4C Recessed Mounted Horizontal Parcel Lockers – 3700 Series
FRONT and REAR LOADING Installation Instructions
IMPORTANT NOTE FOR USPS ACCESS!
After Installing the unit, contact your local postmaster – the USPS will provide and install its own master lock on
With its quality design and construction, Salsbury Industries’ 3700 series USPS approved 4C recessed mounted horizontal parcel lockers will provide
years of maintenance free service. These units meet all the requirements of USPS STD-4C, the new high-security standard developed by the United
States Postal Service.
4C recessed mounted horizontal parcel lockers can be installed either with the included connector kits (see instructions on pages 2-7) or separately with individual wall framing (see page 7).
your parcel locker unit. Hardware for installing the master lock is included in the plastic bag.
U.S.P.S. APPROVED
TYPICAL INSTALLATION
PREPARATORY STEPS
Have parcel locker(s) and instructions on hand before
1.
starting wall construction to ensure accurate and tight
rough openings.
Unpack and review contents of shipping cartons.
2.
Gather tenant and parcel locker keys and store in a
3.
secure place.
Read installation instructions document thoroughly.
4.
Determine rough opening size(s).
5.
Determine rough opening location above finished floor.
6.
Determine framing configuration and location.
7.
Procure materials for wall construction.
8.
USPS REGULATIONS
The parcel lockers must be installed according to Postal Regulations.
1.
The patron lock in the highest parcel locker shall be no more than 67” above
the finished floor.
2.
The floor of the lowest parcel locker shall be no less than 15” above the
finished floor.
3.
There must be at least one parcel locker for every ten patron mailboxes in
installations of 10 or more patron mailboxes. There is no requirement for
parcel lockers in installations of less than 10 patron mailboxes, but one or
more parcel lockers are recommended.
48” AFF
CARRIER DOOR
CARRIER
ACCESS
DOOR LOCK
ACCESS LOCK MUST
FALL BETWEEN
THESE DIMENSIONS
36” AFF
NOTES
Although these parcel lockers have been tested and
1.
approved for both outdoor and indoor use, some
shelter from direct weather conditions should be
provided, especially in areas with heavy rainfall. This
provides protection for the mail, the delivery personnel,
and the mail patrons.
The parcel lockers are shipped fully assembled.
2.
Hardware is included to fasten each unit into a wood
3.
framed wall.
Trim is an integral part of the parcel locker assembly.
4.
There is no other snap on trim to install.
Phone: 800-624-5269 Int’l Phone: 323-846-6700 Fax: 800-624-5299 Int’l Fax: 323-846-6800
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes
no product assembly or installation liability. Copyright © 2015 Salsbury Industries. All rights reserved. (Rev. 11, 02/10/2017)
1010 East 62nd Street, Los Angeles, CA 90001-1598
www.mailboxes.com engineering@mailboxes.com
15” AFF LOWEST
PARCEL
LOCKER
SHELF
SURFACE
FINISHED
FLOOR
SALSBURY INDUSTRIES
Page 1 of 7
4C Recessed Mounted Horizontal Parcel Lockers – Connector Kit
Front and Rear Loading Installation Instructions
Rough Opening
Height: See chart on page 7.
Width: To establish the size of the rough opening(s) in the
wall(s) you will be installing your parcel locker configuration(s)
into, calculate the overall width of the total amount of units per
wall installation; then subtract 3/4” from the width grand total.
Example: (2) double-colum mailboxes are to be installed.
• Each unit is 31-1/8” wide x 2 units = 62-1/4”
• 62-1/4” - 3/4” = 61-1/2” required for rough opening.
STEP 1
Place the first unit into the rough opening (see figures 1A and 1B below).
Front Loading
Units with Carrier
Access Door
Figure 1A
Hardware required for installation
-#8 square drive x 2” long
wood screws
(provided with parcel lockers)
-Connector #8 x 1/2” pan head self
tapping machine screws (provided
with each 4C Connector Kit)
Rear Loading Units
without Carrier
Access Door
Figure 1B
Connector bar
corresponds to
unit height
SALSBURY INDUSTRIES
1010 East 62nd Street, Los Angeles, CA 90001-1598
Phone: 800-624-5269 Int’l Phone: 323-846-6700 Fax: 800-624-5299 Int’l Fax: 323-846-6800
www.mailboxes.com engineering@mailboxes.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes
no product assembly or installation liability. Copyright © 2015 Salsbury Industries. All rights reserved. (Rev. 11, 02/10/2017)
Page 2 of 7
STEP 2
Open the master door panel(s) (see figures 2A and 2B below).
Front Loading Units with Carrier Access Door
Open the carrier access door and locate the lock bar release
latch. Push the latch up to unlock both master door panels.
Rear Loading Units without Carrier Access Door
Open the right master door panel until it engages the locking
position. While preventing the two front master doors from
fully closing together, remove the cardboard strip divider.
Unlocking
To open the left
master door panel,
hole on
front of unit
insert a at-head
screwdriver into the
center locking hole
(see gure 2C) and
push up to pry the
Figure 2C
locking mechanism
upward; thus unlocking the left master
door panel. Open
the left master door
panel until it engages
the locking position.
Figure 2B
Figure 2A
Lock bar release latch
If both master door
panels become
fully closed, locate
the unlocking hole
located on the back
of the unit. Insert a
at-head screwdriver
through one of the
unlocking holes (see
gure 2D) and push
upward as noted
above to open the
master door panels.
Unlocking
hole on
rear of unit
Figure 2D
For Single-Wide Parcel Units without Carrier Access Door
You can open the master door panel on single wide
units (see gure 2E) by lifting the lock bar screws
located on the side of the unit.
SALSBURY INDUSTRIES
1010 East 62nd Street, Los Angeles, CA 90001-1598
Phone: 800-624-5269 Int’l Phone: 323-846-6700 Fax: 800-624-5299 Int’l Fax: 323-846-6800
www.mailboxes.com engineering@mailboxes.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes
no product assembly or installation liability. Copyright © 2015 Salsbury Industries. All rights reserved. (Rev. 11, 02/10/2017)
Figure 2E
Lift these two lock bar
screws upward to
open unit
Page 3 of 7