
COLLECTION
WIDESPREADS
This is a general installation instruction
for the following collections:
PLEASE READ THE INSTRUCTIONS COMPLETELY * AVA * AVA CRYSTAL
BEFORE BEGINNING THE INSTALLATION.
Note: Important notice on Page 3!
Read carefully installation instruction step 4!
MINIMUM HOLE SIZE FOR THE SPOT AND
HANDLE TRIM IS 1 ¼” AND MAXIMUM 1 ½”
HANDLE
DO NOT TIGHTEN HOSE
DO NOT TIGHTEN HOSE
*** NOTE: SHUT OFF WATER SUPPLY BEFORE BEGINNING INSTALLATION***
INSPECTED BY ____________
KEEP THIS INSTRUCTION BOOKLET FOR FUTURE REFERENCE
Page 01

INSTALLATION INSTRUCTIONS
SPOUT INSTALLATION
COLLECTION
WIDESPREADS
Step 1.
• Remove the mounting hardware from the spout.
mounting
hardware
Step 2.
• Apply a ring of silicone caulking around hole
designated for spout.
DO NOT USE PLUMBERS’ PUTTY WHICH CAN
DAMAGE FINISH.
• Insert spout through center hole sink or
countertop.
E
N
O
C
I
L
I
S
Step 3.
• From below, slip notched washer and gasket
over spout shank. Align notched washer and
gasket to allow pop-up rod to pass through.
• Attach wing nut and brass lock nut.
washer
gasket
wing nut
brass lock nut
Step 4.
• Secure spout by tightening the two screws on
wing nut.
• Thread tee connector and washer to spout
shank and tighten to seal.
Page 02