Salamander Designs SB229C-B User Manual

SYNERGY 229
!
Twin Assembly
Includes:
(1) Twin 20 Unit
(2) S20 Side Panels
(2) S10 Doors
(1) Double-Width Shelf
BEFORE YOU BEGIN:
!
• Unpackallpartsandreadinstructionscarefullybeforebeginning.
•Shelfpegsanddoorhingesmustslideintothechannelsofthepostinthecorrectorder.
They cannot be removed individually without disassembling the whole unit.
Connect Posts to Bottom Shelf
1
A. Square Post
Square the post to the bottom shelf.
Short Post
O
90
B. Connect Post
Screw foot with metal washer through bottom shelf and into the end of each extruded post. Hand tighten fully and use wrench to tighten nut onto underside of shelf.
WARNING: Tighten by screwing the leveler foot NOT the post.
Leveler Foot
Limited Warranty
Five full years Salamander Designs Ltd will repair or replace, at our option, any product defective in materials or craftsmanship. Salamander Designs Ltd. will not be responsible for any damage to or destruction of other equipment consequential to our equipment failure. Defective product must be given Return Authorization and is to be returned to the factory prepaid, in the original carton and packing material. Any damage incurred in a shipment not in original packaging shall be the responsibility of the owner. Warranty repairs will be returned prepaid, via UPS within the continental U.S.A. only.
TM
Washer
Hex Nut
Doc No. 500-615/v8.12 229 -1/4
Installing Hardware
2
D
C
A
A. Bottom Door Hinges
Slide the bottom door hinge plates through the front post channels.
D
C
B
A
B. Door Stops
Insert one left and one right door stop down center post.
A B
3
Attach Rear Panels
A. Insert Hardware
Combine the 1” threaded studs with flat nuts. Slide 2 sets of hardware down the two outside posts and 4 sets down the center post. Allow studs to remain loose at bottom of post.
2X
www.salamanderdesigns.com
1 2
R E A R
P A NE L
E X TE
ND E D
R E A R
P A N E L
S
2
0 / S V
D O
3 4
R E A R
P A N E L
S3 0 /
S 4 0
5 6 7
4
1 / 2
"
SPACER
6"
TOOL
8 9
8"
4X
"
8
TOOL
ACER
6"
SP
1/2
"
4
/ S40
S30
EL
REAR PAN
DO
S20 / SV REAR PANEL
D
EXTENDE
NEL
REAR PA
1 2 3 4 5 6 7 8 9
www.salamanderdesigns.com
2X
8"
TOOL
6"
SPACER
4
"
1/2
0
S30 / S4
NEL
REAR PA
/ SVDO
S20
NEL
REAR PA
ED
EXTEND AR PANEL
RE
1 2 3 4 5 6 7 8 9
www.salamanderdesigns.com
TIP
To ease installation of rear panels, gently place the unit face down on the floor to improve aligning of panels.
C. Top Door Hinges
Slide the top door hinge plates through the front post channels, aligning with bottom door hinges.
D. Heavy Duty Bracket
Install heavy duty brackets down outer posts to support the double-width shelf. Place rubber shelf tabs through bracket.
B. Position & Secure Studs
Align the Spacer Tool at the top of each post, then position top studs through the small “Rear Panel” hole. Repeat this step with the bottom studs aligning the Tool along the bottom of post to set spacing for cable passage. Use the hex key to secure the top and bottom studs to the posts.
C. Place Rear Panels
Secure each panel in place with thumb nuts.
8"
89
6"
7
"
4
1/2
/ S40
S30 REAR PANEL
SVDO
S20 / REAR PANEL
EXTENDED REAR PANEL
www.salamanderdesigns.com
1 234 5 6
Doc No. 500-615/v8.12 229 - 2/4
Loading...
+ 2 hidden pages