Samsung Electronics
LED Display
Installation Manual
LH008IWJ*** (P0.84)
LH012IWJ*** (P1.26)
LH016IWJ*** (P1.68)
SNOW-1810U
Ver. 2.0 (2020.03.20)
Samsung Electronics
When humidity get into LED package because of high humidity, it is
possible to cause ‘Line defect’ by electrical short in side of LED
Package.
For keeping quality of products during installation, please refer below
cautions.
- If one of below case meet before installation, MUST do dehumidification process.
∙ Case when vacuum packaging is broken before unpacking.
∙ Case when environment condition is exceed Samsung recommended operation condition.
(Please refer Operation condition from User manual)
∙ Case when period between unpacking and turning on the power of products is spent
more than 7days, even though it is under Samsung recommended storage condition.
∙ Case when production date on the label is exceed more than 6 months, even though
vacuum packaging is no problem.
- When Volatile chemicals such as oil paint, solvent are used or operation condition
is exceed around of products installed place, MUST play video more than 2 hours
everyday.
- If it is not meet with upper cases, it is helpful to play video more than 2 hours
everyday for protection for humidity getting into LED Package.
Dehumidification guidance – during installation
Samsung Electronics
Electrical short in package is possible to happen during products are
working.
For keeping quality of products during installation, please refer below
cautions.
- If one of below case meet during operation, MUST do dehumidification process.
∙ Case when environment condition is exceed operation condition.
∙ Case when products are not working more than 1 month, even though environment
condition is under operation condition.
- When environment condition is exceed operation condition, products are out of
warranty. Please check environment condition.
- Even products are operating, if the installed place have extra construction such as
interior modification, MUST do dehumidification following installation condition.
- It is possible to happen dew condensation on surface of products, even though
working on operating condition. When happening dew condensation, MUST
operate after cleaning the dew condensation & dehumidification.
Dehumidification guidance – during operation
Samsung Electronics
Dew condensation due to overcooling
Even though meet with Samsung recommended operation
condition, dew condensation is possible to happen when
surface of products is colder than environment temperature or
hot & humid air blow to cooled surface of products.
(cf : Principle of happening dew on surface of glass which have ice)
Case when dew condensation is happen on products, it is
possible to be the root of defect. In this case, it is possible to
be out of warranty.
Samsung Electronics
When install products, please update latest firmware on online
- You can download latest firmware from SLM site.
∙ URL of SLM Page : https://www.secslm.com
∙ After login Help Download Center에서 Download
∙ Before you download firmware, you MUST check same firmware of model (marked red
letter in below) & upper number of version (marked blue in below).
- You can update firmware through LSM.
∙ Please refer ‘7-1 PC control program’ for the way to update firmware.
5
Guidance of latest firmware
Cabinet : Main - L-xxxMWWAC-nnnn.n xxx = Pan name, nnnn.n = version
FPGA - aabbb_ddddd aa = pixel pitch, bbb = LED package type, ddddd= version
Example : IER P2.5 Cabinet : L-IERMWWAC-1003.1, FPGA : 25252-31046
S-box : TB-KTM2SBMDWWC_100x.x
Samsung Electronics
Check first before Installation (1/2)
6
• For HDBT signal stability, use the cable above CAT6 *STP, *FTP level. ( Length 15m~100m )
- Do not use “comb” or “pinstripe” cable.
“CAT6 UTP can not be allowed”
• All Power cables and OCM cable must be connected firmly
• Do not mix cabinet which have different Project number, each cabinet have its own project
number.
Module Cabinet
Box
Samsung Electronics
Check first before Installation (2/2)
7
• Install the device only using SNOW-1810U and its supplied IG.
※ Please check below Cabinet and S-box compatibility table information
S-Box
SNOW-1810U SNOW-1703ULD SNOW-1703U
I/G
BN91-20525A BN91-19993A BN91-19100A
Cabinet
IF015H,
IF020H,
IF025H,
IF025H-D,
IF040H-D,
IF060H-D,
IF012J,
IW008J
IW012J
IW016J
IF015H,
IF020H,
IF025H,
IF025H-D,
IF040H-D,
IF060H-D,
IF012J
IF015H,
IF020H,
IF025H,
IF025H-D,
IF040H-D,
IF060H-D
Samsung Electronics
Table of Contents
1. Product Information and Precautions for Installation ( 4 page )
2. Check Point about the Radiant Heat ( 9 page )
3. Preparation for Cabinet Installation ( 15 page )
4. Frame Installation ( 22 page )
5. Cabinet + Frame Installation ( 30 page )
6. Disassembly & Front Service ( 41 page )
7. Cable Connection ( 58 page )
8. S-BOX Installation and Connection ( 71 page )
9. LSM Settings and How to Use ( 88 page )
10. Issue and Solution ( 103 page )
11. Color Calibration ( 104 page )
12. Bezel Installation ( 107 page )
13. Annex ( 115 page )
8
Samsung Electronics
◇ Cabinet Infomation
9
IW008J (P0.84) IW012J (P1.26) IW016J (P1.68)
Basic Spec.
Pitch
0.84 mm 1.26 mm 1.68 mm
Cabinet Resolution 960 X 540 640 X 360 480 X 270
Color Spec.
Brightness (Max)
1600-nit/500-nit 1600-nit/800-nit 1400-nit/1000-nit
Contrast Ratio
10,000:1
Viewing angle (H/V)
145°/155° 140°/160° 135°/155°
Refresh rate
1920 Hz ~ 3840 Hz
Input Power
100~240 VAC, 50/60 Hz
Power consumption (Max)
190 (W/Cabinet) 192 (W/Cabinet) 180 (W/Cabinet)
Operation
Spec.
Working Temperature
0℃~+40℃/10~80%RH
IP Rating
IP20
Power Daisy Chain (220V / 110V)
4sets / 3sets
Spec.
Safety
60950-1
EMC
Class B
1. Product Information and Precautions for Installation
Samsung Electronics
◇ Screen configuration by model (Pitch) (Refer to page 22 for frame kit)
1. Product Information and Precautions for Installation
◇ SBB-SNOWJAU (S-Box, I/G)
◇ Cabinet Product Information
10
Specification
IWJ
P0.84 P1.26 P1.68
Cabinet
Cabinet Size
806.4 x 453.6 x 72.2 806.4 x 453.6 x 72.2 806.4 x 453.6 x 72.8
Module Size
201.6 mm x 151.2 mm
Weight
12.5kg 12.2kg 12.5kg
Screen
FHD
Cabinet Q’ty
2x2 (4set) 3x3 (9set) 4x4 (16set)
I/G Q’ty
1 1 1
Size
1612.8mm X 907.2mm 2419.2mm X 1360.8mm 3225.6mm X 1814.4mm
Frame Kit
VG-LFJ08FWW VG-LFJ08TWW VG-LFJ08UWW
Bezel
IWJPA-WP008D2X2 IWJPA-WP008D3X3 IWJPA-WP008D4X4
UHD
Cabinet Q’ty
4x4 (16set) 6x6 (36set) 8x8 (64set)
I/G Q’ty
4 4 4
Size
4838.4mm X 2721.6mm 6451.2mm X 3628.8mm
Frame Kit
VG-LFJ08UWW VG-LFJ08TWW x4 VG-LFJ08UWW x4
Bezel
IWJPA-WP008D4X4 IWJPA-WP008D3X3 IWJPA-WP008D4X4
x4
x4
(S-Box)
(I/G x4ea)
Interface Gender
Samsung Electronics
1. Product Information and
Precautions for Installation
• Precautions for Installation (LED damage)
11
Caution Image
[ Beware of Outside Impact, Fall]
① Beware not to cause any impact on the LED screen or drop the product on the floor
after the protection gets taken off for installation.
② Beware not to put the LED side headed downwards to the floor after the protection
gets taken off for installation.
③ Beware not to have the corner area of LED module be damaged due to the contact
with the outside.
④
Beware not to put more than 12 layers.
[Beware of LED Damage due to Static Electricity]
▶
Beware not to touch LED screen with bare hands without putting gloves on.
[Beware of LED & Film Damage due to Metallic Substances]
▶
Beware not to have metallic substances pulled in to the surface
due to the magnetic force on the front side of the LED.
▶
If any metallic substances get drawn in on the surface, please disassemble the
module and then remove the pollutants by using a magnet.
[Beware of LED Damage due to chemicals.]
▶
Beware not to contact water, waxes, benzene, thinners, mosquito repellents,
lubricants, cleaners, solvents or surfactants on LED.
▶
When installing on the construction site, it should be installed after construction & cleaning.
If the installation site requires construction work, the product is covered with a
curtain and operated 50% white or video for 2 hours every day.
Samsung Electronics
1. Product Information and Precautions for Installation
◇ Caution for cleaning screen
12
- It is recommended to wipe with a soft cleaning cloth provided
with the product. If there is a contamination area that is not
removed well, a small amount of glass detergent of the surfactant
component is sprayed on the cleaning cloth provided. (However,
do not spray the glass detergent directly on the screen)
- Hard stuff on screen surface can damage LED chip and film during
cleaning.
Clear screen surface before cleaning
- Watch out for damage when cleaning gap between HalfCabinets
- Watch out for damage when cleaning gap between Modules
- Do not insert any cleaning tool or spay cleaner directly into
the gap
- Do not wipe the LED surface with hard materials such as
paper towels, brushes comb or brush, acrylic or steel.
- Do not use chemicals such as wax, benzene, cinna, mosquito
repellent, air freshener, lubricant, and detergent in products
★Caution★
Samsung Electronics
1. Product Information and Precautions for Installation
• Preparations for Installation
13
MAGNET JIG
(BN81-17114A)
(-) (+) driver
Absorber
(BN81-17124A) x4
Adjustment tool
(BN81-17112A)
GAP-TOOL
(BN81-17113A)
Glove
(RA00400E-002539)
Hex Wrench
2mm, 6mm
PLIER
(BN81-17541A)
• Provided in Frame Kit. (VG-LFJ08*WW).
• Provided in accessory kit. (CY-WJJPWP).
PROTECTION
(BN81-17111A)
EDGE PROTECTION V/H
(BN81-17514A/BN81-17515A)
• Provided in Frame Kit.
(BN96-48298A)
Cover-PCB
(BN63-18008A)
SCREW-MACHINE
HOLDER-SCREW
(BN61-16452B)
※ Packed in a small zipper bag
M4, L6
M3, L6
Samsung Electronics
2. Check Point about the Radiant Heat
14
Standard and condition for indoor installation
- Standard for using ‘SAMSUNG WALL MOUNT’ (Fulfill ADA)
- Ceiling installation, outdoor installation, cannot be installed where there is vibration
It is not possible to install it in a special case, and it is necessary to consult technical sales
separately.
- In principle, solar window direct radiation condition installation is avoided.
- Window side, adjacent installation
. A weak solar scan of the time zone except for the noon time zone during work is allowed
. If surface temperature rise is minor (1 ~ 2 degrees) allowed
. Use UV blocking / light blocking film when installation of window adjacent is inevitable.
- Room temperature is recommended to be 0 ~ 25 ℃
- Effect of Cold / Hot Wind on Air Conditioning System
. If the cold or hot air is the same air conditioning system, be careful not to affect the product.
- Air temperature measurement position
. Based on product center or air let part
※ ADA(American’s with Disabilities Act
98.6mm
26.1mm
wall
Measuring
location for
ambient
temperature
Measuring
location for
ambient
temperature
※ Written under ‘Full white, (back light 7)’ standard
Written under ‘Video, (back light 10)’ standard
Samsung Electronics
Minimum spacing for buried installation
Min 60mm
Min 60mm
WALL
Min 60mm
Min 60mm
Min 100mm (set ~ floor)
2. Check Point about the Radiant Heat– without Fan
※ Vent and interior finishing work will proceed after screen installation
10
Recommended condition : Min 500mm (set ~ ceiling)
Min 100mm when maintaining the indoor temperature below
25 degrees due to air conditioning operation
Air vent area
Must use mesh with an opening rate of 60% or more
Air vent area
Must use mesh with an opening
rate of 60% or more
※ At least 60mm installation space required for upper,
lower, left, and right
All interior finishes proceed after screen installation
Samsung Electronics
Minimum spacing for buried installation
Air vent area
WALL
Min 100mm (set ~ floor)
11
Recommended condition : Min 500mm (set ~ ceiling)
Min 100mm when maintaining the indoor temperature below 25 degrees due to
air conditioning operation
2. Check Point about the Radiant Heat– without Fan
Samsung Electronics
Min 60mm
WALL
Min 60mm
Example of minimum spacing and placement during landfill installation
left and right sealing
Min 100mm (set ~ floor)
12
Excluding FAN
should be sealed
Air vent area must use mesh with
an opening rate of 60% or more
Air vent area
Must use mesh with an opening
rate of 60% or more
Min 60mm
2. Check Point about the Radiant Heat– with Fan
※ Vent and interior finishing work will proceed after screen installation
Recommended condition : Min 500mm (set ~ ceiling)
Min 100mm when maintaining the indoor temperature below 25 degrees due to
air conditioning operation
Samsung Electronics
WALL
Example of minimum spacing and placement when installing walls
Min 100mm (set ~ floor)
13
2. Check Point about the Radiant Heat– with Fan
※ Vent and interior finishing work will proceed after screen installation
left and right sealing
Excluding FAN
should be sealed
Air vent area must use mesh with an
opening rate of 60% or more
Recommended condition : Min 500mm (set ~ ceiling)
Min 100mm when maintaining the indoor temperature below 25 degrees due to
air conditioning operation
Samsung Electronics
left and right sealing
Example of minimum spacing and placement during rear exhaust
Excluding FAN
should be sealed
The SCREEN wall is managed below 30 ℃ on the back of the wall.
WALL
Min 60mm
Min 100mm (set ~ floor)
14
2. Check Point about the Radiant Heat– with Fan
※ Vent and interior finishing work will proceed after screen installation
Recommended condition : Min 500mm (set ~ ceiling)
Min 100mm when maintaining the indoor temperature below 25 degrees due to
air conditioning operation
Air vent area
Must use mesh with an opening
rate of 60% or more
Samsung Electronics
3. Preparation for Cabinet Installation
• Preparations Before Installation
20
① Remove the Box tape at the upper area and then open up the box. (Fig.2)
② Remove the Top–Cushion and hold the handle inside PE-Bag and pull out the set then remove PE bag.
(Fig.2)
③ Check whether there is any abnormality on the screen by connecting the power cable.(Fig.3)
※ Process of Screen check (Page.21)
Fig.1 Packing & Product
Fig. 2 Remove Al-Bag
Fig.3 Check the Screen
HANDLE
BOX
CUSHION-TOP
CUSHION-BOTTOM
LED-SET
SWITCH
Al-Bag
Samsung Electronics
3. Preparation for Cabinet Installation
④ 18ea Holder-PCB fixing screws and 4 Cover-PCB fixing screws are released.
⑤ Remove the filament tape attached to the top / bottom / left / right.
Fig.4 Holder-PCB & Cover-PCB & Protective Sheet Removal
X18
X4
HOLDER-PCB COVER-PCB
Filament Tape
21
※ Remove Cover-PCB and screws and keep them separately.
It is required when working on the back.
※ The Cover-PCB, Screw, and Bolt are included in the accessory of the Cabinet
SCREW-MACHINE (6003-000133, M4,L8)
SCREW-MACHINE (6003-001501, M3,L6)
Samsung Electronics
3. Preparation for Cabinet Installation
22
⑥ Unfasten the 4 screws on the Cover Corner area to separate those screws and
Remove the protective sheet attached to the two sides (Top/Bottom). (Fig.4)
Fig.4 Cover Corner Removal
SCREW
SCREW-MACHINE (6003-000133, M4L8)
X4
Samsung Electronics
3. Preparation for Cabinet Installation
- Using Spacer-PET
⑦ When Black Seam occurs, remove the Spacer-PET of the point.
※ Spacer-PET should not protrude more than module
⑧ If necessary, attach Spacer-PET. (Fig.5)
※ Check the gap between the module and the Bracket-Sub using a gap gauge.
※ If the step is 0.06mm or more, attach Spacer-PET (0.05t / 0.1t).
23
Step compensation
by attaching GapSheet
Fig.5 Check the difference between the
module and B / SUB
Using Gap gauge
※ Spacer-PET :
- In order to minimize the load applied to the module during large size installation,
Attach it to the Bracket-Sub to minimize the gap between the module and the Bracket-Sub.
- Cabinet 8poiont attached to Spacer-PET
Samsung Electronics
3. Preparation for Cabinet Installation
◈ Dehumidification
24
① In order to protect LED devices, the following items must be dehumidified.
[Dehumidification when Installed]
- If it is installed after more than 6 months in vacuum-packed condition after factory shipment.
- Storage for more than one week should be performed without vacuum treatment.
[Dehumidification during Use]
- Dehumidification is performed in an environment of 40 ℃ / 80% or less for 30 days or more. (Refer to LSM
dehumidification, page 102page)
② How to dehumidify before installation
- Press the button for 3 seconds after the cabinet is turned on.
※ When the initial AC power is turned on, time required for operation of AM3352 IC is required.
Wait about 30 seconds and let it go.
When the button is released, Dehumidifying Mode is executed. (Display the module at the top left)
- Aging with 24 hours on.
3초
Aging 24 hours
SWITCH
※ Caution
♦ The normal installation mode of operating IWJ (LH008IWJMWS, LH012IWJMWS, LH016IWJMWS) is “ STB ” mode (switch).
Please use "O" mode only for cabinet landing inspection and change it to "STB" mode after inspection.
♦ The switch that performs the factory dehumidification mode and factory reset function is the same. If you press 3 seconds, you enter
dehumidification mode. If you press 10 seconds or more, the factory reset is performed.
Samsung Electronics
3. Preparation for Cabinet Installation
◈ Process of Dehumidification
- The Dehumidification process progresses automatically for 24 hours as the brightness increases gradually.
Step condition Brightness Time
1 Lighting up display with 10 gray scale 5% 2 hr
2 Lighting up display with 20 gray scale 8% 2 hr
3 Lighting up display with 30 gray scale 10% 2 hr
4 Lighting up display with 40 gray scale 15% 2 hr
5 Lighting up display with 50 gray scale 20% 2 hr
6 Lighting up display with 70 gray scale 25% 2 hr
7 Lighting up display with 90 gray scale 35% 2 hr
8 Lighting up display with 120 gray scale 45% 2 hr
9 Lighting up display with 150 gray scale 60% 2 hr
10 Lighting up display with 180 gray scale 70% 2 hr
11 Lighting up display with 200 gray scale 80% 2 hr
12 Lighting up display with 255 gray scale 100% 2 hr
Samsung Electronics
3. Preparation for Cabinet Installation
◈ Reference : Process of Screen check
26
화면 검사 사진 확인
Check the picture of the screen
◈ Internal white pattern
1. After turn on power, press the toggle switch button for five seconds
2. Dehumidification screen comes out, push the toggle switch twice
3. when the white screen is displayed, check the defective LED by sequentially pressing toggle switch
* Do not turn on the white pattern over 10 seconds before dehumidification
4. if you need more brighter pattern, push ‘toggle switch’ button for three(3) seconds in white pattern
5. push toggle switch for three(3) seconds again to exit factory OSD
POWER INLET
POWER OUTLET
SWITCH
TOGGLE SWITCH
TOGGLE SWITCH
Samsung Electronics
4. Frame Installation
27
◇ Frame Kit Composition.
ⓐ
ⓑ
ⓒⓑ
ⓓ
ⓗ
M5,L65
ⓔ
ⓘ
ⓙ
ⓕ
ⓖ
ⓚ
ⓛ
ⓜ
1x1 2x2 3x3 4x4
Units Units Units Units
ⓐ
BRACKET H (horizontal)
2 2 2 6
ⓑ
BRACKET SIDE (vertical)
2 2 2 2
ⓒ BRACKET MIDDLE (vertical) - 2 3 4
ⓓ JOINT H 2 2 2 3
ⓔ JOINT V 2 4 6 8
ⓕ BRACKET JIG 1 1 1 1
ⓖ LEVELER - 2 2 2
ⓗ SCREW 4 6 6 15
ⓘ
Anchor
4 6 6 15
ⓙ
DRY WALL SCREW
4 6 6 15
ⓚ
MANUAL-INSTALL
1 1 1 1
ⓛ
ALIGN JIG
- - 1 1
ⓜ
LEVEL
- 1 1 2
ⓝ
HOLDER PCB
15 30 45 60
Installation Screen Size (mm)
806.4x453.6
Samsung Electronics
4. Frame Installation
① Assemble Bracket Side/Middle with Bracket H.
- First insert ⓐBracket H to assembled Joint H and Bracket H. (Fig.1)
- Second put 3 groups of Bracket H on ground. And insert Bracket Side/Middle to Bracket H. (Fig.2)
. ⓑ Bracket Side used at side position, ⓒ Bracket Middle used at middle position.
- Then fasten up the screws. (Fig.3)
28
Fig.1 Insert Bracket H
Fig.2 Insert Bracket V to Bracket H
Fig.3 Fix Bracket with screw
M4L8
M6L8
ⓐ
ⓑ,ⓒ
ⓑ
ⓒ
ⓐ
ⓐ
Samsung Electronics
4. Frame Installation
② Assemble Leveler on the Bracket Side at required height position.
- Put Leveler on Bracket side at required height position with moving up and down. (Fig.1)
29
Fig.1 Assemble Leveler
M4L8 Screw