TM
Phone (440) 974-8888 • Fax (440) 974-0165
Toll-Free Fax 800-841-8003 • saltdogg.com
Installation & Operator’s Manual
LS5 Liquid Spray System 2 x 105 Gallon Tanks
9049 Tyler Blvd. • Mentor, Ohio 44060
Installation Instructions
1. Position pump enclosure bracket
(#3028485) 4” from rear gusset on driver side
of hopper spreader, (see fig. 1). Make sure
bracket is rested on hopper’s sill.
2. Weld pump enclosure bracket (#3014084)
in place as shown in fig.1.
3. Position reservoir brackets (#3010977),
gussets (#3011128) and bracket tie downs
(#3011124) as shown in fig.2. Weld all parts in
place as shown in fig.2 and fig.1 on both sides
of spreader.
4. Place reservoirs (#3010816) on brackets
and secure them using retainers (#3010979) as
shown in fig.3.
5. Use three (#1496505) (see fig. 3) 1-3/4”
x 5” ratchet tie downs to secure each
reser voir.
6. Plumb: Reservoir, ball valve, filter, pump
enclosure, and spray nozzles according to
plumbing schematic using supplied fittings,
hose, and hose clamps. Do not use Teflon
tape on threads. Use liquid thread sealant.
(see fig. 5, 6, & 7).
7. Two 11/16” diameter holes are predrilled in
the chute guide (#3010180) for installation of
two liquid spray nozzles, see fig.3. Installation
on different brands of spreaders may require
different nozzle locations.
—continued inside
1
9049 Tyler Blvd. • Mentor, Ohio 44060
TM
4" FROM GUSSET
Phone (440) 974-8888 • Fax (440) 974-0165
Toll-Free Fax 800-841-8003 • saltdogg.com
3028485
WELD ALL AROUND
BRACKETS AND GUSSETS
3011128
WELD ALL AROUND
BRACKET, TIE DOWNS
3010977
WELD BOTH SIDES
Fig. 1
WELD ALL AROUND
BRACKET, TIE DOWN
6.75
1.75
26.0
19.0
26.0
Fig. 2
2
9049 Tyler Blvd. • Mentor, Ohio 44060
TM
Fig. 3
Phone (440) 974-8888 • Fax (440) 974-0165
Toll-Free Fax 800-841-8003 • saltdogg.com
Fig. 4
LS5 can be adapted for Buyers'
4 and 4.5 cubic yard spreaders.
Cab Controller Installation
Instructions (Fig. 5)
1. Install cab controller (#WSE1) in cab for convenient
driver operation. Mounting bracket and fasteners
included.
2.
Route 8' wire harness (#WSE24) under dash from
controller (#WSE1) to truck’s fuse panel.
3. Ground “black” wire from controller to truck frame
or truck’s battery (not dash).
4. Attach “green” wire in 8' wire harness (#WSE24) to
a fused and keyed 15 Amp hot wire circuit.
5. Connect main power “white” wire in 8' wire harness (#WSE24) to fuse box that is “hot” full time or to
battery “positive”.
6. Route the 25' wire harness (#WSE25) from the
rear of the spreader to the cab. Plug connector on
controller (#WSE1) to the connector on pump harness
(#WSE25).
3010816
25' Cable Connector
3010979
Fig. 5 WSE1 Cab Controller front view
WSE25
1496505
Connector
3010180
WSE24
8' Cable
Fig. 5 WSE1 Cab Controller back view
3