Assembly instructions for Model: CFV69
Thank you for choosing Sanus Systems Component Furniture. Please check carefully to make sure there are no missing or defective parts. Never use defective parts. Improper assembly may cause damage or serious injury. If you have any questions regarding this product, contact Sanus at 800.359.5520 or visit www.sanus.com. Our customer service representatives can quickly assist you with missing or damaged parts. Replacement parts for Sanus products purchased through authorized dealers can be shipped directly to you. Please call Sanus Systems before returning products to the point of purchase.
Required Tools: Phillips screw driver
NOTE: Check to make sure all of the parts and hardware are accounted for.
Hardware: Shown at actual size.
Cam Pin - B |
Back Panel Spacer - C |
Back Panel Bolt - D |
Qty. 8 |
Qty. 12 |
Qty. 12 |
Carpet Spike & Nut - A
Qty. 4
Mounting Block Screw - E |
Glass Shelf Pin - F |
Shelf Pin - G |
Dowel - H |
Qty. 8 |
Qty. 4 |
Qty. 8 |
Qty. 6 |
Threaded Cam Pin - I |
Barrel Nut - J |
Barrel Nut Bolt - K |
|
Isolation Pad - L |
|||||||||||||||||||||||||||||||||||
Qty. 4 |
Qty. 4 |
Qty. 4 |
|
|
|
|
|
|
|
|
|
|
|
Qty. 8 |
|||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Bottom Shelf Pin - M |
Wood Screw - N |
Knob Bolt - O |
Qty. 4 |
Qty. 4 |
Qty. 2 |
|
|
|
|
|
|
|
|
|
|
Hinge Screw - Q |
Hinge Plate Screw - R |
Allen Key - S |
Knob - P |
Qty. 8 |
Qty. 8 |
Qty. 1 |
|
|
|
|
Qty. 2 |
|
|
|
Sanus Systems 2221 Hwy 36 West, Saint Paul, MN 55113 02.16.06 (000022)
Customer Service: 800.359.5520. See complementary Sanus products at www.sanus.com
Parts:
Foot - T |
Cntr. Panel Mtg. Block - U |
Bottom Shelf Retainer - V |
Hinge - W |
Hinge Plate - X |
Qty. 4 |
Qty. 4 |
Qty. 2 |
Qty. 4 |
Qty. 4 |
Top - Y |
Bottom Shelf - Z |
|
Qty. 1 |
||
Qty. 1 |
||
|
Front Rail - AA |
Back Rail - BB |
|
Qty. 2 |
||
Qty. 2 |
||
|
|
|
Isolation Shelf - EE |
Glass Shelf - FF |
Outer Back Panel - CC |
Center Back Panel - DD |
Qty. 2 |
Qty. 2 |
|
|
||
Qty. 2 |
Qty. 1 |
|
|
Side Panel - GG |
Left Center Divider - HH |
Right Center Divider - II |
Qty. 2 |
Qty. 1 |
Qty. 1 |
|
|
|
|
|
|
|
|
|
|
Center Panel - JJ |
Side Door - KK |
|
|
|
|
||||
Qty. 1 |
Qty. 2 |
Step 1: Add feet
WARNING: The ends of the Carpet Spikes are very sharp and may scratch floors or furniture. All sharp objects can be hazardous to children. For this reason Sanus Systems provides the carpet spikes as an option. Sanus Systems will not be liable for damage or injury.
Add a Foot (T) to the Pillar of each Side Panel (GG) as shown in Diagram 1. If you wish to install the Carpet Spikes (A), thread each Carpet Spike into the Foot as seen in Diagram 1. To adjust the height of the Carpet Spike, simply thread it in or out; then, snug the Nut against the base of the Foot to lock the Carpet spike in place.
Diagram 1
Pillar
GG
T
A |
Nut |
|
|
|
Spike |
Step 2: Attach the lower Front and Back Rails to the first Side Panel
AA Flange
NOTE: Make sure the flange on the Front Rail (AA) faces the back of the unit.
Attach the Front Rail (AA) to the Side Panel (GG) by sliding the Clamp down the groove in the Side Panel Pillar as shown in Top View A. Once the Front Rail is positioned at the bottom of the groove and resting on the Foot (T), tighten the Allen Bolt on the back side of the Front Rail so the clamp widens to hold the Front Rail firmly in place.
NOTE: Make sure the arrow on each Cam is facing the hole in the outside of the Back Rail (BB).
Insert two Cam Pins (B) into each end of the Back Rail (BB) as shown in the Detail View of Diagram 2. Insert the Cam Pins until there is a small space between the head of the Cam Pin and the Back Rail.
Attach the Back Rail (BB) by sliding the Cam Pins (B) down the groove on the Side Panel (GG) Pillar as shown in Top View B. Once the Back Rail is resting on the Foot, tighten the Cams labeled in the Detail View of Diagram 2 to hold them in place. Make sure the Back Rail is oriented so the threaded holes near the ends are on the top, and the Cams face inside the cabinet, as shown in Diagram 2.
|
Top View A |
|
Diagram 2 |
|
Top View B |
(Front Left Corner) |
|
AA |
(Back Left Corner) |
||
|
|
|
BB |
|
|
GG |
Allen |
|
|
|
|
Bolt |
|
|
|
BB |
|
|
|
|
Detail View |
|
|
|
|
|
|
|
|
|
AA |
|
B |
|
|
|
|
Cam |
|
Cam |
|
|
|
|
|
||
|
|
|
GG |
Pin |
|
|
|
|
BB |
||
|
Clamp |
T GG |
(B) |
||
|
|
||||
|
|
|
|
|
Step 3: Add second Side Panel Assembly
Attach the second Side Panel Assembly (GG) by sliding the clamp in the Front Rail (AA) and the Cam Pins (B) in the Back Rail (BB) down the grooves in the Pillars on the Side Panel until they are at the bottom of the Pillar and resting on the Foot (T). Use the Allen Key (S) to tighten the Allen Bolt in the back of the Front Rail to widen the clamp and secure it to the Pillar. Tighten the two Cams in the Back Rail (BB) to secure it to the Pillar.
Top View |
Top View |
(Front Right Corner) |
(Back Right Corner) |
|
|
Diagram 3 |
BB |
|
GG |
Allen |
|
Allen |
|
||
|
Bolt |
|
|
Bolt |
|
GG |
|
|
|
||
|
|
BB |
|
|
|
|
|
|
|
|
Cam |
|
|
|
Pin |
|
|
|
(B) |
AA |
|
T AA |
GG |
|
|
||
|
Clamp |
|
T |
|
|
|
Step 4: Add Bottom Shelf
Thread a Bottom Shelf Pin (M) into the Side Panel (GG) as shown in Diagram 4. Repeat this process until all four Bottom Shelf Pins have been inserted into both Side Panels.
Press fit the Bottom Shelf (Z) until it is locked into the Bottom Shelf Pins (M).
Diagram 4
GG
Z GG
Z
GG
M