SALSBURY INDUSTRIES
1010 East 62nd Street, Los Angeles, CA 90001-1598
See Through Lockers – S-63000 Series
Triple Tier Installation Instructions
Thank you for selecting Salsbury’s see through triple tier lockers. These instructions are intended to assist you in assembling the lockers. Assembly of the various locker components will
be with #10 - 24 x 3/8” long slot less screws and #10 nuts (provided). Loosely fasten a screw and a nut into every set of mating holes with the screw heads positioned on the outside of
the locker or on the exposed surface.
One Wide Locker Assembly
Step 1: Attach the top shelf, bottom shelf, and three coat hooks to the back panel.
Step 3: Attach the second side panel and the right rear leg to the assembly of Step 2.
Attach an additional three coat hooks to the second side panel. The locker chassis is
now complete.
Step 2: Turn the back panel on its back with the shelves pointing upward. Attach the
first side panel, the left rear leg, and two compartment dividers to the assembly from
Step 1. Attach an additional three coat hooks to the first side panel.
Step 4: Attach the pre-assembled door frame onto the assembly of Step 3.
Step 5: Tighten all fasteners checking for squareness of the locker while tightening.
Attach optional sloping hood, end bases or front base (see pages 4 and 5).
Step 6: Place the locker in the installed location and anchor to the floor, wall, or to
both. Individual job conditions will dictate the type of fastening anchors to use (not
provided).
Step 7: Fasten all lockers in a row together by installing fasteners provided through
the side panels. Installation is now complete.
Phone: 1-800-562-5377 Int’l Phone: 323-846-6700
Fax: 1-800-562-5399 Int’l Fax: 323-846-6800
www.lockers.com engineering@lockers.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2014 Salsbury Industries. All rights reserved. Page 1 of 5 3/27/14
SALSBURY INDUSTRIES
1010 East 62nd Street, Los Angeles, CA 90001-1598
See Through Lockers – S-63000 Series
Triple Tier Installation Instructions
Three Wide Locker Assembly
Step 1: Attach a top shelf, a bottom shelf, and three coat hooks to a back panel.
Step 3: Attach the second top shelf, the second bottom shelf, and an additional three
coat hooks to the second back panel as in step 1.
Step 4: Simultaneously attach the assembly of Step 3 (second Step 1 assembly), the
second side panel, and two additional compartment dividers to the assembly of Step 2.
Attach three coat hooks to each side of the second side panel.
Step 2: Turn the back panel on its back with the shelves pointing upward. Attach the
first side panel, the left rear leg, and two compartment dividers to the assembly from
Step 1. Attach an additional three coat hooks to the first side panel.
Step 5: Attach the third top shelf, the third bottom shelf, and an additional three coat
hooks to the third back panel as in steps 1 and 3.
Step 6: Simultaneously attach the assembly of Step 5 (third Step 1 assembly), the
third side panel, and two additional compartment dividers to the assembly of Step 4.
Attach three coat hooks to each side of the third side panel.
Phone: 1-800-562-5377 Int’l Phone: 323-846-6700
Fax: 1-800-562-5399 Int’l Fax: 323-846-6800
www.lockers.com engineering@lockers.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2014 Salsbury Industries. All rights reserved. Page 2 of 5 3/27/14