Santec 3632EN-TM User Manual

PLEASE READ THE INSTRUCTIONS COMPLETELY BEFORE BEGINNING THE INSTALLATION.
Pressure Balanced Tub/Shower
H
C
KEEP THIS INSTRUCTION BOOKLET FOR FUTURE REFERENCE
PAGE 01
INSTALLATION INSTRUCTIONS
Pressure Balanced Tub/Shower
DESCRIPTION
WALL LINE
SPECIFICATIONS AND DIMENSIONS
½”
78"
(1981 mm)
Minimum operating pressure 20 psi Maximum operating pressure 145 psi Maximum test pressure 500 psi Hot and cold water inlets ½" IPS
½”
33"
Shower outlet ½" IPS Flow capacity 5 USGPM@ 50 psi Finished wall adjustment : see Illustration B
FLOOR
LINE
INSTALLATION
NOTE: Failure to follow these instructions may cause damage or improper operations and nullify the warranty.
ROUGH IN
- Make sure the water supplies are off.
- Remove all the trim items (plate, handle and flange) before installation.
- Secure the valve firmly against the stud. Make sure the ½" shower outlet is in the up position.
- Make sure to flush or raise grouting on the tiled wall surface.
- Adjust the All Thread depth against the Teflon Washer and Limit Stop. Screw the All Thread against the Teflon washer until it is pressured gently against each other.
- Tighten firmly the Lock Nut against the Lock Plate.
- Position the valve using the dimension shown in the illustration B.
3.00”
Trim Plate
FLANGE WASHER
HANDLE BELL
HANDLE
S
All Thread
Stem
Lock Nut
Lock Plate
Diverter Knob
T
Diverter Rod
Diverter Rod O-Ring
ILLUSTRATION B
PAGE 02
Loading...
+ 2 hidden pages