PLEASE READ THE INSTRUCTIONS COMPLETELY
BEFORE BEGINNING THE INSTALLATION.
COLLECTION
T HE R MO S TAT IC C ONT R OL
This is a general installation instruction
for the following collections:
* AVA * AVA CRYSTAL
KEEP THIS INSTRUCTION BOOKLET FOR FUTURE REFERENCE
PAGE 01
INSTALLATION INSTRUCTIONS
Rough installation
- Turn the water supplies off.
Finished wall
Minimum and
Maximum Lines
-
Max
Min
- Remove all the trim items (plate and handle) before
installation.
- Secure the valve firmly against the stub.
- Make sure that the shower out let is in the up position.
- Flush or raise grouting on the tiled wall surface.
- Connect the supply lines to the valve inlets.
- The rough de pth must fall within the m inimum/
m aximum range lines mar ked on the plas ter guard.
- For both functional and esthetic reasons, the valve must
be leveled horizontally.
- When soldering the inlet connection, make sure that all
internal parts are removed to avoid damages to the nonĀ metal parts.
Thermostatic control
- If only the shower portion of the valve will be used, keep
the tub outlet plugged at all time.
Trim installation
1.
Min
Max
- Remove the screws from the plaster
guard.
- Remove the plaster guard.
PAGE 02