designed, engineered and manufactured. Their ice making systems are thoroughly tested providing the utmost in flexibility to fit the needs of a particular user. These icemakers have been engineered to our own rigid safety and performance standards.
NOTE
. To retain the safety and performance built into this icemaker, it is important that installation and maintenance be conducted in the manner outlined in this manual.
B. UNPACKING AND INSPECTION
1. Call your authorized SCOTSMAN Distributor or Dealer for proper installation.
2.
Visually inspect the exterior of the packing and skid. Any severe damage noted should be reported to the delivering carrier and a concealed damage claim form filled in subjet to inspection of the contents with the carrier’s representative present.
3. a) Cut and remove the plastic strip securing the carton box to the skid.
b) Cut open the top of the carton and remove the polystyre protection sheet.
c) Pull out the polystyre posts from the corners and then remove the carton.
4. Remove the front panel of the unit and inspect for any concealed damage. Notify carrier of your claim for the concealed damage as steted in step 2 above.
5. Check that refrigerant lines do not rub against or touch other lines or surfaces, and that the fan blade moves freely.
6. Check that the compressor fits snugly onto all its mounting pads.
7. Remove all internal support packing and masking tape.
8. Use clean damp cloth to wipe the surfaces inside the storage bin and the outside of the cabinet.
9. See data plate on the rear side of the unit and check that local main voltage corresponds with the voltage specified on it.
CAUTION. Incorrect voltage supplied to the icemaker will void your parts replacement program.
10. Remove the manufacturer’s registration card from the inside of the User Manual and fill­in all parts including: Model and Serial Number taken from the data plate.
GENERAL INFORMATION AND INSTALLATION
Page 20
Page 20
Page 20
Check voltage on the line and the ice maker’s data plate before connecting the unit.
E. WATER SUPPLY AND DRAIN
CONNECTIONS GENERAL
When choosing the water supply for the ice cuber consideration should be given to:
a) Length of run
b) Water clarity and purity
c) Adequate water supply pressure Since water is the most important single ingredient
in producting ice you cannot emphasize too much the three items listed above. Low water pressure, below 1 bar may cause malfunction of the ice maker unit. Water containing excessive minerals will tend to produce cloudy coloured ice cubes, plus scale build-up on parts of the water system.
WATER SUPPLY Air Cooled Versions
Connect the 3/4" male fitting of the solenoid water inlet valve, using the flexible tube supplied, to the cold water supply line with regular plumbing fitting and a shut-off valve installed in an accessible position between the water supply line and the unit. If water contains a high level of impurities, it is advisable to consider the use an appropriate water filter or conditioner.
Water supply - Water cooled models
The water cooled versions of SCOTSMAN Ice Makers require two separate inlet water supplies, one for the water sprayed for making the ice cubes and the other for the water cooled condenser. Connect the 3/4" GAS male fitting of the water inlet, using the flexible tubing or a 3/8" O.D. copper pipe, to the cold water supply line with regular plumbing fitting and a shut-off valve installed in an accessible position between the water supply line and the unit.
WATER DRAIN
The recommended drain tube is a plastic or flexible tube with 18 mm (3/4") I.D. which runs to an open trapped and vented drain.
WATER DRAIN - WATER COOLED MODELS
Connect the 3/4" male fitting of the condenser water drain, utilizing a second flexible hose, to the open trapped and vented drain.
NOTE.
The water supply and the water drain must be installed to conform with the local code. In some case a licensed plumber and/ or a plumbing permit is required.
WATER DRAIN - EC version
The water can be pumped out up to 1.5 m rise or
to 30 m on horizontal length.
F. FINAL CHECK LIST
1. Is the unit in a room where ambient temperatures are within a minimum of 10°C (50°F) even in winter months?
2. Is there at least a 15 cm (6") clearance around the unit for proper air circulation?
3. Is the unit level? (IMPORTANT)
4. Have all the electrical and plumbing connections been made, and is the water supply shut-off valve open?
5. Has the voltage been tested and checked against the data plate rating?
6. Has the water supply pressure been checked to ensure a water pressure of at least 1 bar (14 psi).
7. Check all refrigerant lines and conduit lines to guard against vibrations and possible failure.
8. Have the bolts holding the compressor down been checked to ensure that the compressor is snugly fitted onto the mounting pads?
9. Have the bin liner and cabinet been wiped clean?
POWER
WATER INLET
WATER DRAIN
HAND DISCONNECT
SWITCH
WATER
FILTER
WATER
VALVE
POWER
WATER INLET
WATER DRAIN
HAND DISCONNECT
SWITCH
WATER
FILTER
WATER
VALVE
Page 21
Page 21
Page 21
G. INSTALLATION PRACTICE
1. Hand shut-off valve
2. Water filter
3. Water supply line (flexible hose)
4. 3/4" male fitting
5. Vented drain
6. Open trapped vented drain
7. Drain fitting
8. Main switch
9. Power line
WARNING. This icemaker is not designed for outdoor installation and will not function in ambient temperatures below 10°C (50°F) or above 40°C (100°F). This icemaker will malfunction with water temperatures below 5°C (40°F) or above 35°C (90°F).
1
2
3
4
5
6
7
8
9
10. Has the owner/user been given the User Manual and been instructed on the importance of periodic maintenance checks?
11. Has the Manufacturer’s registration card been filled in properly? Check for correct model
and serial number against the serial plate and mail the registration card to the factory.
12. Has the owner been given the name and the phone number of the authorized SCOTSMAN Service Agency serving him?
Page 22
Page 22
Page 22
START UP
After having correctly installed the ice maker and completed the plumbing and electrical connections, perform the following “Start-up” pro­cedure.
A. Turn the unit ON by the main switch. Unit will start up in charging cycle mode.
NOTE. Every time the unit returns under power, after having been switched off, the water inlet valve, the hot gas valve and the water drain valve get energized for a period of 5 minutes, thus to admit new water to the machine sump reservoir to fill it up and, eventually, to wash-off any dirt that can have deposited in it during the unit off period (Fig.1).
B. During the water filling operation, check to see that the incoming water dribbles, through the evaporator platen dribbler holes, down into the sump reservoir to fill it up and also that the
OPERATING INSTRUCTIONS
incoming surplus of water flows out through the overflow pipe into the drain line.
During the water filling phase the components energized are:
THE WATER INLET SOLENOID VALVE THE HOT GAS SOLENOID VALVE THE WATER DRAIN SOLENOID VALVE (ONLY
AC/EC 127-177).
NOTE. If in the 5 minutes lenght of the water
filling phase the machine sump reservoir does not get filled with water up to the rim of the overflow pipe, it is advisable to check:
1.The water pressure of the water supply line that must be at least 1 bar (14 psig) Minimum (Max 5 bar-70 psig).
2.The filtering device installed in the water line that may reduce the water pressure below the Minimum value of 1 bar (14 psig).
3. Any clogging situation in the water circuit like the inlet water strainer and/or the flow control.
FIG. 1
16
15
13
2
1
7
8
9
10
3
4
5
6
11
12
Rx Tx
WATER IN VALVE
HOT GAS VALVE
COMPRESSOR
FAN MOTOR
WATER PUMP
- EVAPORATOR
- CONDENSER
TEMPERATURE SENSORSBIN
TRANSF.
D ATA
PROCESSOR
ELECTR.
TIMER
DIP SWITCH
ELECTRONIC CARD
L
N
RELAYS
RELAY
TRIAC
WATER DRAIN VALVE
Page 23
Page 23
Page 23
In case of air condenser filter clogged such to prevent the proper flow of the cooling air or, in case the fan motor is out of operation or shortage of water in the water cooled condenser, the condenser temperature rises and when it reaches 70°C (160°F) - for air cooled version - or 60°C (140°F) - for water cooled version - the condenser temperature sensor shuts-off the ice maker with the consequent light-up of the RED WARNING LED (Fig.3) as well as the Red Alarm Light (ON Steady).
After having diagnosed the reason of the rise of temperature and removed its cause, it is necessary to Switch OFF (wait few seconds) and Switch ON the unit, thus to put the machine in condition to initiate a new freezing cycle.
The machine restarts with the usual 5 minutes water filling phase in order to provide enough water into the sump tank.
C. At completion of the water filling phase (5 minutes) the unit passes automatically into the freezing cycle with the start up of:
COMPRESSOR WATER PUMP FAN MOTOR (in air cooled version) controlled by
the condensing temperature sensor located within the condenser fins (Fig.2).
OPERATIONAL CHECKS D. Install, if required, the refrigerant service
gauges on both the high side and low side Scraeder valves to check the compressor head and suction pressures.
NOTE. On air cooled models, the condenser temperature sensor, which is located within the condenser fins, keep the head (condensing) pressure between values as per discharge pressure details at pag. 31.
FIG. 2
16
15
13
2
1
7
8
9
10
3
4
5
6
11
12
Rx Tx
WATER IN VALVE
HOT GAS VALVE
COMPRESSOR
FAN MOTOR
WATER PUMP
- EVAPORATOR
- CONDENSER
TEMPERATURE SENSORSBIN
TRANSF.
D ATA
PROCESSOR
ELECTR.
TIMER
DIP SWITCH
ELECTRONIC CARD
L
N
RELAYS
RELAY
TRIAC
WATER DRAIN VALVE
Page 24
Page 24
Page 24
E. Check to see through the ice discharge opening that the spray system is correctly seated and that the water jets uniformely reach the
interior of the inverted mold cups; also make sure that the plastic curtain is hanging freely and there is not excessive water spilling through it.
FIG. 3
FIG. 4
16
15
13
2
1
7
8
9
10
3
4
5
6
11
12
Rx Tx
WATER IN VALVE
HOT GAS VALVE
COMPRESSOR
FAN MOTOR
WATER PUMP
- EVAPORATOR
- CONDENSER
TEMPERATURE SENSORSBIN
TRANSF.
D ATA
PROCESSOR
ELECTR.
TIMER
DIP SWITCH
ELECTRONIC CARD
L
N
RELAYS
RELAY
TRIAC
WATER DRAIN VALVE
61
51
31
2
1
7
8
9
01
3
4
5
6
11
21
xTxR
EVLAVNIRETAW
EVLAVSAGTOH
ROSSERPMOC
ROTOMNAF
PMUPRETAW
ROTAROPAVE-
RESNEDNOC-
TEMPERATURE SENSORSBIN
.FSNART
DATA
PROCESSOR
.RTCELE
REMIT
PID
HCTIWS
DRACCINORTCELE
L
N
SYALER
YALER
CAIRT
EVLAVNIARDRETAW
Page 25
Page 25
Page 25
F. The ice making process takes place thereby, with the water sprayed into the molds that gets gradually refrigerated by the heat exchange with the refrigerant flowing into the evaporator serpentine. During the freezing process, the evaporator temperature falls to 0°C (Red Led blinking as per Fig. 4) and then to -15°C (Red Led ON steady as per Fig. 4a). When it reaches
-15°C the evaporator temperature sensor supplies a low voltage power signal to the electronic control device (P.C.BOARD) in order to activate an electronic timer. This one takes over the control of the freezing cycle up to the complete formation of the ice cubes.
NOTE. The lenght of the entire freezing cycle is governed by the evaporator tempe­rature sensor which has its probe placed in contact with the evaporator serpentine (Non adjustable) in combination with the electronic timer (Adjustable) incorporated in the P.C.BOARD. The timer adjustment is factory set in consideration of the ice maker type, cooling version and ice cube size (Small, Medium, Large). It is possible, however, to modify the timed lenght of the freezing cycle, by changing the DIP SWITCH keys setting. In Table B of PRINCIPLE OF OPERATION are shown the various time extensions of the freezing cycle second phase, in relation with the different DIP SWITCH keys setting.
G. After about 17÷20 minutes from the begin- ning of the freezing cycle, in an hypothetic ambient temperature of 21°C, the defrost cycle takes place with the hot gas, the water inlet
and the water drain valves simoultaneously activated (Fig. 5). The electrical components in operation on models are:
COMPRESSOR WATER INLET VALVE HOT GAS VALVE WATER DRAIN VALVE only AC/EC 127-177 WATER PUMP
on the first 15 seconds on models only AC/EC 127-177.
NOTE. The lenght of the defrost cycle is automatically determinated by the micro­processor of the P.C. BOARD in relation of the time necessary for the unit to reduce the evaporator temperature from 0°C (32°F) small Red LED blinking to -15°C (5°F) small Red LED ON steady - TIME T2. I
t is possible to extend the length of the defrost
cycle by changing the setting of DIP SWITCH 7 and 8 as shown on table at page 37.
H. Check, during the defrost cycle, that the incoming water flows correctly into the sump reservoir in order to refill it and that the surplus overflows through the overflow drain tube.
I. Check the texture of ice cubes just released. They have to be in the right shape with a small depression of about 5-6 mm in their crown. If not, wait for the completion of the second cycle before performing any adjustment.
FIG. 4a
16
15
13
2
1
7
8
9
10
3
4
5
6
11
12
Rx Tx
WATER IN VALVE
HOT GAS VALVE
COMPRESSOR
FAN MOTOR
WATER PUMP
- EVAPORATOR
- CONDENSER
TEMPERATURE SENSORSBIN
TRANSF.
D ATA
PROCESSOR
ELECTR.
TIMER
DIP SWITCH
ELECTRONIC CARD
L
N
RELAYS
RELAY
TRIAC
WATER DRAIN VALVE
Page 26
Page 26
Page 26
Optical level sensor (IR); place some ice cubes between IR optical sensing eyes. The Bin Full YELLOW LED starts blinking (Fig. 6), and when defrost cycle is over, the unit stops with the simultaneous glowing of the same LED to monitor the BIN FULL situation (Fig. 6a).
• Whenever necessary, pcb can be "calibrated" to assure the best comunication between the same and ice level device just by turn the Main switch OFF an ON again.
Take the hand out from the ice level control sensors to allow the resumption of the light beam. After approximately 6 seconds the ice maker resume its operation with the immediate glowing of the FIRST YELLOW LED indicating UNIT IN
OPERATION and the extinguishing of the “BIN FULL” YELLOW LED.
NOTE. The ICE LEVEL CONTROL (INFRARED SYSTEM) is independent of
the temperature however, the reliability of its detection can be affected by external light radiations or by any sort of dirt and scale sediment which may deposit directly on the light source and on the receiver.To prevent any possible ice maker malfunction, due to negative affection of the light detector, it is advisable to locate the unit where it is not reached by any direct light beam or light radiation, also it is recommended to keep the bin door constantly closed and to follow the instructions for the periodical cleaning of the light sensor elements as detailed in the MAINTENANCE AND CLEANING PRO­CEDURES. This ice maker is equipped by an I/R self­calibration PC Board every time ice maker is turned OFF and ON by the main switch.
FIG. 5
16
15
13
2
1
7
8
9
10
3
4
5
6
11
12
Rx Tx
WATER IN VALVE
HOT GAS VALVE
COMPRESSOR
FAN MOTOR
WATER PUMP
- EVAPORATOR
- CONDENSER
TEMPERATURE SENSORSBIN
TRANSF.
D ATA
PROCESSOR
ELECTR.
TIMER
DIP SWITCH
ELECTRONIC CARD
L
N
RELAYS
RELAY
TRIAC
WATER DRAIN VALVE
If the ice cubes are shallow and cloudy, it is possible that the ice maker runs short of water during the freezing cycle second phase or, the quality of the supplied water requires the use of an appropriate water filter or conditioner. Only EC version as soon as the water into the Sealed Water Reservoir reaches the maximum level, the two metal pins close the electrical contact through the water, transmitting a low voltage current to the PC Board.
The PC Board activates the Water Drain Pump for 8 seconds pumping out most of the water contained into the Sealed Water Reservoir.
J. Upon the model, these icemakers range shall operate either by IR control device which operates by sensing eyes or Thermal sensor. Thermal sensor can detecting both the low tem­perature of the ice also the mass of the ice near its sensing bulb.
For testing devices:
Storage bin thermal sensor; place some ice cubes in contact with the bulb, icemaker turn OFF at the end of harvest cycle. Remove ice from the bulb, ice maker restart from new freezing cycle.
Page 27
Page 27
Page 27
FIG. 6
16
15
13
2
1
7
8
9
10
3
4
5
6
11
12
Rx Tx
WATER IN VALVE
HOT GAS VALVE
COMPRESSOR
FAN MOTOR
WATER PUMP
- EVAPORATOR
- CONDENSER
TEMPERATURE SENSORSBIN
TRANSF.
D ATA
PROCESSOR
ELECTR.
TIMER
DIP SWITCH
ELECTRONIC CARD
L
N
RELAYS
RELAY
TRIAC
WATER DRAIN VALVE
FIG. 6a
16
15
13
2
1
7
8
9
10
3
4
5
6
11
12
Rx Tx
WATER IN VALVE
HOT GAS VALVE
COMPRESSOR
FAN MOTOR
WATER PUMP
- EVAPORATOR
- CONDENSER
TEMPERATURE SENSORSBIN
TRANSF.
D ATA
PROCESSOR
ELECTR.
TIMER
DIP SWITCH
ELECTRONIC CARD
L
N
RELAYS
RELAY
TRIAC
WATER DRAIN VALVE
K. Remove, if fitted, the refrigerant service gauges and re-fit the unit service panels previously removed.
L. Instruct the owner/user on the general operation of the ice machine and about the cleaning and care it requires.
Page 28
Page 28
Page 28
PRINCIPLE OF OPERATION
How it works
In the SCOTSMAN cube ice makers the water used to make the ice is kept constantly in circulation by an electric water pump which primes it to the spray system nozzles from where it is diverted into the inverted mold cups of the evaporator. A small quantity of the sprayed water freezes into ice; the rest of it cascades by gravity into the sump assembly below for recirculation.
FREEZING CYCLE (Fig. A and B)
The hot gas refrigerant discharged out from the compressor reaches the condenser where, being cooled down, condenses into liquid. Flowing into the liquid line it passes through the drier filter, then it goes all the way through the capillary tube where, due to the heat exchanging action, it looses some of its heat content so that its pressure and temperature are lowered as well. Next the refrigerant enters into the evaporator serpentine (which has a larger I.D. then the capillary) and starts to boil off; this reaction is emphasized by the heat transferred by the sprayed water. The refrigerant then increases in volume and changes entirely into vapor. The vapor refrigerant then passes through the suction accumulator (used to prevent that any small amount of liquid refrigerant may reach the compressor) and through the suction line. In both the accumulator and the suction line it exchanges heat with the refrigerant flowing into the capillary tube (warmer), before to be sucked in the compressor and to be recirculated as hot compressed refrigerant gas.
The freezing cycle is controlled by the evaporator temperature sensor (which has its probe in contact with the evaporator serpentine) that determines the length of its first portion of the cycle. When the temperature of the evaporator serpentine drops to a pre-set value (small Red LED ON steady) the evaporator sensor probe changes its electrical resistance allowing a low voltage current (15 volts) to flow to the P.C. BOARD which in turn activates an electronic timer. The timer, which is built-in the P.C. BOARD, takes over from the evaporator temperature sensor, the control of the freezing cycle up to its completion.
NOTE. The change of the electric potential of the evaporator sensor with the consequent activation of the timer (Time mode) is signalled by the glowing-up of the RED LED located in the front of the P.C. BOARD.
ATTENTION. In case, after 15 minutes from the beginning of the freezing cycle, the temperature of the evaporator sensor probe is higher then 0° C (32°F) - small Red LED still OFF - (shortage of refrigerant, inoperative hot gas valve, etc.) the P.C. BOARD switch OFF immediately the unit with the simultaneous blinking of the WARNING RED LED.
The length of this timed portion of the freezing cycle is pre-fixed and related to the setting of the first four DIP SWITCH keys. The DIP SWITCH keys setting is made in consideration of the type of condenser used and size of ice cubes.
AC-EC M 47 A AC-EC M 47 W AC-EC M 57 A AC-EC M 57 W AC-EC M 87 A AC-EC M 87 W AC-EC M 107 A AC-EC M 107 W AC-EC M 127 A AC-EC M 127 W AC-EC M 177 A AC-EC M 177 W
OFF
OFF
ON
OFF
ON
TAB. A
1234
56 7 8 9 10
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
ON
ON
ON
ON
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
ON
OFF
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
OFF
OFF
OFF
OFF
OFF
ON
ON
ON
ON
ON
DIP SWITCH FACTORY SETTING COMBINATIONS (PER MODEL AND VERSION)
DIP SWITCH
FREEZING CYCLE
DEFROST CYCLE
15/30"
AIR/WATER
DEFROST CYCLE
ADD. TIME
Page 29
Page 29
Page 29
FIG. B
FIG. A
FIG. D
FIG. C
Page 30
Page 30
Page 30
the ice maker model with the growing of the ice thickness with the cubes fully formed in the cup molds. The total length of the freezing cycle ranges from 20 to 25 minutes.
DEFROST OR HARVEST CYCLE (Fig.C and D)
As the electronic timer has carried the system throughout the second phase of freezing cycle, the defrost cycle starts.
ATTENTION. In case the unit is able to reach 0°C (32°F) evaporating temperature within 15 minutes, but after 45 minutes from the beginning of the freezing cycle it has not yet reached the evaporator tem­perature of -15°C (5°F) the machine goes straight into the defrost cycle omitting the timed portion of the freezing cycle relied to the setting of the first four DIP SWITCHES.
NOTE. The length of the defrost cycle is
related to the length of the second phase of freezing cycle T2. (Time to drop the evaporating temperature from 0°C (32°F) ­small Red LED blinking - to -15°C (5°F) small Red LED ON steady. I
t is possible to extend the length of the defrost
cycle by changing the setting of DIP SWITCH 7 and 8 as shown on table at page 34.
The electrical components in operation during this phase are:
COMPRESSOR WATER INLET VALVE HOT GAS VALVE WATER DRAIN VALVE (ONLY AC/EC 127-177)
and the
WATER PUMP
on the first 15 seconds. The incoming water, passing through the water
inlet valve and the flow control, runs over the evaporator platen and then flows by gravity through the dribbler holes down into the sump/ reservoir. (Fig. D ) The water filling the sump/reservoir forces part of the surplus water from the previous freezing cycle to go out to the waste through the overflow pipe. This overflow limits the level of the sump water which will be used to produce the next batch of ice cubes. Meanwhile, the refrigerant as hot gas, discharged from the compressor, flows through the hot gas valve directly into the evaporator serpentine by-passing the condenser. The hot gas circulating into the serpentine of the evaporator warms up the copper molds causing the defrost of the ice cubes. The ice cubes, released from the cups, drop by gravity onto a slanted cube chute, then through a curtained opening they fall into the storage bin. At the end of the defrost cycle, the hot gas valve, the water inlet valve and the water drain valve close and the machine starts again a new freezing cycle.
In Table B are indicated the various lengths of the timed portion of freezing cycle in relation to the different combinations of the DIP SWITCH KEYS. In Table A are illustrated the DIP SWITCH keys combinations for the different models and versions as they are set in the factory. The electrical components in operation during the freezing cycle are:
COMPRESSOR FAN MOTOR (in air cooled version) WATER PUMP
and during the second phase of freezing cycle (Time mode) they are joined by the
ELECTRONIC TIMER
The refrigerant head pressure, at avarage 21 °C amb. temp., in the course of the freezing cycle, ranges between 15,5 - 10 bar according to the model in the air cooled version, being controlled by the temperature sensor probe located within the condenser fins. On the air cooled version, the condenser tempe­rature sensor, when senses a rising of the condenser temperature beyond the pre-fixed limit, changes its electrical resistance and transmits a low voltage power flow to the Micro Processor of P.C. BOARD which in turn energizes, through a TRIAC, the FAN MOTOR. When the opposite situation occures, i.e. the condenser temperature gets below the pre-fixed limit, the temperature sensor changes again its electrical resistance reducing therefore the current flow to the P.C. BOARD to cause the fan motor temporary cut-off.
NOTE. In case the condenser temperature probe senses that the condenser temperatu­re has rised to 70°C (160°F) - on air cooled versions - or 60°C (140°F) - on water cooled versions - for one of the following reasons:
CLOGGED CONDENSER (Air cooled version)
INSUFFICIENT FLOW OF COOLING WATER (Water cooled version)
FAN MOTOR OUT OF OPERATION (Air
cooled version)
AMBIENT TEMPERATURE HIGHER THEN 40°C (100°F)
it causes the total and immediate SHUT-OFF
of the machine in order to prevent the unit from operating in abnormal and dangerous conditions. When the ice maker stops on account of this protective device, there is a simultaneous glowing of the RED LED and RED LIGHT (STEADY), warning the user of the Hi Temperature situation. After having eliminated the source of the condenser hi­temperature, to restart the machine it is necessary to switch OFF (wait few seconds) and switch ON again the unit. The ice machine resumes its normal operation by
going through
the 5 minutes water filling phase.
At the start of the freezing cycle the refrigerant suction or lo-pressure starts from 3,8 - 7,7 bar and it declines gradually to 1,8 - 0,6 according to
Page 31
Page 31
Page 31
HARVEST (Drain portion - first 15 sec.)
Electrical components (Loads) ON OFF
Compressor............................................
Fan Motor (Air cooled only)and TRIAC .........
Hot Gas Valve ........................................
Water Inlet Valve....................................
Water Drain valve
(only AC/EC 127-177)
P.C.Board Relay 1 & 2 Coil....................
P.C.Board Relay 3 Coil
...............................
Water Pump ...........................................
P.C.B. Timer...........................................
Electronic Controls & Sensors ON OFF
Evaporator Sensor .................................
Condenser Sensor .................................
Ice Level Control ....................................
HARVEST (Water filling portion)
Electrical components (Loads) ON OFF
Compressor............................................
Fan Motor (Air cooled only)and TRIAC .........
Hot Gas Valve ........................................
Water Inlet Valve....................................
Water Drain valve
(only AC/EC 127-177)
P.C.Board Relay 1 & 2 Coil....................
P.C.Board Relay 3 Coil
...............................
Water Pump ...........................................
P.C. Board Timer ...................................
Electronic Controls & Sensors ON OFF
Evaporator Sensor .................................
Condenser Sensor .................................
Ice Level Control ....................................
OPERATING CHARACTERISTICS
OPERATING PRESSURE (bar) at 21°C amb. Temp.
AC 47 AC 57 AC 87 AC 107 AC 127 AC 177
SUCTION PRESSURE beg./end freezing
2,8/0,8 3,5/1,1 2,8/1,8 2,8/0,6 2,7/1,1 3,2/0,7
DISCHARGE PRESSURE
12/10,5 12,5/11 12/10,5 13/10 12/10,5
15,5/10,5
REFRIGERANT METERING DEVICE:
capillary tube
REFRIGERANT CHARGE (R 290) grs:
Air cooled Water cooled
AC/EC 47 100 AC/EC 57 100 AC/EC 87 100 AC/EC 107 120 AC/EC 127 130 AC/EC 177 170
AC 177 110 gr (3.88 oz.)
OPERATION - CONTROL SEQUENCE
At the start of freezing cycle the evaporator tem­perature sensor controls the length of the first part of the freezing cycle. As it reaches a predeter­mined temperature it supplies a low voltage current to the P.C. BOARD in order to activate the electronic timer which takes over the control of the freezing cycle for a pre-fixed time according to the DIP SWITCH keys setting (see Tab. B).
NOTE. The evaporator temperature sensor, factory pre-set, is the same for all the models and is not adjustable in the field.
Once completed the timed portion of the freezing cycle the system goes automatically into the defrost cycle which has also a pre-fixed length. At completion of the defrost cycle the P.C. BOARD command the unit to start again a new freezing cycle.
OPERATION - ELECTRICAL SEQUENCE
The following charts illustrate which switches and which components are ON or OFF during a particular phase of the icemaking cycle. Refer to the wiring diagram for a reference.
BEGINNING FREEZE
Electrical components (Loads) ON OFF
Compressor ...........................................
Fan Motor (Air cooled only) and TRIAC ........
Hot Gas Valve ........................................
Water Inlet Valve....................................
Water Drain Valve
(only AC/EC 127-177)
P.C.Board Relay 1 Coil ..........................
P.C.Board Relay 2 & 3 Coil....................
Water Pump ...........................................
P.C.B. Timer...........................................
Elctronic Controls & Sensors ON OFF
Evaporator Sensor .................................
Condenser Sensor .................................
Ice Level Control ....................................
TIMED FREEZE
Electrical components (Loads) ON OFF
Compressor............................................
Fan Motor (Air cooled only) and TRIAC ........
••
Hot Gas Valve ........................................
Water Inlet Valve....................................
Water Drain Valve
(only AC/EC 127-177)
P.C.Board Relay 1 Coil ..........................
P.C.Board Relay 2 & 3 Coil....................
Water Pump ...........................................
P.C.B. Timer...........................................
Electronic Controls & Sensors ON OFF
Evaporator Sensor .................................
Condenser Sensor .................................••
Ice Level Control ....................................
Page 32
Page 32
Page 32
COMPONENTS
The components of the Pump Out Water Drain System are
• Sealed water tank
• PC Board & Sensor
• Sealed Water Pump
• Check Valve
OPERATION
All water coming from the overflow, and from the melted ice is collected inside the Sealed Water Reservoir.
As soon as the water into the Sealed Water Reservoir reaches the maximum level, the two metal pins close the electrical contact through the water, transmitting a low voltage current to the PC Board.
The PC Board activates the Water Drain Pump for 8 seconds pumping out most of the water contained into the Sealed Water Reservoir.
PWD SYSTEM (EC version only)
The water can be pumped out up to 1.5 m rise or
to 30 m on horizontal length.
POWER
WATER INLET
WATER DRAIN
HAND DISCONNECT
SWITCH
WATER
FILTER
WATER
VALVE
POWER
WATER INLET
WATER DRAIN
HAND DISCONNECT
SWITCH
WATER
FILTER
WATER
VALVE
A Check Valve, located on the water drain hose, prevents the coming back of the discharged water.
Page 33
Page 33
Page 33
SCHEMATIC SYSTEM
Storage bin
Overflow drain tube
Storage bin drain tube
Water tank inlet fitting
Sealed water tank
Water pump
Check valve
Vented tube
Water
level
sensors
Drain out
Drain fitting
Page 34
Page 34
Page 34
COMPONENTS DESCRIPTION
A. EVAPORATOR TEMPERATURE
SENSOR
The evaporator temperature sensor probe, located in contact with the evaporator serpentine, detects the dropping of the evaporator tempera­ture during the freezing cycle and signals it by supplying a current flow to the micro processor of P.C. BOARD. According to the current received is energized the small Red LED of the PC Board (blink or steady). When steady, the micro processor supplies power to the electronic timer built into the P.C. BOARD so that it takes control of the last portion of freezing cycle. The length of the timed phase is pre-fixed by the setting of the keys 1, 2, 3 and 4 of the DIP SWITCH.
NOTE. Whenever, after 15 minutes from the beginning of the freezing cycle, the evaporating temperature have not yet reached the value of 0°C (32°F) - small Red LED OFF
- the P.C.Board switches OFF the machine with the BLINKING of WARNING RED LED.
B. CONDENSER TEMPERATURE
SENSOR
The condenser temperature sensor probe, located within the condenser fins (air cooled version) or in contact with the tube coil (water cooled version) detects the condenser temperature variations and signals them by supplying current, at low voltage, to the P.C. BOARD. In the air cooled versions, in relation to the different current received, the micro processor of the P.C. BOARD supplies, through a TRIAC, the power at high voltage to the fan motor so to cool the condenser and to reduce its tempera­ture. In case the condenser temperature rises and reaches 70°C (160°F) - on air cooled models - or 60°C (140°F) - on water cooled models - the
current arriving to the micro processor is such to cause an immediate and total stop of the machine operation.
C. ICE LEVEL THERMAL PROBE
It operayes in detecting both the low tempera­ture of the ice and the mass near the bin sensing bulb.
D. ICE BIN LEVEL LIGHT CONTROL
The electronic ice bin level control, located into the storage bin, has the function to stop the operation of the ice machine only at the end of the harvest cycle when the light beam between the light source and the sensor is interrupted by the ice cubes stored into the bin. When the light beam is interrupted the Bin Full YELLOW LED starts to blink; the ice machine stops with the glowing-up of the Bin Full YELLOW LED to monitor the situation of ice bin full at the end of the harvest cycle. Six seconds after the scoop out of the ice (with the resumption of the light beam between the two infrared sensor of ice level control) the ice machine restarts again with the extinguishing of the YELLOW LED.
E. P.C. BOARD
(Data processor)
The P.C. BOARD, fitted in its plastic box located in the front of the unit, consists of two separated printed circuits one at high and the other at low voltage integrated with fuse on power out (6.3 A), of four aligned LEDS monitoring the operation of the machine, of one extra monitoring RED LED (blink 0°C - steady - 15°C), of one DIP SWITCH with ten keys, of one push button, of input terminals for the leads of the sensor probes and input and output terminals for the leads of the ice maker electrical wires.
Page 35
Page 35
Page 35
The P.C. BOARD is the brain of the system and it elaborates, through its micro processor, the signals received from the three sensors in order
6-12
MONTHS
EC SERIES
0 OR 60 MINUTES
DELAY
TEST
ON STEADY
BLINKING
0-12
MONTHS
to control the operation of the different electrical components of the ice maker (compressor, water pump, solenoid valves, etc.).
At restart, from any tripping OFF at Bin Full, the new PC Board assures 45 seconds water filling phase so to refill the water sump up to the maximum level. In case of malfunction of the Optical Ice Level Control, thenew PC Board switch ON alternativelt the Yellow and Red Led continuously.
On the PC Board there are four jumpers to select:
• 0 or 12 months remind time for the water system cleaning
• Operation of the Purge Out Water Pump (Jump IN on EC series)
• "no delay" or 60 minutes delay time at first start up
• TEST
In case the TEST contacts are closed with the Jumper, at the Start Up of the machine the PC Board energizes all the electrical components for maximum 3 minutes time.
At the end of the 3 minutes the PC Board switch OFF the entire machine with the blinking of all the LED's as shown on the bottom drawing.
Page 36
Page 36
Page 36
F. PUSH BUTTON OPERATION
DURING WATER FILLING PHASE
• Push for more then 2” but less then 5” the
machine enters in Cleaning Mode
• Push for more then 5” the machine by-pass
the Water Filling Phase
DURING FREEZING/HARVEST CYCLE
• Push for more then 5” during the Freezing
cycle the machine goes immediately into Harvest
• Push for more then 5” during the Harvest cycle
the machine enters immediately in the Freezing cycle
The length of Harvest is equal to:
•35” if Push Button is activated before ­15°C evaporating temperature LED activation
•As per Harvest cycle chart, if Push Button is activated after -15°C evaporating temperature LED activation (Red LED inside PC Board ON steady)
• Push more then 20” to restore remind cleaning
timer.
G. LED MEANING GREEN LED ON
Unit under power
YELLOW BIN FULL LED ON
Unit shut-OFF at storage bin full
YELLOW BIN FULL LED BLINKING
Infrared beam break out
RED ALARM LED ON
Too hi condensing temperature
RED ALARM LED BLINKING
Too hi evaporating temperature
YELLOW FREEZING CYCLE ON
Unit in freezing cycle mode
YELLOW FREEZING LED AND RED ALARM LED ON
Condenser sensor out of order
YELLOW FREEZING LED AND RED ALARM LED BLINKING
Evaporator sensor out of order
FREEZING CYCLE
BIN FULL
POWER
TOO HI EVAP TEMP
TOO HI COND TEMP
PUSH BUTTON
PUSH BUTTON
LED STATUS
REASON WHY
ON STEADY UNIT UNDER POWER
ON STEADY FREEZING CYCLE
BLINKING
60 MINUTES DELA Y AT START UP JUMPER J3 OUT
ON STEADY
TOO HI DISCHARGE PRESSURE/TEMP
BLINKING
TOO HI EVAP. TEMP. (> 0C°) AFTER 15’ FROM START UP
ON STEADY UNIT OFF AT BIN FULL
BLINKING
SLOW
I/R BEAM CUTTED
I/R ON AFTER TRIP OFF AT BIN FULL
BLINKING
FAST
ON STEADY I/R CALIBRATION DONE
BLINKING
UNIT IN CLEANING MODE OR TRIPPING OFF AFTER TEST - JUMPER TEST IN
ON STEADY
CONDENSER SENSOR OUT OF ORDER
BLINKING
EVAPORATOR SENSOR OUT OF ORDER
BLINKING
ALTERNATIVELY
I/R SENSOR OUT OF ORDER
PUSH
PUSH > 5” DURING WATER FILLING TO
MOVE THE UNIT INTO FREEZING
PUSH > 5” DURING FREEZING
TO MOVE THE UNIT INTO DEFROST
PUSH > 5” DURING DEFROST
TO MOVE THE UNIT INTO FREEZING
PUSH 2” > 5” DURING WATER FILLING
TO MOVE THE UNIT INTO CLEANING
PUSH DURING THE 60 MIN START UP
DELAY TIME TO BY-PASS IT
H. DIP SWITCH
The P.C.BOARD which controls the entire operation of the ice maker, has a DIP SWITCH with ten switching keys which allow to set up the micro processor program in order to extend
or to shorten the length of freezing cycle in relation to the different model and versions of ice machines.
The DIP SWITCH first four keys setting
determines the length of the 2nd phase of freezing cycle (controlled by the electronic timer) as detailed in the table B.
The DIP SWITCH keys 5 & 6 setting determines the length of the defrost cycle according to the
Page 37
Page 37
Page 37
LENGTH OF TIMED PORTION OF FREEZING CYCLE ACCORDING TO THE
DIP SWITCH SETTING COMBINATIONS
TAB. B
size of the cubes (Large or Medium) as per the following setting: ON ON : PROGRAM A ON OFF : PROGRAM B OFF OFF : PROGRAM C OFF ON : PROGRAM D
LENGTH OF HARVEST CYCLE
ACCORDING TO THE TIME TO DROP THE
EVAP. TEMPERATURE FROM 0°C TO -15°C
LENGTH PROGRAMS
HARVEST
CYCLE
ABC D
180” Up to 6’30” *** Up to 9’30” xxxx 165” 6’30”-7’ Up to 3’ 9’30”-10’ xxxx 150” 7’-8’ 3’-3’15’ 10’-11’ xxxx 135” 8’-9’ 3’15”-3’30” 11’-12’ xxxx 120” 9’-10’30” 3’30”-4’30” 12’-13’30” < 3' 105” 10’30”-12’ 4’30”-6’ 13’30”-15’ 3' - 4'
90” >12’ >6’ >15’ > 4'
The DIP SWITCH N° 7 and 8 allow the extention of the length of the harvest/defrost cycle according to their combination as per following chart:
DIP SWITCH ADDITIONAL DEFROST TIME
78
ON ON 0
OFF ON 30"
ON OFF 60"
With both DIP SWITCH 7 & 8 in OFF position, Water Pump is OFF during the Harvest Cycle with no additional time.
The 9th key is used to supply power to the water pump for the first 15 seconds of the defrost cycle
- position OFF - or for the first 30 seconds -
position ON. The 10th key is used to modify the CUT-OUT
condensing temperature from 70°C (160°F) for the air cooled versions - ON position - to 60°C (140°F) - OFF position - for the water cooled versions.
I. CONDENSER AIR FILTER
(Air cooled version)
Located in front of the air cooled condenser can be removed by withdrawing it through the opening of the front panel for cleaning or replacing. A lower plastic guide, installed inside the unit, is used for the correct sliding and location of the air filter.
L. WATER SPRAY SYSTEM
Through its nozzles, the water pumped, is sprayed in each individual cup to be frozen into ice. It consists of one spray tube wheve are located several spray nozzles.
M. WATER PUMP
The water pump operates continually throughout the freezing cycle and on the first 15 or 30 seconds of the defrost cycle so to such the remaining water from the sump tank (reach in mineral salts) and drain it out. During the freezing cycle the pump primes the water from the sump to the spray system and through the spray nozzles sprays it into the inverted cup molds to be frozen into crystal clear ice cubes. It is recommended that the pump motor bearings be checked at least every six months.
N. WATER INLET SOLENOID VALVE -
3/4 MALE FITTING
The water inlet solenoid valve is activated by the micro processor of the P.C. BOARD during the first 5 minutes of water filling phase as well as during the defrost cycle. When energized it allows a metered amount of incoming water to flow over the evaporator cavity to assist the hot gas in defrosting the ice cubes. The water running over the evaporator cavity drops by gravity, through the dribbler holes of the platen, into the sump reservoir where it will be sucked by the water pump and primed to the spray system.
Page 38
Page 38
Page 38
O. WATER INLET SOLENOID VALVE -
3/4 MALE FITTING (AC/EC 47-57-87-107 only)
A second water inlet solenoid valve is used on water cooled version. An automatic hi pressure control activates the coil of the water inlet solenoid valve so to supply a metered amount of water to the condenser and drop down its temperature and pressure.
P. HOT GAS SOLENOID VALVE
The hot gas solenoid valve consists basically in two parts: the valve body and the valve coil. Located on the hot gas line, this valve is energized through the micro processor of P.C. BOARD during the defrost cycle as well as during the water filling phase. During the defrost cycle the hot gas valve coil is activated so to attract the hot gas valve piston in order to give way to the hot gas discharged from compressor to flow directly into the evaporator serpentine to defrost the formed ice cubes.
Q. FAN MOTOR (Air cooled version)
The fan motor is controlled through the P.C. BOARD and the TRIAC by the condenser tempe­rature sensor. Normally it operates only during the freezing cycle to draw cooling air through the condenser fins. In the second part of the freezing cycle, the fan motor can run at intermittance as the condenser pressure must be kept between two corresponding head pressure values.
R. COMPRESSOR
The hermetic compressor is the heart of the refrigerant system and it is used to circulate and retrieve the refrigerant throughout the entire system. It compresses the low pressure refrigerant vapor causing its temperature to rise
and become high pressure hot vapor which is then released through the discharge valve.
S. HI PRESSURE CONTROL
(AC/EC 47-57-87-107 only)
Used only on the water cooled versions it operates to keep between 9.5 and 10.5 bars (135 ÷ 150 psig) the hi-side or discharge pressure of the refrigerant system by energizing the coil of the water inlet solenoid valve that control the cooling water flow to the condenser.
T. WATER REGULATING VALVE
(AC/EC 127-177 only)
This valve controls the head pressure in the refrigerant system by regulating the flow of water going to the condenser. As pressure increases, the water regulating val­ve opens to increase the flow of cooling water.
U. WATER DRAIN SOLENOID VALVE
(AC/EC 127-177 only)
The water drain solenoid valve, electrically connected in parallel to the water inlet and to the hot gas solenoid valves, is energized for all the length of the defrost cycle. By means of the water pump, that remains energized for 15 seconds at the beginning of the defrost cycle, it allows the drain out of all remaining water (rich of minerals deposited during the previous freezing cycle) from the sump tank. By doing so it allows to the ice maker to make every new freezing cycle with new fresh water, avoiding thereby the accumulation of sediments and scales, which soon or later will cause the partial or total clogging of the water system on the unit.
Page 39
Page 39
Page 39
SMALL IDENTATION
LITTLE OR NO ICE IN CENTER OF CUBES
THICK BULGE SOLID ICE
ADJUSTMENT PROCEDURES
A. ADJUSTMENT OF THE CUBE SIZE
CAUTION. Before performing actual adjustment of the cube size , check other possible causes for cube size problems, refer to the Service Diagnosis Section for problem review and analysis. Do not perform any adjustment till the icemaking system has progressed through several complete freezing and harvest cycle, to observe size and quality of ice cubes and whether or not the cube size problem exists.
I. If the cubes are shallow size (Indentation is
too deep) probably the length of the second phase of the freezing cycle is too short so, to extend such length you have to:
1. Locate the DIP SWITCH on the front of the P.C.Board.
2. Take note of the combination of the first four DIP SWITCH KEYS and check the corrisponding length of freezing cycle 2nd phase on Table B.
3. Set the same DIP SWITCH KEYS to correspond to the prior combination shown on Table B which allow an extention of two more minutes of the length of the freezing cycle.
4. Observe the ice cubes in the next two harvests and eventually repeat steps 2 and 3 above until proper ice cubes size is achieved. See figure.
II. If the cubes are oversize size (Indentation is too full) probably the length of the second phase of the freezing cycle is too long. To shorten such length you have to:
1. Locate the DIP SWITCH on the front of the P.C.Board.
2. Take note of the combination of the first four DIP SWITCH KEYS and check the corrisponding length of freezing cycle 2nd phase on Table B.
3. Set the same DIP SWITCH KEYS to correspond to the next combination shown on Table B which allow a reduction of two minutes of the length of the freezing cycle.
4. Observe the ice cubes in the next two harvests and eventually repeat steps 2 and 3 above until proper ice cubes size is achieved. See figure.
Page 40
Page 40
Page 40
WIRING DIAGRAM
AC-EC 47-57-87-107-177 AIR AND WATER COOLED 230/50-60/1
The unit is shown on freezing cycle
Page 41
Page 41
Page 41
Page 42
Page 42
Page 42
SERVICE DIAGNOSIS
SYMPTOM POSSIBLE CAUSE SUGGESTED CORRECTION
Unit will not run Blown power in fuse in P.C.Board Replace fuse & check for cause of (No warning LEDS glows) blown fuse
Main switch in OFF position Turn switch to ON position Inoperative P.C.Board Replace P.C.Board Loose electrical connections Check wiring
(Green LED-Power ON glows) Blown power out fuse in P.C. Board Replace fuse & check for cause of
blown fuse
(Bin full LED glows) Inoperative ice level control Clean or replace ice level control
Inoperative P.C.Board Replace P.C.Board
(Red-alarm LED-LIGHT glows) High head pressure Inoperative fan motor. Replace
Shortage of water (WC)
(Red-alarm LED blinks) High evaporating temperature Hot gas valve leak - Replace it.
after 15 mins. beginning freeze Water inlet valve leak - Replace it.
Short of refrigerant. Compressor cycles intermittently
(Freezing LED + Red-alarm LED glows)
Condenser sensor out of order Replace it and Red-alarm Light blinks twice and repeat
(Freezing LED + Red-alarm LED blinks)
Evaporator sensor out of order Replace it
Compressor cycles intermittently Low voltage Check circuit for overloading
Check voltage at the supply to the building. If low, contact the power
company Non-condensable gas in system Purge the system Compressor starting device with Check for loose wires in starting
loose wires device Mechanical problem Replace compressor
Cubes too small Freezing cycle too short Review setting of DIP SWITCH keys
Capillary tube partially restricted Blow charge, add new gas & drier,
after evacuating systemwithvacuum
pump Moisture in the system Same as above Shortage of refrigerant Check for leaks & recharge
Cloudy cubes Shortage of water See remedies for shortage of water
Dirty water supply Use water softner or water filter Accumulated impurities Use SCOTSMAN Ice Machine
cleaner
Page 43
Page 43
Page 43
SYMPTON POSSIBLE CAUSE SUGGESTED CORRECTION
Shortage of water Water spilling out through curtain Check or replace curtain
Water solenoid valve not opening Replace valve Water leak in sump area Locate and repair Water flow control plugged Replace water inlet valve Leak of water drain valve Replace valve
Irregular cubes size & some Some jets plugged Remove jet cover and clean cloudy
Shortage of water See shortage of water Unit not level Level as required
Cubes too large Freezing cycle too long
Review setting of DIP SWITCH keys
Decreased ice capacity Inefficient compressor Replace
Leaky water valve Repair or replace Non-condensable gas in system Purge the system Poor air circulation or excessive Relocate the unit or provide for
hot location (Red-alarm LED glows
) more ventilation
Overcharge of refrigerant
Correct the charge. Purge off slowly
Capillary tube partially restricted Blow charge, add new gas & drier,
after evacuating system with
vacuum pump Hot gas solenoid valve leaking Replace valve Short of refrigerant Charge to data plate indication
Discharge head pressure too high See incorrect discharge pressure
Poor harvest Restriction in incoming water line
Check water valve strainer and flow
control. If necessary enlarge the
flow control orifice
Water inlet valve not opening Valve coil with open winding
Replace valve
Hot gas valve orifice restricted Replace hot gas valve assy
Clogged air vented holes in mold cups
Clean out holes plugged
Discharge head pressure too low See incorrect discharge pressure
SERVICE DIAGNOSIS
Page 44
Page 44
Page 44
SYMPTON POSSIBLE CAUSE SUGGESTED CORRECTION
Unit won’t harvest Inoperative P.C.Board Replace P.C.Board
Hot gas valve not opening Valve coil with open winding
Replace valve
Water solenoid valve not opening Valve coil with open winding
Replace valve
Incorrect discharge pressure Inoperative condenser sensor Replace sensor
Inoperative P.C.Board Replace P.C.Board
Water regulating valve misadjusted
Adjust its setting stem
Excessive water in unit base Water tubing leaking Check. Tighten or replace
SERVICE DIAGNOSIS
Page 45
Page 45
Page 45
MAINTENANCE AND CLEANING INSTRUCTIONS
A. GENERAL
The periods and the procedures for maintenance and cleaning are given as guides and are not to be construed as absolute or invariable. Cleaning, especially, will vary depending upon local water and ambient conditions and the ice volume produced; and, each icemaker must be maintened individually, in accordance with its particular location requirements.
B. CLEAN - REPLACE OF AIR
CONDENSER FILTER
NOTE. The new AC series, in the air cooled
version, are standard equipped with an air condenser filter as well as a Cleaning Reminder Board to remind to the end user the need for the cleaning of the air filter or of the water system (Red Alarm Light ON Steady or Blinking rispectively with machine in operation).
1. Withdraw the air filter from the front through the opening of the front panel.
2. Blow pressurised air on the opposite direction of the condenser air flow so to remove the dust accumulated.
3. If pressurised air is not available, use tap water always in the counter flow air diretcion. Once cleaned shake it so to remove most of the accumulated water, then dry it using an hair dryer.
NOTE. In case the air filter strainer is damaged replace it with a new one.
4. Install it again by pushing it through the front panel opening.
A. ICEMAKER
The following maintenance should be scheduled at least two times per year on these icemakers.
1. Check and clean the water line strainer.
2. Check that the icemaker is levelled in side
to side and in front to rear directions.
3. Check for water leaks and tighten drain line connections.
Pour water down bin drain line to be sure that drain line is open and clear.
4. Check size, condition and texture of ice cubes. Perform adjustment of cube size control as required.
5. Check the ice level control sensor to test shut-off. Put your hand between the light source and the receiver so to cut off the light beam for at least one minutes.
This should cause the ice maker to shut off and the light up of the 2nd LED (yellow light) a the end of defrost cycle.
NOTE. Within few seconds after the removal of the hand from the Infrared sensing light the icemaker restarts in freezing cycle. The ice level control uses devices that sense light, therefore they must be kept clean enough so they can "see". Every month clean/wipe the sensing "eyes" with a clean soft cloth.
6. Check for refrigerant leaks.
B.
CLEANING/SANITISING INSTRUCTIONS OF WATER SYSTEM
Clean-sanitise the water system, evaporator, bin and spray jets using a solution of SCOTSMAN Ice Machine Cleaner/Sanitizer.
Page 46
Page 46
Page 46
NOTE. Cleaning requirements vary according to the local water conditions and individual user operation. Continuous check of the clarity of ice cubes and visual inspection of the water spraying parts before and after cleaning will indicate frequency and procedure to be followed in local areas.
1. Remove the front and top panels to gain access either to the control box and to the evaporator.
2. Make sure that all ice cubes have been released from their cups, then switch OFF the machine at front master button switch.
3. Scoop out all the ice cubes stored into the bin in order to prevent them from being contaminated with the cleaning solution.
4. Remove the plastic cup located on the bottom of sump/freezing chamber to drain out all water and scale deposits.
5. Lift up and remove the curtain.
6. Lift up the entire spray platen from its bottom seat and take it out to clean it separately.
7. Using a bottle, poor fresh water into the bottom of the sump/freezing chamber to clean out most of scale deposit.
8. Install again the spray platen, the curtain as well as the bottom plastic cup.
Cleaning
9. Prepare the cleaning solution by diluting in a plastic container two liters of warm water (45°­50°C) with 0,2 liters of Ice Machine Cleaner.
WARNING. The SCOTSMAN Ice Machine Cleaner contains Phosphoric and Hydroxyacetic acids. These compounds are corrosive and may cause burns if swallowed, DO NOT indu­ce vomiting. Give large amounts of water or milk. Call Physician immediately. In case of external contact flush with water. KEEP OUT OF THE REACH OF CHILDREN.
10. Remove the evaporator cover then slowly pour onto the evaporator platen the cleaning solution. With the help of a brush dissolve the most resistant and remote scale deposits in the platen.
11. Switch ON again the machine at front master button switch then push the PC BOARD
Page 47
Page 47
Page 47
FIG. 8
16
15
13
2
1
7
8
9
10
3
4
5
6
11
Rx Tx
WATER IN VALVE
HOT GAS VALVE
FAN MOTOR
WATER PUMP
- EVAPORATOR
- CONDENSER
TEMPERATURE SENSORSBIN
TRANSF.
D ATA
PROCESSOR
ELECTR.
TIMER
DIP SWITCH
ELECTRONIC CARD
L
N
RELAYS
RELAY
TRIAC
WATER DRAIN VALVE
COMPRESSOR
12
PUSH BUTTON for more then 2" and less of 5" to put the machine in cleaning mode.
NOTE.
With the system in CLEANING/ RINSING mode the water pump is the only component in operation to circulate the cleaning solution in the entire water system while the three leds of the PC Board are blinking (Fig. 8).
12. Let the unit to remain in the CLEANING mode for about 20 minutes then unplug again the machine.
NOTE.
The amount of Cleaner and the time needed for the cleaning of water system depends of the water conditions.
13. Switch OFF the ice maker at master button switch then flush out the cleaning solution from the sump reservoir by taking off the sump plastic cup. Once flushed out install again the sump plastic cup.
14. Pour onto the evaporator cavity two or three liters of clean potable water to rinse the mold cups and the platen.
15. Switch ON again the machine. The water pump is again in operation to circulate the water in order to rinse the entire water system. Do the operation as per steps 13 and 14 twice so to be sure no more traces of descaling solution remains into the sump.
REMEMBER. To prevent the accumulation of undesirable bacteria it is necessary to sanitize the interior of the storage bin with an anti-algae disinfectant solution every week.
Sanitation
NOTE. Sanitation of the water system is
recommended to be done once a month.
1. Prepare in a plastic container the sanitation solution as per manufacturer dilution using warm water (45-50 °C).
NOTE. Never mix the cleaning with the sanitising solution.
Page 48
Page 48
Page 48
16
15
14
13
2
1
7
8
9
10
3
4
5
6
11
Rx Tx
WATER IN VALVE
HOT GAS VALVE
FAN MOTOR
WATER PUMP
- EVAPORATOR
- AMBIENT
- CONDENSER
TEMPERATURE SENSORSBINCOMPRESSOR
TRANSF.
DATA
PROCESSOR
ELECTR.
TIMER
DIP SWITCH
ELECTRONIC CARD
L
N
RELAYS
RELAY
TRIAC
WATER DRAIN VALVE
CONTACTOR COIL
12
FIG. 8
2. Follow the procedures as per cleaning water pump operation, only by keeping pushed Reset button between 2 ÷ 5" during water filling. Just shorting the operation of the water pump to 10 minutes.
3. Place again the evaporator cover and the unit service panels.
4. At completion of the freezing and harvest cycle make sure of proper texture and clearness of the ice cubes and that, they do not have any acid taste.
ATTENTION. In case the ice cubes are cloudy-white and have an acid taste, melt them immediately by pouring on them some warm water. This to prevent that somebody could use them.
5. Wipe clean and rinse the inner surfaces of the storage bin.
REMEMBER.
To prevent the accumulation of undesirable bacteria it is necessary to sanitize every week the interior of the storage bin.
Loading...