SaltDogg WB400 User Manual

TM
PER SIDE
Assembly Instructions
WB400
Walk Behind Drop Salt Spreader
Tools Needed For Assembly
• (2) 7/16 Wrenches
• (2) 1/2 Wrenches
• (1) 5/32 Allen key
9049 Tyler Blvd. • Mentor, Ohio 44060
Phone (440) 974-8888 • Fax (440) 974-0165
Toll-Free Fax 800-841-8003 • saltdogg.com
Assembly
Attaching the supports, and Hopper. (see fig. 1)
1. Remove contents from box and place the preassembled portion of the spreader upright on its wheels
2. Assemble left hand support arm (3016744) & line up the holes, fasten with (3) 3/8-16 bolts, washers, lock washers, and nylock nuts. Threads of bolts should face away from wheels. Tighten fasteners.
3. Assemble left hand support arm (3016745) & line up the holes, fasten with (3) 3/8-16 bolts, washers, lock washers, and nylock nuts. Threads of bolts should face away from wheel. Tighten fasteners.
Fig. 1
HOPPER ASSEMBLY
Attaching the Linkage Rod (see fig. 2)
1. Insert the 90 degree end of the linkage rod in the holes located in the lower middle of the hopper frame. The rod will remain loose until the handles are attached.
ROD (3 016748)
Fig. 2
3016744
LH SUPPORT
3016745 RH SUPPORT
3 BOLTS
INSERT INTO HOLES AS SHOWN
1
TM
Attach Handle Assembly (see fig 3)
1. Assemble handle assemble to support arms by inserting handle tubes located under handle housing, into support tubes. At the same time insert the linkage rod into the hole provided at the top of the handle assembly. With the rod handle (3016760) inserted onto rod.
2. Align holes on handle assembly with holes in support tubes and fasten with ¼-20 bolts, washers, and nylock nuts.
3. Use (4) ¼-20 x 1.5” bolts on the triangular face of the handle assembly. And use (2) ¼-20 x 2.50” on the handle portion.
4. Tighten all fasteners.
Fig. 3
1/4-20x1.5" BOLTS.
1/4-20"X2.50" BOLTS
Operation
1. Before filling Hopper, ensure that the flow gate is fully closed by rotating the rod lever to the right (counter clockwise).
2. Ensure screen is in hopper.
3. Fill hopper with product.
4. Begin moving forward with the spreader.
5. Rotate the rod handle to open flow gate and
allow material to flow. (finding the right location for the flow gate will depend on material used, and use preference.)
5. Before stopping, rotate the rod handle to the left to close the flow gate.
Maintenance
1. The Hopper should be completely emptied and cleaned before storage.
2. The Spreader should be washed and dried before storage.
3. Check that the flow gate and Linkage move freely. Clear out any debris between the Augers & the Hopper.
4. Check torque of all fasteners on a monthly basis.
5. Never leave salt in hopper. the will harden and
will be difficult to remove.
ROD LEVER
Final Assembly
1. Check And Tighten All Fasteners
2. Place the Screen in the hopper.
3. Place grips on handles.
4. Install the Rain Cover on the hopper.
Operation Notes:
1. The spreader is designed to be operated at a brisk walking pace (approx. 3 mph). Walking slower or faster will alter the distribution pattern and amount of the material, as will the moisture content of the material & other environmental factors.
2. Grease may be applied to the wheel axles, and moving parts as desired.
WARNING
When filling hopper, make certain there are no large objects within the material. Objects larger than the openings in the Screen may cause the spreader to clog or even damage the drive system. Never leave material in the hopper when not in use.
2
Loading...
+ 2 hidden pages