Salsbury Industries 66000 User Manual

Box Style Bridge Lockers – 66000 Series

Installation Instructions

Thank you for selecting Salsbury’s box style bridge lockers. We are confident that the quality and construction of the lockers will prove to be a good investment. These instructions are intended to assist you in a typical anchored locker installation. Individual job conditions will dictate the type of anchor fasteners and whether the lockers must be anchored to the wall, the floor, or both.

Typical Assembly of End Units

Notes

When lockers are set in place, care must be taken to assure lockers are set plumb and true before anchoring.
Lockers are not designed as freestanding structures. Lockers must be anchored securely to walls and/or floors with fasteners. The anchoring fasteners are not provided. Choose appropriate hardware for the installation conditions. WARNING: Failure to properly anchor lockers could cause them to topple.
Adjust all doors to operate freely if required. If built-in locks are installed, make certain locks operate properly
before closing doors.

Assembly of Box Style Bridge Locker End Units

Lay down the back panel with the flanges facing up and the two closer leg mounting holes at the bottom. Loosely attach the leg to the inside of the back panel flange, with the wider leg flange against the back of the back panel, using two bolts and nuts. Loosely attach the second leg to the opposite side of the back panel in the same manner.
Attach one side panel to the outside of the flange of the back panel. The back panel flange should be between the side panel and the leg installed in the paragraph above. Align the holes and secure with bolts and nuts.
Bolt the top and the bottom to the side panel. Make certain that their fronts are in the correct position. Secure the second side panel to the unit. Bolt the shelves to the sides.
Place the doorframe over the assembled locker and fasten. Make certain that the sides are inside the doorframe.
Carefully raise the locker to an upright position. Square and level the cabinet, then tighten all nuts and bolts.
SALSBURY INDUSTRIES
1010 East 62nd Street, Los Angeles, CA 90001-1598
Phone: 1-800-562-5377 Int’l Phone: 323-846-6700
Fax: 1-800-562-5399 Int’l Fax: 323-846-6800
www.lockers.com engineering
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2010 Salsbury Industries. All rights reserved. (Rev. 01, 8/25/2010)
@lockers.com

Assembly of Bridge Unit

Final Assembly of Box Style Bridge Locker

Final Assembly of Box Style Bridge Locker

Lay the two end units on their backs. See illustration above. Position the bridge unit between the tops of the two end units. Use the screws holding the tops and first shelves to fasten the bridge unit to the two end units.
Place the rod holder brackets over the ends of the rod as shown in the illustration. Fasten the brackets to the side walls of the end units using the holes provided.
Finally, stand the assembled box style bridge locker upright.

Assembly of Bridge Unit

Lay down the bridge back panel with the flanges facing up. See illustrations above. Install the three uprights. Install four tops at the top and four shelves at the bottom. Install the bridge doorframe, ensuring that its frame fits outside the edges of the tops and shelves.
Raise the bridge to an upright position. Square and level the unit, then tighten all nuts and bolts.
SALSBURY INDUSTRIES
1010 East 62nd Street, Los Angeles, CA 90001-1598
Phone: 1-800-562-5377 Int’l Phone: 323-846-6700
Fax: 1-800-562-5399 Int’l Fax: 323-846-6800
www.lockers.com engineering
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2010 Salsbury Industries. All rights reserved. (Rev. 01, 8/25/2010)
@lockers.com
Loading...
+ 1 hidden pages