Troubleshooting 117 - 118
Diagnostic #1 - Signal Information 119
Diagnostic #2 - Signal Quality 120
Diagnostic #3 - Manufacturing Default 120 - 121
Diagnostic #4 - Battery Voltage 121
Warranty 122
FCC Statement 123
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER
CLOCK OR REPEATER BEFORE POWERING THE
SECONDARY WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must
be properly installed, powered, and set up BEFORE
you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not powered,
the secondary clocks will not synchronize.
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
DANGER
!!
SHOCK HAZARD
,
• Keep the electricity to this device
turned OFF until the clock installation
is complete.
• Do not expose the clock movement to
water, or install the clock in a location
where it may be exposed to water.
H
|
NOTICE
• Do not install the clock outdoors.
Damage to the clock if placed outdoors
voids the warranty.
• Do not hang objects from the clock or
clock mounting parts. The clocks are not
designed to support the weight of other
objects.
• The clock face and housing may
be cleaned with a damp cloth or
disinfectant. Test other cleaning products
on a small part of the clock housing
before attempting to use on the rest of
the clock. Avoid bleach and chemicals
known to dissolve plastics.
WARNING
FIRE HAZARD
• Always follow your national and
regional electrical codes or ordinances.
• The AC power circuit for the clock
must be attached to a circuit breaker that
can be reset by the user.
PHYSICAL INJURY HAZARD
• If you are standing on an object while
installing your clock, make sure that the
object can support your weight, and will
not sway or move as you stand on it.
• Take precautions to avoid injury by
potential safety hazards near the point
of installation including (but not limited
to) heavy machinery, sharp objects, hot
surfaces, or exposed cables carrying an
electric current.
• Follow all mounting instructions exactly
as stated in this manual. Failure to do so
may result in the device falling off the
point of installation.
• Packaging materials and mounting
items include plastic bags and small
pieces, which pose a suffocation hazard
to young children.
3
Page 4
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Identify Your Clock
A label containing the part number of your clock is attached to the
clock movement.
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
If your part number begins with SAL-2 or SALG-2, you own a STANDARD ABS clock
If your part number begins with SAL-4 or SALG-4, you own a SLIMLINE ABS or SQUARE clock
If your part number begins with SAL-5 or SALG-5 you own an ALUMINUM clock
If your part number begins with SAL-6 or SALG-6 you own a WOOD clock
Example part numbers:
SAL-2BS-16R-1 (STANDARD ABS clock, 900 MHz)
SAL-4BS-12S-4 (SQUARE clock, 900 MHz)
SALG-4BS-12R-4 (SLIMLINE ABS clock, 2.4 GHz)
SAL-5AS-09R-1 (ALUMINUM clock, 900 MHz)
SALG-6DS-12R-2 (WOOD clock, 2.4 GHz)
Please note that STANDARD ABS clocks may use either the movement shown on the left or the one shown
on the right. Instructions and diagrams have been provided for both variants.
All SlimLine, Square, Aluminum, and Wood clocks use the movement shown on the left.
4
Page 5
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Synchronization System Setup
VERY IMPO RTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to
set up a wireless clock system. If the Master Clock and Repeaters are not properly installed and powered,
the secondary clocks will not synchronize.
Instructions in this section refer to the Transmit/Receive button located on the clock movement. Review
the illustration on the right if you have trouble finding it.
Normal/Economy Mode:
Battery-powered SAL/SALG series clocks can operate in one
of two different modes.
Green
Red
Standard ABS
• Normal mode causes the SAL/SALG to receive and
transmit every two hours. Using this mode, the clock
will have a 5 year battery life, assuming that the clock
has good reception and is using Duracell ProCell
Transmit/Receive
Diagnostic
batteries. Clocks are shipped to customers in this mode.
If the SAL/SALG is being added to an existing
Diagnostic
Transmit/Receive
system, it must be set to normal mode.
• Economy mode causes the SAL/SALG to receive and
transmit every four hours. Using this mode, the clock
will have an 8 year battery life, assuming that the
Green
Red
clock has good reception and is using Duracell
ProCell batteries.
The two modes may be toggled by pressing and
releasing the Diagnostic Button seven times. If Normal
mode is selected, the red LED will shine for one minute and the second hand will go to the 25-second
position. If Economy mode is selected, the green LED will shine for one minute and the second hand will
go to the 40-second position.
Manual Wireless Receiver Settings:
• If you power-cycle the clock (turn it off and turn it on again by removing the power connector or batteries),
the receiver will be powered for ten minutes.
• If you press the Transmit/Receive button twice, the receiver will search for the time signal for ten minutes.
During this time the hour and minute hands will function normally, but the second hand will move to the
twenty second position until the signal is received. If a signal is received, the clock will synchronize the hands
to match the time. If ten minutes have passed and a signal has not been received, the second hand will
return to where it was when the button was pressed, then continue operating.
• If you press the Transmit/Receive button once, the transmitter will transmit the time signal for ten minutes.
However, this will only occur if the clock has received a signal with time data during the past twelve hours.
During this time, the second hand will move to the forty second position. After the ten minutes have passed,
the second hand will return to where it was when the button was pressed, then continue operating.
All Other Clocks
5
Page 6
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Synchronization System Setup (ctd.)
Positioning Transceivers:
The main transceiver should be installed in a central location where there is a minimum number of
walls between the transmitter and clocks. After the main transceiver has been installed, begin installing
the secondary clocks nearest to the main transceiver, followed by whichever clocks are nearest to the
secondary clocks, and so on. Each secondary clock within range of the transceiver should receive data and
begin correcting itself within five minutes of being powered on. Be aware of walls or other obstructions
made of thick concrete or sheet metal, as these may block the signal entirely.
Manually setting a connection between two or more SALs:
1. Identify two clocks. The one which is receiving a signal from the Master Clock is your Transmitter
clock, the one which is not receiving a signal is your Receiver clock.
2. Press the Transmit/Receive button on the Transmitter clock once. The second hand will move to the 40
second position and the clock will stop running. The Transmitter clock is now in transmission mode.
3. Press the Transmit/Receive button on the Receiver clock twice. The second hand will move to the
20 second position until the Receiver clock receives time from the Transmitter clock. You may
perform this step with more than one Receiver clock at the same time.
4. As you move further away from the main transceiver, use one of your now-synchronized Receiver
clocks as your new Transmitter, and continue the process.
System Setup Options
There are three ways to operate a system of Sapling’s SAL/SALG Series Wireless clocks. The user may
choose one or a combination of the options listed below:
1. No clocks are used for transmission. This option should only be taken if the user already has a main
high-powered transceiver and as many repeaters as needed to cover the premises.
2. Battery powered clocks are used as transceivers/repeaters. This option assumes that there is at least
one high powered transceiver in range of enough of the clocks that the clocks can repeat the signal
to all other clocks in the system.
3. Locally powered clocks are used as transceivers/repeaters. This option assumes that there is at least
one high powered transceiver in range of enough of the clocks that the clocks can repeat the signal
to all other clocks in the system.
Before performing any of these options, the user must install and power the master clock and main
transceiver first.
6
Page 7
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Synchronization System Setup (ctd.)
System Option 1
No clocks are being used for transmission. This option should only be taken if the user already has a main
high-powered transceiver and as many repeaters as needed to cover the premises. There are two methods
for setting up a system that uses this option:
Method A: Transceivers or repeaters are synchronized wirelessly to the main transceiver.
1. Place the main transceiver in a central location, like a hallway, where the signal will not be blocked.
2. Pick the location for a secondary transceiver or repeater.
3. Place the secondary transceiver or repeater in a location where it can receive the signal from the
main transceiver.
4. Power up the main and secondary transceivers. Within five minutes, the secondary transceiver
should be showing the time of the main transceiver. If the secondary transceiver is failing to
synchronize, install it closer to the main transceiver.
5. Repeat steps 1-4 with all additional transceivers or repeaters. Note that other transceivers or
repeaters can receive signals from a properly synchronized secondary transceiver/repeater, not just
the main transceiver/repeater.
System Option 2
Battery powered clocks are used as transceivers/repeaters. This option assumes that there is at least one
high powered transceiver in range of enough of the clocks and that the clocks can repeat the signal to all
other clocks in the system.
Either follow the previous instructions listed under “Manually setting a connection between two or more
SALs”, or perform the following steps:
1. Install the batteries in the clocks while close to the main transceiver.
2. After each clock has received a signal from the transceiver and adjusted to the main transceiver
time, place the battery cover back on.
3. Take each clock, while the clock is running, to the planned point of installation and mount the
clock on the wall.
(NOTE: This method does not confirm that the clocks are in range of each other)
System Option 3
Locally powered clocks are used as transceivers/repeaters. This option assumes that there is at least one
high powered transceiver in range of enough of the clocks that the clocks can repeat the signal to all other
clocks in the system.
In this state, locally powered SAL/SALG clocks will enable their receivers at all times, and will transmit time
data once each minute.
7
Page 8
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Wall Mount Installation - Round Standard ABS Clock - Battery Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG round Standard ABS
analog clock
Included in Wiring Kit (A-WK-12-1)
Mounting Bracket
#10x1.5 Self-tapping screw
Wall anchor
#4x5/16 Screw
Quantity
1
1
2
2
1
Picture
Bracket Securing Nut
PLEASE NOTE: A user will also have to provide two D-Cell batteries, a Phillips-head screwdriver, a small slot-head screwdriver, a drill with a 1/4 inch drill bit,
a pencil, a single gang box, any equipment needed to install the gang box, and any additional wiring needed to extend the power or ground cables.
If any of the items listed in the wiring kit are missing, you may contact your dealer and order a
replacement kit.
1
8
Page 9
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round Standard ABS Clock
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Use the mounting bracket, a pencil, and a level to
trace two holes on the wall, then use the 1/4 inch
drill to drill holes at the locations of the two marks.
12
3) Remove the back cover from the battery pack
by pulling the two latches away to either side and
sliding the cover out.
2) Place the two wall anchors into the holes, then
screw the two #10 self-tapping screws through the
bracket and into the wall anchors.
4) First remove the gearbox pin, then insert the
batteries into the clock. If the clock is within range
of a powered transmitter, the hands should begin to
move within a minute.
3
For instructions regarding the original battery pack and movement
design, refer to the section of this manual labeled “Legacy
Movement - Battery Powered”.
1
4
2
9
Page 10
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round Standard ABS Clock
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Place the cover back onto the battery pack. You
should hear a snapping noise as the latches engage.
5
6) Slide the long, protruding part of the mounting
bracket into the clock case keyhole.
6
7) Align the peg on the top portion of the mounting bracket with the hole on top of the clock case. Slide
the peg through the hole. Use the bracket securing nut to secure the peg in place.
7
10
Page 11
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Wall Mount Installation - Round Standard ABS Clock - Locally Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG round Standard ABS
analog clock
Included in Wiring Kit (A-WK-12-1V)
Mounting Bracket
Power/grounding wires
and connector
Bracket securing nut
Quantity
1
1
1
1
Picture
#10x1.5 Self-tapping screw
Wall anchor
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small slot-head screwdriver, a drill with a 1/4 inch drill bit, a pencil, a single
gang box, any equipment needed to install the gang box, and any additional wiring needed to extend the power or ground cables.
If any of the items listed in the wiring kit are missing, you may contact your dealer and order a
replacement kit.
2
1
11
Page 12
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round Standard ABS Clock
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Install the single gang box in the wall. Leave at
least 17 inches between the bottom of the gang
box and ceiling. Confirm that the bottom of the
gang box is level with the floor.
12
17” Minimum
43.2 cm
2) Run power wiring to the gang box.
For 24V power use the ORANGE and YELLOW wires
For 110V power use the BLACK and WHITE wires
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 115
volt model, 207-253 volts AC in the 230 volt
model, or 21.5-26.5 volts AC in the 24
volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.
3) Attach the communication, power,
and grounding wires from your kit to the
communication and power wires in the gang box.
See the Wiring Guide included later in this manual
for additional details.
3
4) Position the top of the mounting bracket so that it
is between 1 and 9 inches above the top of the gang
box. Use the mounting bracket, a pencil, and a level
to trace two holes on the wall, then use the 1/4 inch
drill to drill holes at the locations of the two marks.
4
12
Page 13
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round Standard ABS Clock
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Place the two wall anchors into the holes, then
screw the two #10 self-tapping screws through the
bracket and into the wall anchors.
5
7) Slide the long, protruding part of the mounting
bracket into the clock case keyhole.
6) First remove the gearbox pin, then attach the
power connector to the port on the movement.
1
1
6
2
8) Align the peg on the top portion of the
mounting bracket with the hole on top of the
clock case. Slide the peg through the hole. Use the
bracket securing nut to secure the peg in place.
2
7
8
13
Page 14
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Wall Mount Installation - Round SlimLine Clock - Battery Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG round SlimLine
analog clock
Included in Wiring Kit (A-SLM-MK-S-1)
Mounting Piece
#6-19x7/16 screw
Strain Relief
Included in Gang Box Kit (A-GB-MK-1)
#6 -32x1 screw
Quantity
1
1
2 (not used)
1 (not used)
2 (not used)
Picture
#6-19x3 /8 screw
Included in Wiring Kit (A-WK-MTG-1)
#10x1.5 Self-tapping screw
Wall anchor
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small flat-blade screwdriver, a single gang box, any equipment needed to install
the gang box, and any additional wiring needed to extend the power or ground cables. You may also need a 1/4 inch drill if you decide not to attach the
clock directly to the gang box.
If any of the items listed in the wiring kit are missing, you may contact your dealer and order a
replacement kit.
1 (not used)
2
2
14
Page 15
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round SlimLine Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Place the mounting piece on the wall. Leave at
least 4 inches between the top of the gang box and
ceiling. Confirm that the bottom of the mounting
piece is level with the floor.
4” Minimum
1
2) Use a pencil to mark the positions of the top two
holes, then use the 1/4 inch drill bit to drill holes at
the locations of the two marks.
2
3) Insert the wall anchors into the two holes, then
place the two self tapping screws through the
mounting piece and into the wall anchors.
3
4) Remove the back cover from the battery pack
by pulling the two latches away to either side and
sliding the cover out.
4
15
Page 16
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round SlimLine Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) First remove the gearbox pin, then insert the
batteries into the clock. If the clock is within range
of a powered transmitter, the hands should begin to
move within a minute.
1
5
2
7) Attach the clock to the mounting piece by sliding
the clock back onto it. You should hear a snapping
noise as the latch engages.
6) Place the cover back onto the battery pack. You
should hear a snapping noise as the latches engage.
6
8) If you need to take the clock off the wall after
the installation has been completed, use a flat-blade
screwdriver or eyeglasses screwdriver to lower the
mounting piece latch, then slide the clock off the
mounting piece.
7
8
16
Page 17
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Wall Mount Installation - Round SlimLine Clock - Locally Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG round SlimLine
analog clock
Included in Wiring Kit (A-SLM-MK-S-1)
Mounting Piece
#6-19x7/16 screw
Strain Relief
Included in Gang Box Kit (A-GB-MK-1)
#6 -32x1 screw
#6-19x3 /8 screw
Included in Wiring Kit (A-WK-MTG-1V)
Quantity
1
1
2
1
2
1 (not used)
Picture
Power/grounding wires
and connector
#8x1.5 Self-tapping screw
Wall anchor
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small flat-blade screwdriver, a single gang box, any equipment needed to install
the gang box, and any additional wiring needed to extend the power or ground cables. You may also need a 1/4 inch drill if you decide not to attach the
clock directly to the gang box.
If any of the items listed in the wiring kit are missing, you may contact your dealer and order a
replacement kit.
1
2
2
17
Page 18
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round SlimLine Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) If you are installing a new gang box in the wall,
leave at least 4 inches between the top of the gang
box and ceiling. Confirm that the bottom of the
gang box is level with the floor.
If you are using an existing gang box, the top of the
gang box must be a minimum of four inches away
from the ceiling.
Ceiling
1
Minimum
2) Run power wiring to the gang box.
For 24V power use the ORANGE and YELLOW wires
For 110V power use the BLACK and WHITE wires
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 115
volt model, 207-253 volts AC in the 230 volt
model, or 21.5-26.5 volts AC in the 24
volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.
2
3) Attach the power wires from your kit to the
power wires in the gang box.
• Attach the Hot wire to the connector’s black wire.
• Attach the Common wire to the connector’s
white wire.
• Attach the Ground wire to the connector’s
green wire.
34
4) If you do not wish to attach the mounting piece
to the gang box, proceed to step 5A. Otherwise, go
to step 6.
18
Page 19
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round SlimLine Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5A) If you do not wish to attach the mounting piece
to a gang box, place the mounting piece on the
wall. Leave at least 4 inches between the middle of
the mounting piece and ceiling. Confirm that the
bottom of the mounting piece is level with the floor.
5A
4” Minimum
5B) Use a pencil to mark the positions of the top
two holes, then use the 1/4 inch drill bit to drill
holes at the locations of the two marks.
5B
5C) Insert the wall anchors into the two holes,
then place the two self tapping screws through the
mounting piece and into the wall anchors. Skip step
6 and go directly to step 7.
5C
6) Place the mounting piece on the wall above the
gang box so that the bottom centered hole on the
piece overlaps the top hole on the gang box. Insert
a #6-32x1 screw through the bottom centered hole
and into the top hole of the gang box.
6
19
Page 20
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round SlimLine Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
7) First remove the gearbox pin, then attach the
power connector to the port on the movement.
1
7
2
9) Attach the clock to the mounting piece by sliding
the clock back onto it. You should hear a snapping
noise as the latch engages.
8) Lay any excess wiring across the strain relief base,
then attach the strain relief to the clock with the
two #6-19x7/16 screws. The strain relief should be
tight enough to prevent the wire from sliding.
8
10) If you need to take the clock off the wall after
the installation has been completed, use a flat-blade
screwdriver or eyeglasses screwdriver to press down
on and release the mounting piece latch, then slide
the clock off the mounting piece.
9
10
20
Page 21
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Wall Mount Installation - Round Aluminum or Wood Clock - Battery Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
Quantity
SAL or SALG round SlimLine
analog clock with aluminum/
wood rim
Included in Mounting Kit (A-SLM-MK-AW-1)
Mounting Piece
Release lever
#6-19x7/16 screw
Strain Relief
2 (not used)
1 (not used)
Included in Gang Box Kit (A-GB-MK-1)
#6 -32x1 screw
2 (not used)
Picture
1
1
1
#6-19x3 /8 screw
Included in Wiring Kit (A-WK-12-1V)
#8x1.5 Self-tapping screw
Wall anchor
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small flat-blade screwdriver, a drill with a 1/4 inch drill bit, a pencil, a single
gang box, any equipment needed to install the gang box, and any additional wiring needed to extend the power or ground cables.
If any of the items listed in the wiring kit are missing, you may contact your dealer and order a
replacement kit.
1 (not used)
2
2
21
Page 22
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round Aluminum or Wood Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Place the flat side of the mounting piece on the
wall. Leave at least 4 inches between the top of
the mounting piece and ceiling. Confirm that the
bottom of the mounting piece is level with the floor.
4” Minimum
1
2) Use a pencil to mark the positions of the two
holes, then use the 1/4 inch drill bit to drill holes at
the locations of the two marks.
2
3) Insert the release lever into the hole atop the
mounting piece latch.
3
4) Insert the wall anchors into the two holes, then
place the two self tapping screws through the
mounting piece and into the wall anchors.
4
22
Page 23
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round Aluminum or Wood Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Remove the back cover from the battery pack
by pulling the two latches away to either side and
sliding the cover out.
5
6) First remove the gearbox pin, then insert the
batteries into the clock. If the clock is within range
of a powered transmitter, the hands should begin to
move within a minute.
1
6
2
7) Place the cover back onto the battery pack. You
should hear a snapping noise as the latches engage.
7
8) Attach the clock to the mounting piece by sliding
the clock back onto it. You should hear a snapping
noise as the latch engages.
8
23
Page 24
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round Aluminum or Wood Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
9) Use the pencil to mark the location of the hole
at the top of the release lever, and remove the
clock again (see step 11). Remove the mounting
piece and make a hole at the location you just
marked with the 1/8 inch drill bit.
9
10) Reattach the mounting piece and clock. Place
one of the self-tapping screws through the hole in
the top of the release lever and into the wall.
10
11) If you need to take the clock off the wall after
the installation has been completed, remove the
screw from the release lever, press the release lever
down, then slide the clock off the mounting piece.
11
12) If you need to take the clock off the wall after
the installation has been completed AND you
accidentally broke off the release lever or forgot
to attach it during installation, take a thin flathead
screwdriver, thin ruler, or eyeglass screwdriver and
insert the end between the clock and the wall. Press
down on the latch until you are able to slide the
clock off the mounting piece.
12
24
Page 25
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Wall Mount Installation - Round Aluminum or Wood Clock - Locally Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
Quantity
SAM round SlimLine analog clock
with aluminum/wood rim
Included in Mounting Kit (A-SLM-MK-AW)
Mounting Piece
Release lever
#6-19x7/16 screw
Strain Relief
Included in Wiring Kit (A-WK-MTG-1V)
Power/grounding wires
and connector
Picture
1
1
1
2
1
1
#8x1.5 Self-tapping screw
Wall anchor
Included in Gang Box Kit (A-GB-MK-1)
#6 -32x1 screw
#6-19x3 /8 screw
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small flat-blade screwdriver, a drill with a 1/4 inch drill bit, a pencil, a single
gang box, any equipment needed to install the gang box, and any additional wiring needed to extend the power or ground cables.
If any of the items listed in the wiring kit are missing, you may contact your dealer and order a replacement kit.
2
2
2
1 (not used)
25
Page 26
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round Aluminum or Wood Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) If you are installing a new gang box in the wall,
leave at least 4 inches between the top of the gang
box and ceiling. Confirm that the bottom of the
gang box is level with the floor.
If you are using an existing gang box, the top of the
gang box must be a minimum of four inches away
from the ceiling.
Ceiling
1
Minimum
2) Run power wiring to the gang box.
For 24V power use the ORANGE and YELLOW wires
For 110V power use the BLACK and WHITE wires
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 115
volt model, 207-253 volts AC in the 230 volt
model, or 21.5-26.5 volts AC in the 24
volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.
2
3) Attach the power wires from your kit to the
power wires in the gang box.
• Attach the Hot wire to the connector’s black wire.
• Attach the Common wire to the connector’s
white wire.
• Attach the Ground wire to the connector’s
green wire.
3
4) Insert the release lever into the hole atop the
mounting piece latch.
4
26
Page 27
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round Aluminum or Wood Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) If you do not wish to attach the mounting piece
to the gang box, proceed to step 6A. Otherwise, go
to step 7.
5
6A) If you do not wish to attach the mounting piece
to a gang box, place the mounting piece on the
wall. Leave at least 4 inches between the middle of
the mounting piece and ceiling. Confirm that the
bottom of the mounting piece is level with the floor.
4” Minimum
6A
6B) Use a pencil to mark the positions of the top
two holes, then use the 1/4 inch drill bit to drill
holes at the locations of the two marks.
6B
6C) Insert the wall anchors into the two holes,
then place the two self tapping screws through the
mounting piece and into the wall anchors. Skip step
7 and go directly to step 8.
6C
27
Page 28
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round Aluminum or Wood Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
7) Place the mounting piece on the wall above the
gang box so that the bottom centered hole on the
piece overlaps the top hole on the gang box. Insert
a #6-32x1 screw through the bottom centered hole
and into the top hole of the gang box.
7
8) Temporarily attach the clock to the mounting
piece (see step 11), use the pencil to mark the
location of the hole at the top of the release lever,
and remove the clock again (see step 13). Remove
the mounting piece and make a hole at the location
you just marked with the 1/8 inch drill bit. When
finished, reattach the mounting piece.
8
9) First remove the gearbox pin, then attach the
power connector to the port on the movement.
1
9
2
10) Lay any excess wiring across the strain relief
base, then attach the strain relief to the clock with
the two #6-19x7/16 screws. The strain relief should
be tight enough to prevent the wire from sliding.
10
28
Page 29
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Round Aluminum or Wood Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
11) Attach the clock to the mounting piece by
sliding the clock back onto it. You should hear a
snapping noise as the latch engages.
11
12) Place one of the self-tapping screws through
the hole in the top of the release lever.
12
13) If you need to take the clock off the wall after
the installation has been completed, remove the
screw from the release lever, press the release lever
down, then slide the clock off the mounting piece.
13
14) If you need to take the clock off the wall after
the installation has been completed AND you
accidentally broke off the release lever or forgot
to attach it during installation, take a thin flathead
screwdriver, thin ruler, or eyeglass screwdriver and
insert the end between the clock and the wall. Press
down on the latch until you are able to slide the
clock off the mounting piece.
14
29
Page 30
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Wall Mount Installation - Square Clock - Battery Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG square analog clock
Mounting Piece (already attached to
clock housing)
Included in Wiring Kit (A-WK-MTG-1)
#8x1.5 Self-tapping screw
Wall anchor
Included in Gang Box Kit (A-GB-MK-1)
Quantity
1
1
2
2
Picture
#6 -32x1 screw
#6-19x3 /8 screw
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small flat-blade screwdriver, a single gang box, any equipment needed to install
the gang box, and any additional wiring needed to extend the power or ground cables.
If any of the items listed in the wiring kit are missing, you may contact your dealer and order a
replacement kit.
2 (not used)
1 (not used)
30
Page 31
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Square Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Detach the housing from the back of the clock.
Do this by inserting a flat-blade screwdriver about
1/8 inch into each of the slot holes until the housing
detaches from the clocks. You may hear a snapping
noise as the latches disengage.
1
2) Release the mounting piece from the back of
the housing by sliding it towards the center of the
housing, then pulling it back and away from
the housing.
1
Mounting
piece
Housing
2
2
3) Place the mounting piece on the wall. Leave at
least 4 inches between the top of the mounting
piece and ceiling. Take care to make sure that the
bottom of the mounting piece is level with the floor.
3
4” Minimum
4) Use a pencil to mark the two holes shown in the
diagram below. Then use the 1/4 inch drill bit to drill
holes at the marked positions.
4
31
Page 32
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Square Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Insert the wall anchors into the holes, then place
the self-tapping screws through the mounting piece
and into the wall anchors.
5
6) Remove the back cover from the battery pack
by pulling the two latches away to either side and
sliding the cover out.
6
7) First remove the gearbox pin, then insert the
batteries into the clock. If the clock is within range
of a powered transmitter, the hands should begin to
move within a minute.
1
7
8) Place the cover back onto the battery pack.
You should hear a snapping noise as the
latches engage.
8
2
32
Page 33
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Square Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
9) Slide the clock housing onto the mounting piece.
If the housing does not slide on properly, tighten the
screws that attach the mounting piece to the wall.
9
10) If you wish to prevent the clock from sliding
off the mounting piece, use the small silver screw
on the hole below the lower of the two #6-32x1
screws. Once the small screw is in place, test it by
attempting to slide the housing up. The housing
should not move.
10
11) Slide the clock back into the housing. You
should hear a snapping noise as the
latches reengage.
11
12) If you feel the need to take the clock off the
wall after the installation has been completed, use
a flat-blade screwdriver to detach the housing from
the back of the clock, then use a Phillip’s-head
screwdriver to detach the mounting piece from the
housing and gang box.
12
33
Page 34
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Wall Mount Installation - Square Clock - Locally Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG square analog clock
Mounting Piece (already attached to
clock housing)
Included in Wiring Kit (A-WK-12-1V)
Power/grounding wires
And connector
#8x1.5 Self-tapping screw
Quantity
1
1
1
(not used)
2
Picture
Wall anchor
Included in Gang Box Kit (A-GB-MK-1)
#6 -32x1 screw
#6-19x3 /8 screw
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small flat-blade screwdriver, a single gang box, any equipment needed to install
the gang box, and any additional wiring needed to extend the power or ground cables.
If any of the items listed in the wiring kit are missing, you may contact your dealer and order a
replacement kit.
2 (not used)
2
1
34
Page 35
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Square Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) If you are installing a new gang box in the wall,
leave at least 4 inches between the top of the gang
box and ceiling. Confirm that the bottom of the
gang box is level with the floor.
If you are using an existing gang box, the top of the
gang box must be a minimum of four inches away
from the ceiling.
Ceiling
1
Minimum
2) Run power wiring to the gang box.
For 24V power use the ORANGE and YELLOW wires
For 110V power use the BLACK and WHITE wires
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 115
volt model, 207-253 volts AC in the 230 volt
model, or 21.5-26.5 volts AC in the 24
volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.
2
3) Detach the housing from the back of the clock.
Do this by inserting a flat-blade screwdriver about
1/8 inch into each of the slot holes until the housing
detaches. You may hear a snapping noise as the
latches disengage.
3
4) Release the mounting piece from the back of
the housing by sliding it towards the center of the
housing, then pulling it back and away from
the housing.
1
4
Mounting
piece
2
Housing
35
Page 36
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Square Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Thread the power wires from your kit through
the hole at the top of the housing followed by the
mounting piece, then attach them to the wires in
the gang box.
• Attach the Hot wire to the connector’s black wire.
• Attach the Common wire to the connector’s
white wire.
• Attach the Ground wire to the connector’s
green wire.
5
6) Attach the mounting piece to the gang box using
both of the #6-32x1 screws and a
Phillips-head screwdriver.
6
7) Slide the clock housing onto the mounting piece.
If the housing does not slide on properly, tighten
the screws that attach the mounting piece to the
gang box.
7
8) If you wish to prevent the clock from sliding off
the mounting piece, use the small, silver 6-19x3/8
screw on the bottom centered hole. Once the screw
is in place, test it by attempting to slide the housing
up. The housing should not move.
8
36
Page 37
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Wall Mount Installation - Square Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
9) First remove the gearbox pin, then attach the
power connector to the port on the movement.
1
9
2
11) Slide the clock back into the housing. You
should hear a snapping noise as the
latches reengage.
10) Loosen the strain relief by unscrewing the two
screws. Slip any excess wiring through it, then
tighten the strain relief by reinserting and tightening
the screws.
10
12) If you feel the need to take the clock off the
wall after the installation has been completed, use
a flat-blade screwdriver to detach the housing from
the back of the clock, then use a Phillip’s-head
screwdriver to detach the mounting piece from the
housing and gang box.
11
12
37
Page 38
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Round Standard ABS Clock - Battery Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG round Standard ABS
analog clock
Included in Wiring Kit (A-WK-12-1)
Mounting Bracket
#10x1.5 Self-tapping screw
Wall anchor
#4x5/16 Screw
Quantity
1
1 (not used)
2 (not used)
2 (not used)
1 (not used)
Picture
Bracket Securing Nut
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
1 (not used)
Continued on next page
38
Page 39
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Round Standard ABS Clock - Battery Powered
Included in Adapter Kit (A-MOUNT-12S-2) or (A-MOUNT-16S-2)
Description
Round Clock Adapter
Included in Pole Kit (SAB-4BD-00S-0)
Dual-mount pole, including
mounting plate
#10-32x3/8 green screw
#8-32x7/16 screw
Quantity
1
1
1
8
Picture
M3.5-1.0x10 screw (black)
Internal-tooth washer
#6-32x1 screw
Adapter tab screws
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small slot-head screwdriver, a drill with a 1/4 inch drill bit, a pencil, a double
gang box, four wall anchors that can support 50 lbs and a maximum screw size of 10x1.5”, four #8 screws for the wall anchors, four #6-32x1 screws for
attaching the mounting plate to the gang box, any equipment needed to install the gang box, and any additional wiring needed to extend the power or
ground cables.
4
8
4
4
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
39
Page 40
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round Standard ABS Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Detach the mounting plate from the mounting
pole by unscrewing the two screws. Set the screws
and pole aside for later.
1
2) Place the mounting plate on the wall or ceiling.
If you are installing a gang box in the wall, leave
at least eleven inches between the top of the
gang box and the ceiling. If you are installing the
gang box in the ceiling, leave at least eleven inches
between the gang box and the wall.
2
3) Confirm that the mounting plate is level with the
floor. With the mounting plate as a guide, use the
pencil to trace the locations of the four larger holes
at the outer corners of the plate.
3
4) Remove the mounting plate and drill the four
holes that were just traced. Insert the four wall
anchors into the holes.
4
40
Page 41
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round Standard ABS Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Insert the #8 screws through the mounting plate
and into the anchors.
5
5B) If you are installing the clock atop an gang box,
use the green screw to attach a grounding wire to
the mounting plate.
5B
6) Use a screwdriver to remove one of the end caps.
The end cap and screw that was used to secure it
will not be needed again during this installation.
7) Insert the four #8-32x7/16 screws through the
internal-tooth washers, then through the adapter,
and finally into the pole. Use a screwdriver to
tighten the screws so that the adapter does
not move.
76
41
Page 42
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round Standard ABS Clock - Battery Powered
8) Attach the base of the pole to the mounting plate so that the lip is on the top of the base, and the
holes for the screws are on the bottom of the base. Hang the base on the mounting plate, attach the
wires from the bottom of the pole to the wires in the gang box, then screw the other side of the base
onto the mounting plate using the two black screws you set aside before.
2
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
8
1
1
2
9) Remove the back cover from the battery pack
by pulling the two latches away to either side and
sliding the cover out.
WALL
9
CEILING
10) First remove the gearbox pin, then insert the
batteries into the clock. If the clock is within range
of a powered transmitter, the hands should begin to
move within a minute.
1
10
2
For instructions regarding the original battery pack and movement
design, refer to the section of this manual labeled “Legacy
Movement - Battery Powered”.
42
Page 43
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round Standard ABS Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
11) Place the cover back onto the battery pack. You
should hear a snapping noise as the latches engage.
11
12) Slide each clock onto the adapter in the rotation
that you wish it to be viewed. You should hear a
snapping noise as the four clips on the adapter
secure the clock in place. Insert the adapter tab
screws to complete the installation.
12
13) If you feel the need to detach the clock from the housing after the installation has been completed,
remove the outer adapter screws, press down on the latches, and gently pull on the rim of the clock until
the clock detaches.
13
43
Page 44
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Round Standard ABS Clock - Locally Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG round Standard ABS
analog clock
Included in Wiring Kit (A-WK-12-1V)
Mounting Bracket
Power/grounding wires
and connector
Bracket securing nut
Quantity
1
1 (not used)
1 (not used)
1 (not used)
Picture
#10x1.5 Self-tapping screw
Wall anchor
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
2 (not used)
2 (not used)
Continued on next page
44
Page 45
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Round Standard ABS Clock - Locally Powered
Included in Adapter Kit (A-MOUNT-12S-2) or (A-MOUNT-16S-2)
Description
Round Clock Adapter
Included in Pole Kit (SAB-4BD-00S-0)
Dual-mount pole, including
mounting plate
#10-32x3/8 green screw
#8-32x7/16 screw
Quantity
1
1
1
8
Picture
M3.5-1.0x10 screw (black)
Internal-tooth washer
#6 -32x1 screw
Adapter tab screws
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small slot-head screwdriver, a drill with a 1/4 inch drill bit, a pencil, a double
gang box, four wall anchors that can support 50 lbs and a maximum screw size of 10x1.5”, four #8 screws for the wall anchors, four #6-32x1 screws for
attaching the mounting plate to the gang box, any equipment needed to install the gang box, and any additional wiring needed to extend the power or
ground cables.
4
8
4
4
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
45
Page 46
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round Standard ABS Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Install the double gang box in the wall or ceiling.
If you are installing the gang box in the wall, leave
at least eleven inches between the top of the
gang box and the ceiling. If you are installing the
gang box in the ceiling, leave at least eleven inches
between the gang box and the wall.
Ceiling
1
11” Minimum
2) Run power wiring to the gang box.
For 24V power use the ORANGE and YELLOW wires
For 110V power use the BLACK and WHITE wires
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 115
volt model, 207-253 volts AC in the 230 volt
model, or 21.5-26.5 volts AC in the 24
volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.
2
3) Detach the mounting plate from the mounting
pole by unscrewing the two screws. Set the screws
and pole aside for later.
3
4) Attach the mounting plate to the gang box using
only two of the four long silver #6-32x1 screws.
With the mounting plate as a guide, use the pencil
to trace the locations of the four larger holes at the
outer corners.
4
46
Page 47
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round Standard ABS Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Remove the mounting plate and drill the four
holes that were just traced. Insert the four wall
anchors into the holes.
5
7) Thread any wiring through the mounting plate,
and attach a grounding wire to the mounting plate
using one of the larger centered holes and the
#10-32x3/8 screw.
6) Reattach the mounting plate, this time using all
four long, silver #8 screws, then insert the four
#6-32x1 screws through the mounting plate and
into the anchors.
6
8) Use a screwdriver to remove one of the end caps.
The end cap and screw that was used to secure it
will not be needed again during this installation.
7
8
47
Page 48
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round Standard ABS Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
9) Insert the four #8-32x7/16 screws through the
internal-tooth washers, then through the adapter,
and finally into the pole. Use a screwdriver to
tighten the screws so that the adapter does
not move.
9
10) Thread at least fifteen inches (38.1cm) of wiring
from the gang box through the bottom of the pole
until each wire exits through the hole in
the adapter.
10
Adapter hole
11) Attach the base of the pole to the mounting plate so that the lip is on the top of the base, and the
holes for the screws are on the bottom of the base. Hang the base on the mounting plate, attach the wires
from the bottom of the pole to the wires in the gang box, then screw the other side of the base onto the
mounting plate using the two black screws you set aside before.
2
11
1
1
2
WALL
CEILING
48
Page 49
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round Standard ABS Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
12) Attach the power wires from your kit to the
wires you threaded through the pole.
• Attach the Hot wire to the connector’s black wire.
• Attach the Common wire to the connector’s
white wire.
• Attach the Ground wire to the connector’s
green wire.
Consult the diagram on the left for additional help.
Gang
12
Box
Common
Power
Ground
Green
Black
White
CLOCK 1
Black
Green
White
13) First remove the gearbox pin, then attach
the power connector to the port on the movement.
1
1
13
2
2
14) Slide the clock onto the adapter in the rotation
that you wish it to be viewed. You should hear a
snapping noise as the four clips on the adapter
secure the clock in place. Insert the adapter tab
screws to complete the installation.
14
15) If you feel the need to detach the clock from the
housing after the installation has been completed,
remove the outer adapter screws, press down on
the latches, and gently pull on the rim of the clock
until the clock detaches.
15
49
Page 50
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Round SlimLine/Aluminum Clock - Battery Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG round SlimLine
Quantity
1
analog clock
Included in Pole Kit (SAB-4BD-00S-0 or SAB-1BD-00S-0)
Dual-mount pole, including
mounting plate.
#10-32x3/8 green screw
#8-32x7/16 screw
M3.5-1.0x10 screw (black)
1
1
8
4
Picture
Internal-tooth washer
#6 -32x1 screw
Included in Adapter Kit (A-SLM-Mount-12S-0)
Round Clock Adapter1
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
8
4
Continued on next page
50
Page 51
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Round SlimLine/Aluminum Clock - Battery Powered
Included in Mounting Kit (A-SLM-MK-S-1) or (A-SLM-MK-AW)
Description
Mounting Piece
Release lever
#6-19x7/16 screw
Strain relief
Included in Wiring Kit (A-WK-MTG-1)
#10x1.5 Self-tapping screw
Quantity
1 (not used)
0 or 1 (not used)
2
1
2
Picture
Wall anchor
Included in Gang Box Kit (A-GB-MK-1)
#6 -32x1 screw
#6-19x3 /8 screw
PLEASE NOTE: A user must also provide a Phillips-head screwdriver, a small flat-blade screwdriver, a drill with a 1/4 inch drill bit, a pencil, a double gang
box, four wall anchors (must support 50 lbs, #8 screw size, 1.5”(3.8cm) screw length), four #8 screws for the wall anchors, two additional #6-32x1 screws
for attaching the mounting plate to the gang box, any equipment needed to install the gang box, and any additional wiring needed to extend the power or
ground cables.
If any of the items listed in the wiring kit are missing, you may contact your dealer and order a
replacement kit.
SlimLine and Aluminum Clocks use the same installation procedures for flag mount housings.
2
2 (not used)
1 (not used)
51
Page 52
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round SlimLine/Aluminum Clock - Battery powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Detach the mounting plate from the mounting
pole by unscrewing the two screws. Set the screws
and pole aside for later.
1
2) Place the mounting plate on the wall or ceiling.
If you are installing a gang box in the wall, leave
at least eleven inches between the top of the
gang box and the ceiling. If you are installing the
gang box in the ceiling, leave at least eleven inches
between the gang box and the wall.
2
11”
Minimum
3) Confirm that the mounting plate is level with the
floor. With the mounting plate as a guide, use the
pencil to trace the locations of the four larger holes
at the outer corners of the plate.
3
4) Remove the mounting plate and drill the four
holes that were just traced. Insert the four wall
anchors into the holes.
4
52
Page 53
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round SlimLine/Aluminum Clock - Battery powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Insert the #8 screws through the mounting plate
and into the anchors.
5
5B) If you are installing the clock atop an gang box,
use the green screw to attach a grounding wire to
the mounting plate.
5B
6) Use a screwdriver to remove one of the end caps.
The end cap and screw that was used to secure it
will not be needed again during this installation.
6
7) Insert the four #8-32x7/16 screws through the
internal-tooth washers, then through the adapter,
and finally into the pole. Use a screwdriver to
tighten the screws so that the adapter does
not move.
7
53
Page 54
The Sapling Company, Inc.
1
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round SlimLine/Aluminum Clock - Battery Powered
8) Thread at least fifteen inches (38.1cm) of wiring from the gang box through the bottom of the pole until
each wire exits through the hole in the adapter.
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
8
Adapter hole
9) Attach the base of the pole to the mounting plate so that the lip is on the top of the base, and the
holes for the screws are on the bottom of the base. Hang the base on the mounting plate, attach the
wires from the bottom of the pole to the wires in the gang box, then screw the other side of the base
onto the mounting plate using the two black screws you set aside before.
2
9
1
1
2
2
WALL
1
CEILING
54
Page 55
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round SlimLine/Aluminum Clock - Battery Powered
10) Remove the back covers from the battery pack by pulling the two latches away to either side and
sliding the cover out.
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
10
11) First remove the gearbox pin, then insert the
batteries into the clock. If the clock is within range
of a powered transmitter, the hands should begin to
move within a minute.
1
11
2
12) Place the cover back onto the battery pack. You
should hear a snapping noise as the latches engage.
12
55
Page 56
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round SlimLine/Aluminum Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
13) Slide the clock onto the adapter in the rotation
that you wish it to be viewed. You should hear a
snapping noise as the four clips on the adapter
secure the clock in place.
WALL
1314
CEILING
14) If you feel the need to detach the clock from the
housing after the installation has been completed,
use a flat-blade screwdriver on the four slots
around the outside of the housing. You may hear a
snapping noise as the internal latches disengage.
56
Page 57
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG round SlimLine
Quantity
1
analog clock
Included in Pole Kit (SAB-4BD-00S-0 or SAB-1BD-00S-0)
Dual-mount pole, including
mounting plate.
#10-32x3/8 green screw
#8-32x7/16 screw
M3.5-1.0x10 screw (black)
Internal-tooth washer
1
1
8
4
8
Picture
#6-32x1 screw
Included in Adapter Kit (A-SLM-Mount-12S-0)
Round Clock Adapter1
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
4
Continued on next page
57
Page 58
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
Description
Quantity
Included in Gang Box Kit (A-GB-MK-1)
#6 -32x1 screw
#6-19x3 /8 screw
2 (not used)
1 (not used)
Included in Mounting Kit (A-SLM-MK-S-1) or (A-SLM-MK-AW)
Mounting Piece
Release lever
#6-19x7/16 screw
Strain relief
1
(not used)
0 or 1 (not used)
2
1
Picture
Included in Wiring Kit (A-WK-12-1V)
Power/grounding wires
And connector
#8x1.5 Self-tapping screw
Wall anchor
PLEASE NOTE: A user must also provide a Phillips-head screwdriver, a small flat-blade screwdriver, a drill with a 1/4 inch drill bit, a pencil, a double gang
box, four wall anchors (must support 50 lbs, #8 screw size, 1.5”(3.8cm) screw length), four #8 screws for the wall anchors, two additional #6-32x1 screws
for attaching the mounting plate to the gang box, any equipment needed to install the gang box, and any additional wiring needed to extend the power or
ground cables.
If any of the items listed in the wiring kit are missing, you may contact your dealer and order a
replacement kit.
SlimLine and Aluminum Clocks use the same installation procedures for flag mount housings.
1
(not used)
2
2 (not used)
58
Page 59
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Install the double gang box in the wall or ceiling.
If you are installing the gang box in the wall, leave
at least eleven inches between the top of the
gang box and the ceiling. If you are installing the
gang box in the ceiling, leave at least eleven inches
between the gang box and the wall. The box should
be installed level and plumb with the wall
and ceiling.
Ceiling
1
11” Minimum
2) Run power wiring to the gang box.
For 24V power use the ORANGE and YELLOW wires
For 110V power use the BLACK and WHITE wires
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 115
volt model, 207-253 volts AC in the 230 volt
model, or 21.5-26.5 volts AC in the 24
volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.
2
3) Detach the mounting plate from the mounting
pole by unscrewing the two screws. Set the screws
and pole aside for later.
3
4) Attach the mounting plate to the gang box using
only two of the four long, silver #6-32x1 screws.
With the mounting plate as a guide, use the pencil
to trace the locations of the four larger holes at the
outer corners.
4
59
Page 60
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Remove the mounting plate and drill the four
holes that were just traced. Insert the four wall
anchors into the holes.
5
7) Thread any wiring through the mounting plate,
and attach a grounding wire to the mounting plate
using one of the larger centered holes and the
#10-32x3/8 screw.
6) Reattach the mounting plate, this time using all
four long, silver #6-32x1 screws, then insert the
four #8 screws through the mounting plate and into
the anchors.
6
8) Use a screwdriver to remove one of the end caps.
The end cap and screw that was used to secure it
will not be needed again during this installation.
7
8
60
Page 61
The Sapling Company, Inc.
1
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
9) Insert the four #8-32x7/16 screws through the
internal-tooth washers, then through the adapter,
and finally into the pole. Use a screwdriver to
tighten the screws so that the adapter does
not move.
9
10) Thread at least fifteen inches (38.1cm) of wiring
from the gang box through the bottom of the pole
until each wire exits through the hole in
the adapter.
10
Adapter hole
11) Attach the base of the pole to the mounting plate so that the lip is on the top of the base, and the
holes for the screws are on the bottom of the base. Hang the base on the mounting plate, attach the
wires from the bottom of the pole to the wires in the gang box, then screw the other side of the base
onto the mounting plate using the two black screws you set aside before.
2
11
1
1
2
2
1
WALL
CEILING
61
Page 62
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
12) Attach the power wires from your kit to the
wires you threaded through the pole.
• Attach the Hot wire to the connector’s black wire.
• Attach the Common wire to the connector’s
white wire.
• Attach the Ground wire to the connector’s
green wire.
Consult the diagram on the left for additional help.
12
Gang
Box
Common
Power
Ground
Green
Black
White
CLOCK 1
Black
Green
White
13) First remove the gearbox pin, then attach a
power connector to the port on the side of
the movement.
1
13
2
14) Lay any excess wiring across the strain relief base, then attach the strain relief to the clock with the two
#6-19x7/16 screws. The strain relief should be tight enough to prevent the wire from sliding.
14
62
Page 63
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
15) Slide the clock onto the adapter in the rotation
that you wish it to be viewed. You should hear a
snapping noise as the four clips on the adapter
secure the clock in place.
WALL
1516
CEILING
16) If you feel the need to detach the clock from the
housing after the installation has been completed,
use a flat-blade screwdriver on the four slots
around the outside of the housing. You may hear a
snapping noise as the internal latches disengage.
63
Page 64
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Square Clock - Battery Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG square analog clock
Quantity
1
Included in Pole Kit (SAB-4GD-00S-0 or SAB-1GD-00S-0 )
Dual-mount pole, including
mounting plate.
#8-32x7/16 screw
M3.5-1.0x10 screw (black)
Internal-tooth washer
1
8 (4 used)
4 (not used)
8 (4 used)
Picture
#10-32x3/8 green screw
#6 -32x1 screw
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
1
4
Continued on next page
64
Page 65
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Square Clock - Battery Powered
Included in Wiring Kit (A-WK-MTG-1)
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Description
#10x1.5 Self-tapping screw
Wall anchor
Quantity
2
2
Picture
Included in Gang Box Kit (A-GB-MK-1)
#6 -32x1 screw
#6-19x3 /8 screw
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small flat-blade screwdriver, a drill with a 1/4 inch drill bit, a pencil, a double
gang box, four wall anchors (must support 50 lbs, #8 screw size, 1.5”(3.8cm) screw length), four #8 screws for the wall anchors, two additional
#6-32x1 screws for attaching the mounting plate to the gang box, any equipment needed to install the gang box, and any additional wiring needed to
extend the power or ground cables.
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
2 (not used)
1 (not used)
65
Page 66
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Square Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Detach the mounting plate from the mounting
pole by unscrewing the two screws. Set the screws
and pole aside for later.
1
2) Place the mounting plate on the wall or ceiling.
If you are installing a gang box in the wall, leave
at least eleven inches between the top of the
gang box and the ceiling. If you are installing the
gang box in the ceiling, leave at least eleven inches
between the gang box and the wall.
2
11”
Minimum
3) Confirm that the mounting plate is level with the
floor. With the mounting plate as a guide, use the
pencil to trace the locations of the four larger holes
at the outer corners of the plate.
3
4) Remove the mounting plate and drill the four
holes that were just traced. Insert the four wall
anchors into the holes.
4
66
Page 67
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Square Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Insert the #8 screws through the mounting plate
and into the anchors.
5
5b) If you are installing the clock atop an gang box,
use the green screw to attach a grounding wire to
the mounting plate.
5B
6) Detach the housing from the back of each clock.
Do this by inserting a flat-blade screwdriver about
1/8 inch into each of the slot holes until the piece
detaches. You may hear a snapping noise as the
latches disengage.
6
7) Release the mounting piece from the back of
the housing by sliding it towards the center of the
housing, then pulling it back and away from the
housing. You will not need the mounting pieces
later; either store them or throw them away at
your discretion. DO NOT THROW AWAY
THE HOUSINGS.
1
7
Mounting
piece
2
Housing
67
Page 68
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Square Clock - Battery Powered
8) Attach the clock housing to the pole using four black #8-32x7/16 screws and four internal-tooth washers.
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
8
9) Attach the base of the pole to the mounting plate, so that the lip is on the top of the base, and the
holes for the screws are on the bottom of the base. Hang the base on the mounting plate, attach the
wires from the bottom of the pole to the wires in the gang box, then screw the other side of the base
onto the mounting plate using the two black screws you set aside before.
2
9
1
1
2
WALL
CEILING
68
Page 69
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Square Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
10) Remove the back covers from the battery pack
by pulling the two latches away to either side and
sliding the cover out.
10
12) Place the cover back onto the battery pack. You should hear a snapping noise as the latches engage.
11) Remove the gearbox pin, then insert the
batteries into the clock. If the clock is within range
of a powered transmitter, the hands should begin to
move within a minute.
1
11
2
12
69
Page 70
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Square Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
13) Rotate the clock so that it is right-side up. Slide
the clock back into its housing. You should hear a
snapping noise as the latches reengage.
WALL
1314
CEILING
14) If you feel the need to detach the clock
from the housing after the installation has been
completed, use a flat-blade screwdriver on the
four slots around the outside of the housing.
You may hear a snapping noise as the internal
latches disengage.
70
Page 71
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Square Clock - Locally Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG square analog clock
Quantity
1
Included in Pole Kit (SAB-4GD-00S-0 or SAB-1GD-00S-0 )
Dual-mount pole, including
mounting plate.
#8-32x7/16 screw
M3.5-1.0x10 screw (black)
Internal-tooth washer
1
8 (4 used)
4 (not used)
8 (4 used)
Picture
#10-32x3/8 green screw
#6 -32x1 screw
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
1
2
Continued on next page
71
Page 72
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Square Clock - Locally Powered
Included in Package
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Description
Power/grounding wires
Quantity
1
Picture
And connector
(not used)
#8x1.5 Self-tapping screw
Wall anchor
2
2 (not used)
Included in Gang Box Kit (A-GB-MK-1)
#6 -32x1 screw
#6-19x3 /8 screw
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small flat-blade screwdriver, a drill with a 1/4 inch drill bit, a pencil, a double
gang box, four wall anchors (must support 50 lbs, #8 screw size, 1.5”(3.8cm) screw length), four #8 screws for the wall anchors, two additional #6-32x1
screws for attaching the mounting plate to the gang box, any equipment needed to install the gang box, and any additional wiring needed to extend the
power or ground cables.
2 (not used)
1 (not used)
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
72
Page 73
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Square Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Install the double gang box in the wall or ceiling.
If you are installing the gang box in the wall, leave
at least eleven inches between the top of the
gang box and the ceiling. If you are installing the
gang box in the ceiling, leave at least eleven inches
between the gang box and the wall. The box should
be installed level and plumb with the wall
and ceiling.
Ceiling
1
11” Minimum
2) Run power wiring to the gang box.
For 24V power use the ORANGE and YELLOW wires
For 110V power use the BLACK and WHITE wires
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 115
volt model, 207-253 volts AC in the 230 volt
model, or 21.5-26.5 volts AC in the 24
volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.
2
3) Detach the mounting plate from the mounting
pole by unscrewing the two screws. Set the screws
and pole aside for later.
34
4) Attach the mounting plate to the gang box using
only two of the four long, silver #6-32x1 screws.
With the mounting plate as a guide, use the pencil
to trace the locations of the four larger holes at the
outer corners.
73
Page 74
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Square Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Remove the mounting plate and drill the four
holes that were just traced. Insert the four wall
anchors into the holes.
5
7) Thread any wiring through the mounting plate,
and attach a grounding wire to the mounting plate
using one of the larger centered holes and the
#10-32x3/8 screw.
6) Reattach the mounting plate, this time using all
four long, silver #6-32x1 screws, then insert the four
#8 screws through the mounting plate and into
the anchors.
6
8) Detach the housing from the back of each clock.
Do this by inserting a flat-blade screwdriver about
1/8 inch into each of the slot holes until the piece
detaches. You may hear a snapping noise as the
latches disengage.
7
8
74
Page 75
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Square Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
9) Release the mounting piece from the back of
the housing by sliding it towards the center of the
housing, then pulling it back and away from the
housing. You will not need the mounting pieces
later; either store them or throw them away at your
discretion. DO NOT THROW AWAY
THE HOUSINGS.
1
9
Mounting
piece
2
Housing
10) Attach the clock housing to the pole using
four black #8-32x7/16 screws and four
internal-tooth washers.
10
11) Thread at least fifteen inches (38.1cm) of wiring from the gang box through the bottom of the pole
until each wire exits through the hole in the adapter.
11
Adapter hole
75
Page 76
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Square Clock - Locally Powered
12) Attach the base of the pole to the mounting plate, so that the lip is on the top of the base, and the
holes for the screws are on the bottom of the base. Hang the base on the mounting plate, attach the
wires from the bottom of the pole to the wires in the gang box, then screw the other side of the base
onto the mounting plate using the two black screws you set aside before.
2
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
12
1
2
13) Attach the power wires from your kit to the
wires you threaded through the pole.
• Attach the Hot wire to the connector’s black wire.
• Attach the Common wire to the connector’s
white wire.
• Attach the Ground wire to the connector’s
green wire.
Consult the diagram on the left for additional help.
1
CEILINGWALL
Gang
Box
13
Ground
Green
Black
White
CLOCK 1
Black
Green
White
Common
Power
76
Page 77
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Flag Mount Installation - Square Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
14) First remove the gearbox pin, then attach
the power connector to the port on the movement.
1
14
2
16) Rotate the clock so that it is right-side up. Slide
the clock back into its housing. You should hear a
snapping noise as the latches reengage.
15) Loosen the strain relief by unscrewing the two
screws. Slip any excess wiring through them, then
tighten the strain relief by reinserting and tightening
the screws.
15
17) If you feel the need to detach the clock from the
housing after the installation has been completed,
use a flat-blade screwdriver on the four slots
around the outside of the housing. You may hear a
snapping noise as the internal latches disengage.
WALL
1617
CEILING
77
Page 78
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Double Mount Installation - Round Standard ABS Clock - Battery Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG round analog clock
Quantity
2
Included in Double Mount Kit (SAB-4BD-12R-0 or SAB-4BD-16R-0)
(SAB-4BD-12R-0M or SAB-4BD-16R-0M)
Dual-mount pole, including
mounting plate and adapters
#10-32x3/8 green screw
1
1
Included in Wiring Kit (A-WK-12-1)
Mounting Bracket
2 (not used)
Picture
#10x1.5 Self-tapping screw
Wall anchor
#4x5/16 Screw
Bracket Securing Nut
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small slot-head screwdriver, a drill with a 1/4 inch drill bit, a pencil, a double
gang box, four wall anchors that can support 50 lbs and a maximum screw size of 10x1.5”, four #8 screws for the wall anchors, four #6-32x1 screws for
attaching the mounting plate to the gang box, any equipment needed to install the gang box, and any additional wiring needed to extend the power or
ground cables.
4 (not used)
4 (not used)
2
2 (not used)
78
Page 79
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round Standard ABS Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Detach the mounting plate from the mounting
pole by unscrewing the two screws. Set the screws
and pole aside for later.
1
2) Place the mounting plate on the wall or ceiling.
If you are installing a gang box in the wall, leave
at least eleven inches between the top of the
gang box and the ceiling. If you are installing the
gang box in the ceiling, leave at least eleven inches
between the gang box and the wall.
2
3) Confirm that the mounting plate is level with the
floor. With the mounting plate as a guide, use the
pencil to trace the locations of the four larger holes
at the outer corners of the plate.
3
4) Remove the mounting plate and drill the four
holes that were just traced. Insert the four wall
anchors into the holes.
4
79
Page 80
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round Standard ABS Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Insert the #8 screws through the mounting plate
and into the anchors.
5
5b) If you are installing the clock atop an gang box,
use the green screw to attach a grounding wire to
the mounting plate.
5B
6) Attach the base of the pole to the mounting plate so that the lip is on the top of the base, and the
holes for the screws are on the bottom of the base. Hang the base on the mounting plate, attach the wires
from the bottom of the pole to the wires in the gang box, then screw the other side of the base onto the
mounting plate using the two black screws you set aside before.
1
2
WALL
2
6
1
CEILING
80
Page 81
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round Standard ABS Clock - Battery Powered
7) Remove the back cover from each battery pack by pulling the two latches away to either side and sliding
the cover out.
For instructions regarding the original battery pack and movement
design, refer to the section of this manual labeled “Legacy
Movement - Battery Powered”.
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
7
8) First remove the gearbox pins, then insert the batteries into each clock. If the clock is within range
of a powered transmitter, the hands should begin to move within a minute.
1
2
8
81
Page 82
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round Standard ABS Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
9) lace the covers back onto each battery pack. You
should hear a snapping noise as the latches engage.
9
10) Remove the outer adapter screws, then slide
each clock onto the adapter in the rotation that you
wish it to be viewed. You should hear a snapping
noise as the four clips on the adapter secure the
clock in place. Insert the screws again to complete
the installation.
10
11) If you feel the need to detach the clock from the housing after the installation has been completed,
remove the outer adapter screws, press down on the latches, and gently pull on the rim of the clock until
the clock detaches.
11
82
Page 83
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Double Mount Installation - Round Standard ABS Clock - Locally Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG round analog clock
Quantity
2
Included in Double Mount Kit (SAB-4BD-12R-0 or SAB-4BD-16R-0)
(SAB-4BD-12R-0M or SAB-4BD-16R-0M)
Dual-mount pole, including
mounting plate and adapters
#10-32x3/8 green screw
1
1
Included in Wiring Kit (A-WK-12-1V)
Mounting Bracket
1 (not used)
Picture
Power/grounding wires
and connector
Bracket securing nut
#10x1.5 Self-tapping screw
Wall anchor
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small slot-head screwdriver, a drill with a 1/4 inch drill bit, a pencil, a double
gang box, four wall anchors that can support 50 lbs and a maximum screw size of 10x1.5”, four #8 screws for the wall anchors, four #6-32x1 screws for
attaching the mounting plate to the gang box, any equipment needed to install the gang box, and any additional wiring needed to extend the power or
ground cables.
1
1 (not used)
2
2
83
Page 84
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round Standard ABS Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Install the double gang box in the wall or ceiling.
If you are installing the gang box in the wall, leave
at least eleven inches between the top of the
gang box and the ceiling. If you are installing the
gang box in the ceiling, leave at least eleven inches
between the gang box and the wall.
Ceiling
1
11” Minimum
2) Run power wiring to the gang box.
For 24V power use the ORANGE and YELLOW wires
For 110V power use the BLACK and WHITE wires
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 115
volt model, 207-253 volts AC in the 230 volt
model, or 21.5-26.5 volts AC in the 24
volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.
2
3) Detach the mounting plate from the mounting
pole by unscrewing the two screws. Set the screws
and pole aside for later.
3
4) Attach the mounting plate to the gang box using
only two of the four long silver #6-32x1 screws.
With the mounting plate as a guide, use the pencil
to trace the locations of the four larger holes at the
outer corners.
4
84
Page 85
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round Standard ABS Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Remove the mounting plate and drill the four
holes that were just traced. Insert the four wall
anchors into the holes.
5
7) Thread any wiring through the mounting plate,
and attach a grounding wire to the mounting plate
using one of the larger centered holes and the
#10-32x3/8 screw.
6) Reattach the mounting plate, this time using all
four long, silver #8 screws, then insert the four
#6-32x1 screws through the mounting plate and
into the anchors.
6
8) Thread at least fifteen inches (38.1cm) of wiring
from the gang box through the bottom of the pole
until each wire exits through the hole in the adapter.
7
8
Adapter hole
85
Page 86
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round Standard ABS Clock - Locally Powered
9) Attach the base of the pole to the mounting plate so that the lip is on the top of the base, and the
holes for the screws are on the bottom of the base. Hang the base on the mounting plate, attach the
wires from the bottom of the pole to the wires in the gang box, then screw the other side of the base
onto the mounting plate using the two black screws you set aside before.
2
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
9
1
2
WALL
10) Attach the power connectors to the wires you
threaded through the pole.
• Attach the Hot wire to each connector’s black wire.
• Attach the Common wire to each connector’s
white wire.
• Attach the Ground wire to each connector’s
green wire.
Consult the diagram on the left for additional help.
1
CEILING
Common
Gang
Box
Ground
Green
Black
White
Yellow
CLOCK 1CLOCK 2
10
BlackBlack
GreenGreen
WhiteWhite
Power
86
Page 87
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round Standard ABS Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
11) First remove the gearbox pins, then attach the
power connector to the port on each movement.
1
1
1112
2
2
12) Remove the outer adapter screws, then slide
each clock onto the adapter in the rotation that you
wish it to be viewed. You should hear a snapping
noise as the four clips on the adapter secure the
clock in place. Insert the screws again to complete
the installation.
13) If you feel the need to detach the clock
from the housing after the installation has been
completed, remove the outer adapter screws, press
down on the latches, and gently pull on the rim of
the clock until the clock detaches.
13
87
Page 88
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Double Mount Installation - Round SlimLine/Aluminum Clock - Battery Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG round SlimLine
Quantity
2
analog clock
Included in Double Mount Kit (SAH-4BD-12R-0 or SAH-4BD-16R-0)
(SAH-1BD-12R-0 or SAH-1BD-16R-0)
Dual-mount pole, including
mounting plate.
#10-32x3/8 green screw
#8-32x7/16 screw
1
1
8
Picture
M3.5-1.0x10 screw (black)
Internal-tooth washer
#6 -32x1 screw
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
4
8
4
Continued on next page
88
Page 89
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Double Mount Installation - Round SlimLine/Aluminum Clock - Battery Powered
Included in Mounting Kits (A-SLM-MK-S-1) or (A-SLM-MK-AW)
Description
Mounting Piece
Release lever
#6-19x7/16 screw
Strain relief
Included in Wiring Kit (A-WK-MTG-1)
#10x1.5 Self-tapping screw
Quantity
2 (not used)
0 or 2 (not used)
4
2
2
Picture
Wall anchor
Included in Gang Box Kit (A-GB-MK-1)
#6 -32x1 screw
#6-19x3 /8 screw
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small flat-blade screwdriver, a drill with a 1/4 inch drill bit, a pencil, a double
gang box, four wall anchors (must support 50 lbs, #8 screw size, 1.5”(3.8cm) screw length), four #8 screws for the wall anchors, any equipment needed to
install the gang box, and any additional wiring needed to extend the power or ground cables.
SlimLine and Aluminum Clocks use the same installation procedures for double mount housings.
2
4 (not used)
2 (not used)
89
Page 90
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round SlimLine/Aluminum Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Detach the mounting plate from the mounting
pole by unscrewing the two screws. Set the screws
and pole aside for later.
1
2) Place the mounting plate on the wall or ceiling.
If you are installing a gang box in the wall, leave
at least eleven inches between the top of the
gang box and the ceiling. If you are installing the
gang box in the ceiling, leave at least eleven inches
between the gang box and the wall.
2
3) Confirm that the mounting plate is level with the
floor. With the mounting plate as a guide, use the
pencil to trace the locations of the four larger holes
at the outer corners of the plate.
3
4) Remove the mounting plate and drill the four
holes that were just traced. Insert the four wall
anchors into the holes.
4
90
Page 91
The Sapling Company, Inc.
1
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round SlimLine/Aluminum Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Insert the #8 screws through the mounting plate
and into the anchors.
5
5B) If you are installing the clock atop an gang box,
use the green screw to attach a grounding wire to
the mounting plate.
5B
6) Attach the base of the pole to the mounting plate so that the lip is on the top of the base, and the
holes for the screws are on the bottom of the base. Hang the base on the mounting plate, attach the
wires from the bottom of the pole to the wires in the gang box, then screw the other side of the base
onto the mounting plate using the two black screws you set aside before.
2
6
1
1
2
2
1
WALL
CEILING
91
Page 92
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round SlimLine/Aluminum Clock - Battery Powered
7) Remove the back covers from the battery pack by pulling the two latches away to either side and sliding
the cover out.
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
7
8) First remove the gearbox pins, then insert the
batteries into the clock. If the clock is within range
of a powered transmitter, the hands should begin to
move within a minute.
1
8
2
9) Place the cover back onto the battery pack. You
should hear a snapping noise as the latches engage.
9
92
Page 93
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round SlimLine/Aluminum Clock - Battery Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
10) Slide each clock onto the adapter in the rotation
that you wish it to be viewed. You should hear a
snapping noise as the four clips on the adapter
secure the clock in place.
1011
11) If you feel the need to detach the clock from the
housing after the installation has been completed,
use a flat-blade screwdriver on the four slots
around the outside of the housing. You may hear a
snapping noise as the internal latches disengage.
93
Page 94
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Double Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG round SlimLine
Quantity
2
analog clock
Included in Double Mount Kit (SAH-4BD-12R-0 or SAH-4BD-16R-0)
(SAH-1BD-12R-0 or SAH-1BD-16R-0)
Dual-mount pole, including
mounting plate.
#10-32x3/8 green screw
#8-32x7/16 screw
1
1
8
Picture
M3.5-1.0x10 screw (black)
Internal-tooth washer
#6 -32x1 screw
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
4
8
4
Continued on next page
94
Page 95
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Double Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
Included in Mounting Kits (A-SLM-MK-S-1) or (A-SLM-MK-AW)
Description
Mounting Piece
Release lever
#6-19x7/16 screw
Strain relief
Included in Wiring Kit (A-WK-12-1V)
Power/grounding wires
And connector
Quantity
2 (not used)
0 or 2 (not used)
4
2
2
Picture
#8x1.5 Self-tapping screw
Wall anchor
Included in Gang Box Kit (A-GB-MK-1)
#6 -32x1 screw
#6-19x3 /8 screw
PLEASE NOTE: A user will also have to provide a Phillips-head screwdriver, a small flat-blade screwdriver, a drill with a 1/4 inch drill bit, a pencil, a double
gang box, four wall anchors (must support 50 lbs, #8 screw size, 1.5”(3.8cm) screw length), four #8 screws for the wall anchors, any equipment needed to
install the gang box, and any additional wiring needed to extend the power or ground cables.
SlimLine and Aluminum Clocks use the same installation procedures for double mount housings.
(not used)
4
4 (not used)
4 (not used)
2 (not used)
95
Page 96
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1) Install the double gang box in the wall or ceiling.
If you are installing the gang box in the wall, leave
at least eleven inches between the top of the
gang box and the ceiling. If you are installing the
gang box in the ceiling, leave at least eleven inches
between the gang box and the wall. The box should
be installed level and plumb with the wall
and ceiling.
Ceiling
1
11” Minimum
2) Run power wiring to the gang box.
For 24V power use the ORANGE and YELLOW wires
For 110V power use the BLACK and WHITE wires
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 115
volt model, 207-253 volts AC in the 230 volt
model, or 21.5-26.5 volts AC in the 24
volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.
2
3) Detach the mounting plate from the mounting
pole by unscrewing the two screws. Set the screws
and pole aside for later.
3
4) Attach the mounting plate to the gang box using
only two of the four long, silver #6-32x1 screws.
With the mounting plate as a guide, use the pencil
to trace the locations of the four larger holes at the
outer corners.
4
96
Page 97
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
5) Remove the mounting plate and drill the four
holes that were just traced. Insert the four wall
anchors into the holes.
5
7) Thread any wiring through the mounting plate,
and attach a grounding wire to the mounting plate
using one of the larger centered holes and the
#10-32x3/8 screw.
6) Reattach the mounting plate, this time using all
four long, silver #6-32x1 screws, then insert the
four #8 screws through the mounting plate and into
the anchors.
6
8) Thread at least fifteen inches (38.1cm) of wiring
from the gang box through the bottom of the pole
until each wire exits through the hole in
the adapter.
7
8
Adapter hole
97
Page 98
The Sapling Company, Inc.
1
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
9) Attach the base of the pole to the mounting plate so that the lip is on the top of the base, and the
holes for the screws are on the bottom of the base. Hang the base on the mounting plate, attach the
wires from the bottom of the pole to the wires in the gang box, then screw the other side of the base
onto the mounting plate using the two black screws you set aside before.
2
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
9
1
2
2
WALL
10) Attach the power connectors to the wires you
threaded through the pole.
• Attach the Hot wire to each connector’s black wire.
• Attach the Common wire to each connector’s
white wire.
• Attach the Ground wire to each connector’s
green wire.
Consult the diagram on the left for additional help.
1
1
CEILING
Gang
Box
Common
Power
10
Ground
Green
Black
White
Yellow
CLOCK 1CLOCK 2
BlackBlack
GreenGreen
WhiteWhite
98
Page 99
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
Double Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
11) First remove the gearbox pins, then attach a
power connector to the ports on the side of
each movement.
1
1112
2
13) Slide each clock onto the adapter in the rotation
that you wish it to be viewed. You should hear a
snapping noise as the four clips on the adapter
secure the clock in place.
12) Lay any excess wiring across the strain relief
base, then attach the strain relief to the clock with
the two #6-19x7/16 screws. The strain relief should
be tight enough to prevent the wire from sliding.
14) If you feel the need to detach the clock from the
housing after the installation has been completed,
use a flat-blade screwdriver on the four slots
around the outside of the housing. You may hear a
snapping noise as the internal latches disengage.
1314
99
Page 100
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Double Mount Installation - Square Clock - Battery Powered
VERY IMPORTANT:
INSTALL, POWER, AND SET YOUR MASTER CLOCK OR REPEATER BEFORE POWERING THE SECONDARY
WIRELESS CLOCKS
A Sapling Master Clock and any Repeaters must be installed, powered, and set up BEFORE you attempt to set up a wireless clock system. If
the Master Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.
Included in Package
Description
SAL or SALG square analog clock
Mounting Piece-already attached
Quantity
2
2
(not used)
to clock housing
Included in Pole Kit (SAB-4GD-00S-0 or SAB-1GD-00S-0)
Dual-mount pole, including
mounting plate.
#10-32x3/8 green screw
#8-32x7/16 screw
1
1
8
Picture
M3.5-1.0x10 screw (black)
Internal-tooth washer
#6 -32x1 screw
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
4
8
4
Continued on next page
100
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.