Salsbury Industries 3703D04ZRU, 3703D04ZRP, 3705S03ZRP, 3705S03ZRU, 3705D08ZRU Installation Manual

...
4C Recessed Mounted Horizontal Mailboxes – 3700 Series
REAR LOADING Installation Instructions
With its quality design and construction, Salsbury Industries’ 3700 series USPS approved 4C recessed mounted horizontal mailboxes will provide years of maintenance free service. These units meet all the requirements of USPS STD-4C, the new high-security standard developed by the United States Postal Service.
4C recessed mounted horizontal mailboxes can be installed either with the included connector kits (see instructions on pages 2-6) or separately with indi­vidual wall framing (see page 6).
TYPICAL INSTALLATION
PREPARATORY STEPS
Have mailboxes and instructions on hand before
1. starting wall construction. Unpack and review contents of shipping cartons.
2. Gather tenant and parcel locker keys and store in a
3. secure place. Read installation instructions document thoroughly.
4. Determine rough opening size(s).
5. Determine rough opening location above finished floor.
6. Determine framing configuration and location.
7. Procure materials for wall construction.
8.
USPS REGULATIONS
The mailboxes must be installed according to Postal Regulations.
1.
The floor of the lowest patron mailbox shall be no less than 28” above the finished floor.
2.
The patron lock in the highest mailbox shall be no more than 67” above the finished floor.
3.
The USPS Arrow lock (master door lock) opening must be a minimum of 36” and a maximum of 48” above the finished floor.
4.
The floor of the lowest parcel locker shall be no less than 15” above the finished floor.
5.
The master access door(s) must be allowed to open a minimum of 90 degrees with no obstruction.
6.
There must be at least one parcel locker for every ten patron mailboxes in installations of 10 or more patron mailboxes. Parcel lockers must be a minimum of 15” high (PL4.5, PL5 and PL6) to meet the 1:10 ratio. Once this ratio has been met, smaller parcel lockers (PL3 and PL4) may also be added. There is no requirement for parcel lockers in installations of less than 10 patron mailboxes, but one or more parcel lockers are recommended.
67” AFF ­HIGHEST POSITION FOR PATRON LOCK
48” AFF ­HIGHEST POSITION FOR AT LEAST (1) PATRON COMPARTMENT
CARRIER ACCESS DOOR LOCK
U.S.P.S. APPROVED
48” AFF
CARRIER DOOR
ACCESS LOCK MUST
FALL BETWEEN
THESE DIMENSIONS
36” AFF
NOTES
Although these mailboxes have been tested and
1. approved for both outdoor and indoor use, some shelter from direct weather conditions should be provided, especially in areas with heavy rainfall. This provides protection for the mail, the delivery personnel, and the mail patrons. The mailboxes are shipped fully assembled.
2. Hardware is included to fasten each unit into a wood
3. framed wall. Trim is an integral part of the mailbox assembly. There
4. is no other snap on trim to install.
Phone: 800-624-5269 Int’l Phone: 323-846-6700 Fax: 800-624-5299 Int’l Fax: 323-846-6800
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes
no product assembly or installation liability. Copyright © 2015 Salsbury Industries. All rights reserved. (Rev. 20, 02/10/2017)
1010 East 62nd Street, Los Angeles, CA 90001-1598
www.mailboxes.com engineering@mailboxes.com
28” AFF ­LOWEST PATRON SHELF SURFACE
15” AFF ­LOWEST PARCEL LOCKER SHELF SURFACE
FINISHED FLOOR
SALSBURY INDUSTRIES
Page 1 of 6
4C Recessed Mounted Horizontal Mailboxes – Connector Kit
Rear Loading Unit Installation Instructions
Rough Opening
Height: See chart on page 6.
Width: To establish the size of the rough opening(s) in the wall(s) you will be installing your mailbox configuration(s) into, calculate the overall width of the total amount of units per wall installation; then subtract 3/4” from the width grand total.
Example: (2) double-colum mailboxes are to be installed.
• Each unit is 31-1/8” wide x 2 units = 62-1/4”
• 62-1/4” - 3/4” = 61-1/2” required for rough opening.
STEP 1
Place the first unit into the rough opening (see figure 1). Open the master door panel(s) (see figures A-C below).
Figure 1
Hardware required for installation
-#8 square drive x 2” long wood screws (provided with mailbox)
-Connector #8 x 1/2” pan head self tapping machine screws (provided with each 4C Connector Kit)
Connector bar corresponds to unit height
Open the right master door panel until it
engages the locking position (see gure
A). While preventing the two front master doors from fully closing together, remove the cardboard strip divider.
Unlocking hole on front of unit
To open the left master
door panel, insert a at-
head screwdriver into the center locking hole (see
gure B) and push up to
pry the locking mechanism upward; thus unlocking the left master door panel. Open the left master door panel until it engages the locking position.
Figure B Figure C
Figure A
Unlocking hole on rear of unit
If both master door panels become fully closed, locate the unlocking hole located on the back of the unit.
Insert a at-head screw-
driver through one of the
unlocking holes (see gure
C) and push upward as noted above to open the master door panels.
1010 East 62nd Street, Los Angeles, CA 90001-1598
SALSBURY INDUSTRIES
Phone: 800-624-5269 Int’l Phone: 323-846-6700 Fax: 800-624-5299 Int’l Fax: 323-846-6800
www.mailboxes.com engineering@mailboxes.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes
no product assembly or installation liability. Copyright © 2015 Salsbury Industries. All rights reserved. (Rev. 20, 02/10/2017)