Santec 7093DC-TM User Manual

PLEASE READ THE INSTRUCTIONS COMPLETELY BEFORE BEGINNING THE INSTALLATION.
Thermostatic control
KEEP THIS INSTRUCTION BOOKLET FOR FUTURE REFERENCE
PAGE 01
INSTALLATION INSTRUCTIONS
Rough installation
- Turn the water supplies off.
Finished wall
Minimum and Maximum Lines
-
Max
Min
- Secure the valve firmly against the stub.
- Make sure that the shower out let is in the up position.
- Flush or raise grouting on the tiled wall surface.
- Connect the supply lines to the valve inlets.
- The rough de pth must fall within the minimum /
m ax imum range lines marked on the plas ter gu ard.
- For both functional and esthetic reasons, the valve must be leveled horizontally.
- When soldering the inlet connection, make sure that all internal parts are removed to avoid damages to the nonĀ­ metal parts.
Thermostatic control
- If only the shower portion of the valve will be used, keep the tub outlet plugged at all time.
Trim installation
1.
Max
Min
- Remove the screws from the plaster guard.
- Remove the plaster guard.
PAGE 02
Loading...
+ 2 hidden pages