Savory SG, SG-18C Service Manual

PARTS & SERVICE MANUAL for SG Series Hot Dog Grills
Model SG-22 Hot Dog Grill (Shown with SW-22 Food Warmer)
THIS MANUAL SHOULD BE RETAINED FOR FUTURE USE
1200-JDM
07087
WARNING: DISCONNECT UNIT FROM POWER SOURCE BEFORE ATTEMPTING ANY SERVICE PROCEDURE
General Instructions: The following instructions refer to all models in the SG Series hot dog grills. The SG-18 model will vary slightly due to having only one motor, but the parts replace instructions remain essentially the same. The right and left side of the unit is determined by facing the front (control switch) side of the grill. The left side switch controls the front 5 (#1 thru #5) rollers on the grill. The right side switch controls the rear 5 (#6 thru #10) rollers.
A Panel Removal:
1. All parts replacement procedures will require the removal of one or both side panels and/or the bottom panel.
2. To remove either side panel; remove the 8 sheet metal screws.
3. To remove the bottom panel; tilt the grill up from the front and rest on the back of the unit. Remove the 6 sheet metal screws. (SG-34 model has 10 screws)
B Control Switch Replacement:
(Figure 1, 4 & 5)
1. Remove bottom panel. (Section A)
2. Remove the 2 slotted screws and spacers securing the switch to the front panel. Note proper orienta­tion of spacers.
3. Disconnect wire leads from switch terminals.
4. Remove switch from underside of unit.
5. Insert new switch from underside of unit and secure with the 2 slotted screws and spacers.
6. Re-attach wire leads to switch terminals. (Refer to appropriate wiring diagram)
C Power Indicator Light Replace­ment:
(Figure 1, 4 & 5)
1. Remove bottom panel. (Section A)
2. Disconnect the wire leads from back of light.
3. Press spring loaded tabs on back of light and push through front of panel.
4. Insert new light from front of unit and snap into place.
5. Re-attach wire leads to light terminals. (Refer to appropriate wiring diagram)
D Terminal Block Replacement:
(Figure 4 & 5)
1. Remove bottom panel and appropriate side panel. (Section A)
2. Remove the 2 screws and nuts securing the terminal block to the unit.
3. Disconnect wire leads from terminal block, noting proper orientation.
4. Secure new terminal block to unit with the 2 screws and nuts.
5. Re-attach wire leads to terminal block. (Refer to appropriate wiring diagram)
E Motor & Motor Sprocket Replace­ment:
(Figure 2, 3, 4 & 4)
1. Remove bottom panel and appropriate side panel. (Section A)
2. Loosen the 4 motor mounting nuts securing the motor to the unit and slide motor to loosen drive chain tension. Slip drive chain off motor sprocket (and idler sprocket on SG-18 models).
3. Disconnect wire leads from motor terminals.
4. Remove the loosened motor mounting nuts and remove motor.
5. Before installing new motor, transfer the motor fan and sprocket from the old motor to the ne motor. Note proper orientation of fan blades. To remove the motor sprocket from the motor shaft, loosen the set screw in the sprocket with an Allen wrench, and slip sprocket off shaft. Note proper orientation of set
screws (on the flat portion of the motor shaft) and the sprocket.
6. Secure new motor (with fan and sprocket in place) to unit with the 4 motor mounting nuts. Do NOT tighten nuts.
7. Place drive chain around motor sprocket (and over idler sprocket on SG-18 models).
8. Slide motor to tighten drive chain tension and tighten the 4 motor mounting nuts.
9. Re-attach wire leads to motor terminals. (Refer to appropriate wiring diagrams)
2
ELECTRICAL SPECIFICATIONS
MODEL VOLTAGE AMPS KW
SG-18 120V 8.3 1.0
SG-22 120V 10.0 1.2 SG-34 120V 14.1 1.7
F Idler Sprocket/Idler Sprocket Screw Replacement: (For SG­18 models only)
(Figure 3 & 4)
1. Remove bottom panel and side panel. (Section A)
2. Remove nut and lock washer and screw securing idler sprocket to unit. Note
location of spacer behind idler sprocket.
3. When installing new idler sprocket insert screw from underside of unit. Replace spacer, sprocket, lock washer and nut from motor side.
4. NOTE: When replacing idler sprocket on idler sprocket screw, be sure that the sprocket teeth are properly seated in drive chain.
5. Tighten idler sprocket screw and nut.
G Power Cord Replacement:
(Figure 4 & 5)
1. Remove bottom panel. (Section A)
2. Disconnect the green ground wire from the unit.
3. Disconnect the 2 wire nuts.
4. Remove the strain relief bushing with plyers.
Note proper orientation of flat and round sides of the strain relief bushing.
5. Reverse this procedure to install new power cord. (Refer to appropriate wiring diagram)
H Individual Heating Element Replacement:
(Figure 2 & 3)
1. Remove both side panels. (Section A)
2. ON SG-18 MODELS: When replacing elements on this unit, remove the appropri­ate 5-way jumper weldment. ON SG-22/SG-34 MODELS: When replac­ing element #1, 3, 5, 6, 8 or 10, remove the appropriate 3-way jumper.
I DRIVE CHAIN REPLACEMENT
(Figure 2 & 3)
1. Remove appropriate side panel. (Section A)
2. Loosen (but do not remove) the 4 motor mounting nuts.
3. Slide motor to loosen drive chain tension and slip chain
4. Remove all jumpers on motor side of unit. (Note orienta-
5. Remove the 2 nuts and washers from the weld studs
6. Remove the drive chain.
7. When placing the new drive chain over the roller sprock-
8. Replace the drive chain guide(s), making sure element
9. Re-position drive chain around motor sprocket (and idler
ON SG-22/SG-34 MODELS: When replacing element #2, 4, 7 or 9, remove the appropriate 2-way jumper.
IMPORTANT: NOTE PROPER ORIEN­TATION OF WIRE LEADS AND POSI­TION OF JUMPERS.
3. On opposite end of element you are replacing, remove the screw securing it to the 5-way jumper.
DO NOT REMOVE THE 5-WAY JUMPER.
4. Slide element out of roller from the motor side of the unit.
5. Insert new element, making sure that the element terminal ends are in proper position.
6. Secure opposite end of element to 5-way jumper.
7. Replace appropriate jumper on motor side of unit.
off motor sprocket (and idler sprocket on SG-18 mod­els).
tion of wire leads and proper positioning of jumpers). that secure the drive chain guide to the unit and remove
the guide. (There are 2 chain guides on the SG-18 models).
ets, make sure it lies flat and rests on each tooth of the roller sprockets.
terminal ends are positioned properly and guide is properly seated.
sprocket on SG-18 models). Slide motor to tighten drive chain tension and tighten the 4 motor mounting nuts.
3
Loading...
+ 5 hidden pages