These instructions are applicable to the SALUS Controls model stated on the front
cover of this manual only, and must not be used with any other make or model.
This accessory must be tted by a competent person, and installation must
comply with the guidance provided in the current IEE Wiring Regulations and
current Building Regulations. Failure to comply with the requirements of these
publications could lead to prosecution.
Always isolate the AC Mains supply before installing or working
on any components that require 230 VAC 50Hz supply.
When tting batteries, do not mix old and new batteries together.
Do not use rechargeable batteries.
Please leave these instructions with the end user where they should be kept in
a safe place for future reference.
02iT500BM Installer Manual
2. Installation of the boiler module
RXVBC605
Page 03 - 05
RXWBC605
Page 06 - 09
RXBC605
Page 10 - 11
INTRODUCTION
The RXVBC605 is an integral plug-in RF boiler control. The RF boiler control is a direct
replacement for the basic time clock or blanking plate usually supplied with the boiler.
Installing the RF boiler control takes minutes. Once installed, you will benet from all
the control features of the Salus room thermostat.
INTEGRAL RF BOILER CONTROL
The Integral RF boiler control is the RF receiving unit for your RF room thermostat. This
unit uses a plug-in connection to connect directly to your boiler and provides the ON/OFF
switching.
Features
• LED status indication
• Plug-in connection to boiler
• 3 position switch
• 868 MHz communication
Mounting the RF Integral Boiler Control to the boiler
DANGER!
• 24V & 230V: Do not touch electrical components or circuits
• Isolate mains electricity supply before starting any
work and observe all relevant safety precautions
• Follow electro static discharge precaution
• Do not touch any visible PCB parts or components
iT500BM Installer Manual 03
2. Installation of the boiler module RXVBC605
RXVBC605 RECEIVER
For ECOTEC post April 2012 remove and discard pins.
For ECOTEC models prior to
April 2012, use as supplied.
1. Switch o the boiler at its main supply.
2. Remove cover panel or existing control.
3. Insert the integral boiler control ensuring correct location
of the rear connection pins.
04iT500BM Installer Manual
2. Installation of the boiler module RXVBC605
Before switching the boiler on at its mains
supply, ensure the module switch is in the
OFF position.
To ensure the boiler control is connected
properly, please now move the switch to
ON . The boiler should now go on and
the LED on the your boiler control should
illuminate.
Now move the switch back to AUTO .
iT500BM Installer Manual 05
2. Installation of the boiler module RXWBC605
RXWBC605 RECEIVER
INTRODUCTION
The RXWBC605 comprises of an integral plug-in RF boiler control. The RF boiler
control is a direct replacement for the basic time clock or blanking plate usually
supplied with the boiler. Installing the RF boiler control takes minutes. Once
installed, you will benet from all the control features of the Salus thermostat.
INTEGRAL RF BOILER CONTROL
The Integral RF boiler control is the RF receiving unit for your thermostat.
This unit uses a plug-in connection to connect directly to your boiler and provides
the ON/OFF switching.
Features
• LED status indication
• Plug-in connection to boiler
• 3 position switch
• 868 MHz communication
Mounting the RF Integral Boiler Control to the boiler
DANGER!
• 24V & 230V: Do not touch electrical components or circuits
• Isolate mains electricity supply before starting any
work and observe all relevant safety precautions
• Follow electro static discharge precaution
• Do not touch any visible PCB parts or components
06iT500BM Installer Manual
2. Installation of the boiler module RXWBC605
RXWBC605 RECEIVER
RF Transmission
The receiving range between your thermostat and the RF Boiler Control is around
100 metres in open air, however many factors can aect the RF transmission
and shorten the operating distance, e.g. shielding by thick walls, foil back
plasterboard, metal objects such as ling cabinets, general RF interference, and
so on. The operating range is generally around 30 metres, which is large enough
for most household applications.
A
B
1. Switch o the boiler at its main supply.
Remove the outer casing and front fascia to
allow access to the main control panel.
2. Remove cover panel A upwards to remove.
3. Pull top tab B upwards, then outwards to
remove blanking plate or existing control.
C
First plug in the connector block C ensuring
correct orientation. Remember to ensure
the block is fully connected.
iT500BM Installer Manual 07
2. Installation of the boiler module RXWBC605
RXWBC605 RECEIVER
A
Now locate the boiler control’s four hooks then
press in and down. Replace cover panel A.
Replace the front fascia and boiler’s outer casing.
08iT500BM Installer Manual
Before switching the boiler on at its mains supply,
ensure the module switch is in the OFF position .
2. Installation of the boiler module RXWBC605
RXWBC605 RECEIVER
To ensure the boiler control is connected
properly, please now move the switch to
ON . The boiler should now re and the LED
on the your boiler control should illuminate.
Now move the switch back to AUTO .
iT500BM Installer Manual 09
2. Installation of the boiler module RXBC605
RXBC605 RECEIVER
INTRODUCTION
The RXBC605 comprises of an integral plug-in RF boiler control. The RF boiler
control is a direct replacement for the basic time clock or blanking plate usually
supplied with the boiler. Installing the RF boiler control takes minutes. Once
installed, you will benet from all the control features of the Salus thermostat.
INTEGRAL RF BOILER CONTROL
The Integral RF boiler control is the RF receiving unit for your thermostat. This
unit uses a plug-in connection to connect directly to your boiler and provides the
ON/OFF switching.
Features
• LED status indication
• Plug-in connection to boiler
• 3 position switch
• 868 MHz communication
DANGER!
Always isolate the AC Mains supply
before opening or removing the unit
from the boiler.
10iT500BM Installer Manual
2. Installation of the boiler module RXBC605
RXBC605 RECEIVER
INSTALLING THE RF BOILER CONTROL
1. Remove the front panel from the boiler.
2. Pull out the mechanical timer.
3. Do not remove boiler loop.
4. Connect the electrical plug.
5. Push t boiler control into housing.
6. Replace the front panel ensuring a good seal is made.
7. Power up the boiler and check the correct operation.
Connections:
1 - Neutral input
2 - Live input
3 - Common input
4 - Normally open output
iT500BM Installer Manual 11