Newspaper Holder on Pedestal Installation Instructions
U.S.P.S. APPROVED
Thank you for selecting Salsbury’s 4325D designer roads ide mailbox. This instruction sheet is for installing the 43 25D mailbox along with a 4315 news paper holder
on a pedestal. Other installation instructions are available for i nstalling the m ailbox on a pedestal, or on a deluxe mailbox post, installi ng the mailbox on s preaders,
and installing the pedestal in a concrete footing.
When you install a curbside or roadside mailbox, make sure that it is easily accessible to the mail carrier. By regulation a locked mailbox should be 41” to 45” from
the ground or street surface up to the point of mail entry. The door should be set back 6” to 8” back from the front face of the curb or the road edge. However, you
should check with your local postmaster to ensure that the mailbox is installed according to local regulations. It is important to note that it is not the responsibility of
mail carriers to open mailboxes that are locked, accept keys for this purpose, or lock mailboxes after delivery of the mail.
Newspaper Holder to Pedestal Installation
Install four (4) 5/16”-18 x 2” long pan head bolts provided with the pedestal
through the four (4) square holes shown in the inside floor of the news paper
holder and through the four (4) tapped holes on th e top plate of the pedes tal.
Insert a Phillips head screw driver through each squ are hole directly above,
and in the top of the newspaper holder, to tighten the pan head bolts.
Mailbox Installation on a Newspaper Holder and Pedestal
All hardware to attach the mailbox to the newspaper holder is includ ed with
the newspaper holder. To attach the mailbox to the n ews paper hold er, unlock
and open the front door or rear door of the mailbox and inst all four (4) 5/16”18 X 3/4” long carriage bolts into (4) square holes in t he floor of the mailbox
and through the four (4) square holes shown on the top of the news paper
holder. Install 5/16” flat washers and 5/ 16”-18 hex nuts on the ends of the
four (4) bolts protruding below the top of the newspaper holder. Cover the
hex nuts with cap plugs. Installation is complete. Additional hardware
provided is not needed and may be discarded.
SALSBURY INDUSTRIES
1010 East 62nd Street, Los Angeles, CA 90001-1598
Phone: 1-800-624-5269 Int’l Phone: 323-846-6700
Fax: 1-800-624-5299 Int’l Fax: 323-846-6800
www.mailboxes.com engineering
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Installing Newspaper Holders on Deluxe Mailbox
Posts
Thank you for selecting Salsbury’s 4325D designer roadside mailbox.
This instruction sheet is for installing the 4325D mailbox along with a 4315
newspaper holder on a deluxe mailbox post. Other install ation instructions
are available for installing the mailbox on a pedestal , or on a deluxe mailbox
post, installing the mailbox on spreaders, and installing the pedestal in a
concrete footing.
When you install a curbside or roadside mailbox , make sure that it is easily
accessible to the mail carrier. By regulation a locked mailbox shoul d be 41”
to 45” from the ground or street sur face up to the point of mail entry. The
door should be set back 6” to 8” back from the front face of the curb or the
road edge. However, you should check with your l ocal postm aster to ens ure
that the mailbox is installed accordin g to local regulations. It is i mportant to
note that it is not the responsibility of mail carriers to open ma ilbox es that are
locked, accept keys for this purpose, or lock mailboxes after delivery of the
mail.
Newspaper Holder Installation to Deluxe Post
Installation of newspaper holders to each deluxe po st, 4870 one-sided, or
4872, is the same. Attach one newspaper holder to the 4870 one-s ided
post. Attach one additional newspaper holder to the 4872 two-si ded post.
All hardware required to assemble the newspaper holders(s) to the deluxe
mailbox post is provided with the post. To a ttach a newspaper h older to the
post, install four (4) 5/16”-18 x 2” long pan head bolts through the four (4)
square holes shown in the inside fl oor of the newspaper holder and through
the four (4) tapped holes in the arm of the deluxe mai lbox post. Repeat
these steps for the other newspaper holder(s).
Mailbox Installation to Newspaper Holders
Installation of the mailbox to the newspaper holder on each deluxe post,
4870 one-sided, or 4872 two-sided, is the same. Attach one mailbox to the
4870 one-sided post. Attach one addit ional mailbox to the 4872 two-sided
post. All hardware to attach the mailbox(es) to t he newspaper holder(s) is
included with the newspaper holder(s). To attach a mailbox to a news paper
holder, open the front door or rear door of the mailbox and install four (4)
5/16”-18 X 3/4” long carriage bolts into (4) square hol es in the floor of the
mailbox and through the four (4) square holes shown on the top of the
newspaper holder. Install 5/16” flat washers and 5/16” -18 hex nuts on the
ends of the four (4) bolts protruding below the top of the newspa per holder.
Cover the hex nuts with cap plugs. Repeat these steps for the other
mailbox(es). Installation is now complete. Additi onal hardware provided is
not needed and may be discarded.
U.S.P.S. APPROVED
Note: On the 4370 deluxe mailbox post, the longer mounting arm which
accommodates the newspaper holder and mail box can be on either the left
or right side. When attaching the post to the ground, position the post s o the
longer mounting arm is on the side desired. T hen mount the newspaper
holder and mailbox on the mounting arm wi th the mail box facing t he str ee t or
roadway.
SALSBURY INDUSTRIES
1010 East 62nd Street, Los Angeles, CA 90001-1598
Phone: 1-800-624-5269 Int’l Phone: 323-846-6700
Fax: 1-800-624-5299 Int’l Fax: 323-846-6800
www.mailboxes.com engineering
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Installing Mailboxes on 2-Wide Spreader with
Newspaper Holders on a Pedestal
Thank you for selecting Salsbury’s 4325D designer roadside mailbox.
This instruction sheet is for installing 4325D mailboxes on a 2-wide spreader
with 4315D designer newspaper holders and a pedestal. A different
instruction sheet is available for installing 4325D mailboxes on a 3-wide or 4wide spreader with 4315D newspaper holders and a pedestal. Other
installation instructions are available for installing the mailbox on a pedestal,
or on a deluxe mailbox post, installing the mailbox on a spreader, and
installing the pedestal in a concrete footing.
When you install a curbside or roadside mailbox, make sure that it is easily
accessible to the mail carrier. By regulation a locked mailbox should be 41”
to 45” from the ground or street surface up to the point of mail entry. The
door should be set back 6” to 8” back from the front face of the curb or the
road edge. However, you should check with your local postmaster to ensure
that the mailbox is installed according to local regulations. It is important to
note that it is not the responsibility of mail carriers to open mailboxes that are
locked, accept keys for this purpose, or lock mailboxes after delivery of the
mail.
Spreader Installation to Pedestal
All hardware to attach the spreader to the pedestal is included with the
spreader. To attach the spreader to the pedestal, install four (4) 5/16”-18 X
1” long hex flange head bolts through the four (4) center square holes of the
spreader and through the four (4) tapped holes on the top plate of the
pedestal. Cover the hex flange head bolts with cap plugs.
U.S.P.S. APPROVED
Newspaper Holders Installation to Pedestal
All hardware to attach the newspaper holders to the spreader is included with
the spreader. To attach a newspaper holder to the spreader, install four (4)
5/16”-18 x 1-3/4” long carriage bolts through the four (4) square holes in the
inside floor of the newspaper holder and through the four (4) corresponding
holes on the spreader. Install 5/16” flat washers and 5/16”-18 hex nuts on
the ends of the four (4) bolts protruding below the bottom of the spreader.
Repeat these steps for the other newspaper holder.
Mailbox Installation to Newspaper Holders
All hardware to attach the mailboxes to the newspaper holders is included
with the newspaper holders. To attach a mailbox to a newspaper holder,
install four (4) 5/16”-18 X 3/4” long carriage bolts into (4) square holes in the
floor of the mailbox and through the four (4) square holes on the top of the
newspaper holder. Install 5/16” flat washers and 5/16”-18 hex nuts on the
ends of the four (4) bolts protruding below the top of the newspaper holder.
Cover the hex nuts with cap plugs. Repeat these steps for the other mailbox.
Installation is now complete. Additional hardware provided is not needed
and may be discarded.
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Installing Mailboxes on 3-Wide Spreader with
Newspaper Holders on Pedestal
Thank you for selecting Salsbury’s 4325D designer roadside mailbox.
This instruction sheet is for installing 4325D mailboxes on a 3-wide spreader
with 4315D designer newspaper holders and a pedestal. A different
instruction sheet is available for installing 4325D mailboxes on a 2-wide or 4wide spreader with 4315D newspaper holders and a pedestal. Other
installation instructions are available for installing the mailbox on a pedestal,
or on a deluxe mailbox post, installing the mailbox on a spreader, and
installing the pedestal in a concrete footing.
When you install a curbside or roadside mailbox, make sure that it is easily
accessible to the mail carrier. By regulation a locked mailbox should be 41”
to 45” from the ground or street surface up to the point of mail entry. The
door should be set back 6” to 8” back from the front face of the curb or the
road edge. However, you should check with your local postmaster to ensure
that the mailbox is installed according to local regulations. It is important to
note that it is not the responsibility of mail carriers to open mailboxes that are
locked, accept keys for this purpose, or lock mailboxes after delivery of the
mail.
Spreader and Newspaper Holders Installation to
Pedestal
Attaching the spreader to the pedestal requires simultaneously attaching the
center newspaper holder to the spreader and to the pedestal. Start by
installing four (4) 5/16”-18 x 2” long pan head bolts provided with the
pedestal through the four (4) square holes in the inside floor of the center
newspaper holder, through the four (4) center square holes in top of the
spreader, and through the four (4) tapped holes on the top plate of the
pedestal. Insert a Phillips head screw driver through each square hole
directly above, and in the top of the newspaper holder, to tighten the pan
head bolts.
All hardware to attach the remaining two newspaper holders to the spreader
is included with the spreader. To attach an additional newspaper holder,
install four (4) 5/16”-18 x 1-3/4” long carriage bolts through the four (4)
square holes in the inside floor of the newspaper holder and through the four
(4) corresponding square holes in top of the spreader. Install 5/16” flat washers and 5/16”-18 hex nuts on the ends of the four (4) bolts protruding
below the bottom of the spreader. Repeat these steps for the remaining
newspaper holder.
U.S.P.S. APPROVED
Mailbox Installation to Newspaper Holders
All hardware to attach the mailboxes to the newspaper holders is included
with the newspaper holders. To attach a mailbox to a newspaper holder,
install four (4) 5/16”-18 X 3/4” long carriage bolts into (4) square holes in the
floor of the mailbox and through the four (4) square holes on the top of the
newspaper holder. Install 5/16” flat washers and 5/16”-18 hex nuts on the
ends of the four (4) bolts protruding below the top of the newspaper holder.
Cover the hex nuts with cap plugs. Repeat these steps for the other
mailboxes. Installation is now complete. Additional hardware provided is not
needed and may be discarded.
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Installing Mailboxes on 4-Wide Spreader with Newspaper
Holders on a Pedestal
Thank you for selecting Salsbury’s 4325D designer roadside mailbox.
This instruction sheet is for installing 4325D mailboxes on a 4-wide spreader with
4315D designer newspaper holders and a pedestal. A different instruction sheet is
available for installing 4325D mailboxes on a 2-wide or 3-wide spreader with 4315D
newspaper holders and a pedestal. Other installation instructions are available for
installing the mailbox on a pedestal, or on a deluxe mailbox post, installing the mailbox
on a spreader, and installing the pedestal in a concrete footing.
When you install a curbside or roadside mailbox, make sure that it is easily accessible
to the mail carrier. By regulation a locked mailbox should be 41” to 45” from the
ground or street surface up to the point of mail entry. The door should be set back 6”
to 8” back from the front face of the curb or the road edge. However, you should
check with your local postmaster to ensure that the mailbox is installed according to
local regulations. It is important to note that it is not the responsibility of mail carriers
to open mailboxes that are locked, accept keys for this purpose, or lock mailboxes
after delivery of the mail.
Spreader Installation to Pedestal
All hardware to attach the spreader to the pedestal is included with the spreader. To
attach the spreader to the pedestal, install four (4) 5/16”-18 X 1” long hex flange head
bolts through the four (4) center square holes of the spreader and through the four (4)
tapped holes on the top plate of the pedestal. Cover the hex flange head bolts with
cap plugs.
Next install a support arm by installing four (4) 5/16”-18 x 1-3/4” long carriage bolts
through the four (4) square holes shown in the spreader and through the four (4)
corresponding square holes in the top plate of a support arm (supplied with spreader).
Install 5/16” flat washers and 5/16”-18 hex nuts on the ends of the four (4) bolts
protruding below the bottom of the support arm. Complete the installation of the
support arm by drilling a 3/16” diameter hole though each hole in the vertical plate of
the support arm and through the pedestal. Install 1/4” flat washers and 1/4” x 1” long
lag screws into the post. Cover the lag screws with cap plugs. Repeat these steps for
the other support arm.
U.S.P.S. APPROVED
Newspaper Holders Installation to Pedestal
All hardware to attach the newspaper holders to the spreader is included with the
spreader. To attach a newspaper holder to the spreader, install four (4) 5/16”-18 x 1-
3/4” long carriage bolts through the four (4) square holes in the inside floor of the
newspaper holder, through the 1/4” tall square spacer and through the four (4)
corresponding holes on the spreader. Install 5/16” flat washers and 5/16”-18 hex nuts
on the ends of the four (4) bolts protruding below the bottom of the spreader. Repeat
these steps for the other newspaper holders.
Mailbox Installation to Newspaper Holders
All hardware to attach the mailboxes to the newspaper holders is included with the
newspaper holders. To attach a mailbox to a newspaper holder, install four (4) 5/16”-
18 X 3/4” long carriage bolts into (4) square holes in the floor of the mailbox and
through the four (4) square holes on the top of the newspaper holder. Install 5/16” flat
washers and 5/16”-18 hex nuts on the ends of the four (4) bolts protruding below the
top of the newspaper holder. Cover the hex nuts with cap plugs. Repeat these steps
for the other mailboxes. Installation is now complete. Additional hardware provided is
not needed and may be discarded.
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.