
HEAVY DUTY PULL-OUT SHELF - PS2
Parts
1 - Shelf Assembly
1 - Hinge Side Slide
1 - Non-Hinged Side Slide
If preferred, at nuts can be used in place
of drop-in nuts if cabinet is disassembled.
Arrange Slides
1.
If installing shelf behind a door,
arrange slides according to diagram.
A Door Hinge on Right
B Door Hinge on Left
Note: Rubber Stop
Position at back
4x
Flat Nut
small
C-FRAME /
CHAMELEON
4x
Connector Bolt
3/8”
SYNERGY
4x
Connector Bolt
1/2”
B
Wire Management
Feature
UNIVERSAL
4x
Drop-in Nut
A
Rubber Stop
1x
Z - Hex Key
A
B
• For Chameleon Cabinets use the inner
slots closest to the center of cabinet.
Assembly Slide
Attach Slides to Frame
2.
Loosely assemble hardware to slides as shown.
Install Slides onto frame as shown (left) or use
Flat Nut if preferred (partial disassembly required).
Combine Shelf and Slides
3.
Firmly t the shelf into slides until it clicks in place.
Adjust Position and Level
4.
Use a box, bowl, or other object placed underneath
the shelf to keep level while tightening the four bolts.
Be sure drop in nuts rotate in t-slot when tightened.
Use a level to align pull out shelf at desired
position and secure slides in place using hex key.
Optional Installation
using at-nut shown
at right. (Cabinet
needs partial
disassembly
for installation).
Limited Warranty
Five full years Salamander Designs Ltd will repair or replace, at our option, any product defective in materials or craftsmanship. Salamander Designs Ltd. will not be responsible for any damage to or
destruction of other equipment consequential to our equipment failure. Defective product must be given Return Authorization and is to be returned to the factory prepaid, in the original carton and packing
material. Any damage incurred in a shipment not in original packaging shall be the responsibility of the owner. Warranty repairs will be returned prepaid, via UPS within the continental U.S.A. only.
©2012 Salamander Designs Ltd. Doc No. 500-475