SAMSON SPLICING INSTRUCTIONS
16-Strand Class I Eye Splice
Class I 16-strand ropes are made from any or all of the following bers: olen, polyester, or nylon.
The eye splice is used to place a permanent loop in the end of a rope, generally for attachment
purposes to a xed point. An eye is also used to form the rope around a thimble, which is used to
protect the rope, especially when it is to be attached to a shackle, chain, or wire rope.
MEASURING AND MARKING
step
1
step
2
Measure 28 inches from end
1A
of rope and make Mark A.
Form desired size of eye and make
1b
Mark B opposite Mark A.
Measure 22 inches down from
1c
Mark B and make Mark C.
MARKING COVER TAPER
From Mark A count 5 strand pairs toward the end
2A
of rope and mark the 5th pair (left and right strands.)
Continue counting down 5 pairs and marking the
2b
5th pair until a total of 5 strand pairs are marked.
Mark D
Measure 11 inches down from
1D
Mark C and make Mark D.
11"
Mark C
28"
Bitter end
22"
TIP:
For this rope a wire d is
easier to use than a tubular d.
Tie a knot in body of the rope
1E
about 11 inches down from Mark D.
Mark B
1 2 3 4 5
step
3
step
4
REMOVING THE CORE
Carefully open up the braid at Mark C
and pull out the core yarns from the end
of the rope back to Mark C.
TAPERING END OF ROPE
Remove d. Pull hard on tapered tail with one hand. With the other hand,
smooth bunched line towards eye splice until Marks 2 and 3 converge.
Pull out marked strand pairs from cover braid.
4A
Do not cut
Tape end of cover tail and attach thin wire d
4b
to tapered end of rope with a thin layer of tape.
Wire fid
Mark D
Mark D
Mark C Mark B
Core yarn
Mark C
PAGE 1 OF 3
SamsonRope.com | Email CustServ@SamsonRope.com | Tel +1.360.384.4669
SAMSON SPLICING INSTRUCTIONS
16-Strand Class I Eye Splice
step
5
PERFORMING SPLICE
Insert d into rope at Mark B and
5A
out at Mark D.
Pull tail through body of rope from
5b
B to D.
As each marked strand pair is about to
5c
be buried in the rope at Mark B, carefully
cut each strand in the marked pair.
5D
Continue to pull the tail end of the rope
through until Mark A and Mark B coincide.
Emerging
wire fid
Mark D
Mark C
Mark D
Mark C
Cut as strand
pairs are
about to
be buried
MARKING TAILS
6
step
6A
6b
6c
SamsonRope.com | Email CustServ@SamsonRope.com | Tel +1.360.384.4669
Smooth rope from eye at Mark B, back to
Mark D to remove all slack in the braid.
Smooth rope from knot to Mark C to bury
as much of the core yarns as possible.
Mark both cover tail and core yarns where
they exit from the body of the rope.
Mark D
tail
Mark C
Mark tail and
core strands
where they exit
rope
core yarns
PAGE 2 OF 3