Samsung E316 Test Command Test Procedure

4. SGH-E316 Test Command & Test Procedure
1. Calibration Equipment
-HP8960
- DC Power Supply
-TestJig
RF
DC POWER SUPPLY
GPIB
+ --
TEST JIG
HP8960
P C
GPIB
2. Calibration Program
- Samsung internal software
SAMSUNG Proprietary-Contents may change without notice
This Document can not be used without Samsung's authorization
Serial
4-1
Serial
SGH-E316 Test Command & Test Procedure
3. Tx Power Tune up Procedure
1) Procedure: a. Calibraion equipment HP8960 and the cell phone are connected through
RF cable.
b. Target power ( required power level according to the specification which
should be set by calibration program) is set to equipment as power level
(ex: GSM 5 level is 32.5 dBm). c. Activate phone in Tx_Mode_Only. d. HP8960 equipment measures transmitted power through rf test cable from
the phone and reports measured level to calibration program. e. The program compares measured power with the target power. f. The calibration program decides power code which is defined in advance
in the program and writes the codes to the flash memory in the phone.
2) Target value is defined according to the value of GSM specification. See the TX power level definition table below.
3) Target values of the peak level of the phone are set normally in conducted
mode
GSM 5 level : 32.5dBm
- PCS 0 level : 29.5dBm (Tolerance : -2dB ~ +1dB )
4) Accuracy All the TX level from the phone after tuned-up satisfy the GSM specification
5) TX ramp mask specification applied to the calibration program:
4-2
SAMSUNG Proprietary-Contents may change without notice
This Document can not be used without Samsung's authorization