Sakura HBK-18DS/B, HBK-23DS/B, HBK-18BS/B, HBK-23BS/B, HBK-18AS/B Operation / Installation / Service Manual

...
Page 1
Sakura Air Conditioner User-friendly, Earth-friendly
Evaporative Air Cooler
(Operation / Installation / Service Manual)
HBK-1823DS / B
Ref, S- 116 / 03 / 10
HBK-1823AS / B HBK-1823BS / B
Hand-held remote controller
Page 2
CONTENTS
1 . SA
FETY PRECAUTIONS…………..………………………… 1
2 . PRODUCT
INTRODUCTION………………………………… 1
3 . SPEC
IFICATIONS……………………………..……………… 2
4 . APPLICABLE RANGE…………………………………………
3
5 . OPERATING ENVIRONMENT…………………..…………… 3
6 . UNIT
PARTS IDENTIFICATIONS………………….………… 4
7 . PACKING LIST……………………………………….………… 4
8
. SAFETY CAUTION…………………………………………..… 4
9
. CIRCUIT DIAGRAM…………………………………………… 6
10
. MAIN CONTROL BOARD………………..…………………… 7
11
. OPERATING INSTRUCTIONS……………..………………… 7
12
. INSTALLATION INSTRUCTIONS……………….…………… 8
13
. CLEANING AND MAINTENANCE…………....……………… 13
14 . TROUBLE SHOOTING………………………………………… 14
SAKURA – Total Air Conditioning Solution
Please read this instruction carefully before using
PAGE
Page 3
1.Do not put your hand or other stuff in the air outlet of the operatin machine.Otherwise,it may cause injury.
2.Do
not place heavy object on the unit,keep child away from the unit
3.Do
not put gas cooker in the place which the unit can blow directly. Otherwise,it may cause carbon
monoxi
de poisoning.
4.Do
not disassemble or modify the unit since the wrong operation may cause water leakage,fire or electric
shock
.
5.Do
add water from the water inlet of the unit
6.Do
not install the unit in the place full of explosive and flammable materials.
7.When
not using the unit for a long time,please drain the water tank of all the water.Then keep the unit
ope
rating in fan mode for 10 minutes to dry the cooling pad,then turn off the power switch.
8.Always
ensure effective earthing.
The
environment friendly air conditioner has following advantages:
Power
saving:it can save over 80% compared with traditional air conditioner Environment friendly:No
harmful
material,no freon during operating. High Efficiency:Use the min.power to make the max cooling
and
purifing effect. Working Principle:The evaporative air cooler produces effective cooling by combining a
natural
process-water evaporation-with a simple,reliable air-moving system.Fresh outside air is filtered
throu
gh the saturated evaporative media cooled by evaporation,and circulated by a blower wheel. Water
from
the bottom pan of the unit is pumped to the top and allowed to flow down over the evaporation cooling
pads of the spot cooler,evenly saturating the pads. Then a powerful blower pulls air through the
pads,forcing the water to evaporate which decrease the ambient temp.The cool air is then blown by the unit
at
a high velocity where you direct the cool air to go.
1
SAKURA – Total Air Conditioning Solution
1 SAFETY PRECAUTIONS
2 PRODUCT INTRODUCTION
Page 4
Outdoor air
Fa
n
Cold air
Water
pump
Evaporat
ion
heat exchanger
Water tank
Sketch Map of Operating Principle
Model No. HBK-18DS/B HBK-23DS/B HBK-18BS/B HBK-23BS/B HBK-18AS/B HBK-23AS/B
Max Air Volume 18000m³/h 23000m³/h 18000m³/h 23000m³/h 18000m³/h 23000m³/h
Voltage/Frequency 380V/50Hz
Current 2.2A 2.8A 2.2A 2.8A 2.2A 2.8A
Power 1.1KW
Motor High efficient and waterproof type
Fan Type axial
Water Tank Vloume 25L
Dimension(mm) 1100×1100×950 1100×1125×950 1100×1100×1040
Net Weight 69kg 71kg 78kg
Applicable Area
80100 m²
Air Outlet Size 670×670 mm
Noise
60dB 70dB 60dB 70dB 60dB 70dB
Water Consumption 5-20 L/H
2
SAKURA – Total Air Conditioning Solution
3 SPECIFICATION
Page 5
Due to the features of evaporative air cooler,like cooling,humidifing,air exchanging,it's mainly
applicable
for the places need to be cooling and ventilating,like:
1.Electronic,shoes,printworks,plastic,clothes,printing,packing factories,etc.
2.
Texitle,machine,ceramics,chemicals,glasses,hardware,leather factories,etc.
3.Hospi
tal,school,waitingroom,internetbar,shopping mall,supermarkets,etc.
4.Some
public places like kitchen,vegetable market,clubs,parking lot,bus station,etc.
5.Gree
nhouses,flowers and fowl farm,etc.
6.The
room which has requirements of high humidifing.
1.Ambient
temp.: 2 ~ 45
2.Ambient
humidity: ≤90%
3.Atmospheric
pressure:86KPa~106Kpa
4.
Water should be processed with softening,water temp. 0 ~ 45, water pressure 0.15~0.6Mpa
5.Input
voltage should be within 10% of rated voltage
6.No
corrosive gas around.
SAKURA – Total Air Conditioning Solution
3
4 APPLICABLE RANGE
5 OPERATING ENVIRONMENT
Page 6
ITEM NAME QTY.
1 Evaporative Air Cooler 1
2 USER'S MANUAL 1
To provent injury to the user or other people or property damage,the following instructions must be
followed:
This symbol indicates CAUTION
This symbol indicates NEVER DO THIS
This symbol indicates ALWAYS DO THIS
4
SAKURA – Total Air Conditioning Solution
6 STRUCTURE CHART
7 PACKING LIST
8 SAFETY CAUTIONS
Page 7
5
SAKURA – Total Air Conditioning Solution
Page 8
No using in the environment of explosive and flammable meterials
Keep the unit working in a flat place
Make the air outlet&inlet not close to wall,curtain,etc.,it may affect the performance
Only authorised service technician are allowed for repair or maintenance
6
SAKURA – Total Air Conditioning Solution
9 CIRCUIT DIAGRAM
Page 9
1.Connect with the power, and the unit will be in stand-by condition.
, and press to stop .
2.To cool the air, press
3.To ventilate, press , press to stop.
4.To clean the unit, press
, press
to stop.
.5.Under the condition of ventilation or cooling, if need swing function,press
Press
it again to stop swinging.(This function could only be used in the existence of electric
swing).
1.A
fter water inflow,water inlet and water level will be controlled by floater automatically.
2.A
fter power on, the unit will be in stand-by condition.
3.After power on,press to run in cooling mode,fan will start after submerged pump run for
4.
minutes;If any water shortage,fan will start without delay,and
will be shinning.The
submerged
pump start when water level reach to a normal status.Press to stop.
5.A
fter power on,press to run in ventilation mode,and fan will start.If fan not
run,ventilation light will be shining after several seconds,this may be caused by lack of
phase,plea
se cut off immediately and ask professional technician for maintenance.
6.After power on,press to run in clean mode.Drainage pump start and run for 2 minutes.
.
7.Under
the condition of ventilation or cooling,if need swing function,press
Press
to stop swinging.(This function could only be used in the existence of electric
stop operating,press
o binet to affect the operation.
lck
the air inlet and air
11 r out of the tank,and
12
e filter.If using in the dirty
7
swing).
8.If need to
9.Do not put any o n the top of the cabject
10.Duri
ng operation, make sure that there’s no any object to cover or bo
outlet.Do
not put your hand or other object to the air outlet and air inlet.
.If
not using the unit for a long time or in the winter,please drain the wate
keep
the unit running for 10 minutes in ventilation mode,to dry the cooling pads.Then cut off
the
power and cover the cabinet by diaphragm for next time using.
.Suggest
to drain the water out of the tank every week and clean th
envi
ronment,please drain the tank for more times.
SAKURA – Total Air Conditioning Solution
10 MAIN CONTROL BOARD
11 OPERATING INSTRUCTIONS
Page 10
. Installation Methods: 1
Installation Drawing for Down Discharge Unit
8
SAKURA – Total Air Conditioning Solution
12 INSTALLATION
Page 11
Installation Drawing for Side Discharge Unit
9
SAKUR Total Air Conditioning Solution A –
Page 12
Installation Drawing for Up Discharge Unit
10
SAKURA – Total Air Conditioning Solution
Page 13
Mounting Bracket Planform
Mounting Bracket Side View
11
SAKUR Total Air Conditioning Solution A –
Page 14
2
Make sure to read th
. Important Notice for Installation
e use instructions and carry out the work by strictly complying with the
sed
space, the air outlet should be installed, so as to keep the balance of air outlet
2 B
stalled horizontally, and the space between machine and wall
3
23DS/B,23BS/B
and 23AS/B,it is better to install air pipe.
ameter
should be
4
ir volume, so as to make the air volume of the branch pipe reach the
5I6L ent is required for the air pipe. As for the down discharge model, four
air
7W
nc
e ladder shall be installed near the unit (the ideal material is stainless steel),
8W
s an burglar mesh is installed on the windowl, try to
9
rity
out
pr
oject plan.
1The equipment is suitable to use in an open space. If it is required to install the equipment
in
a clo
volume
and air inlet.
efore
installing the bracket of the air conditioner, the level line shall be fixed with level bar.
The
bracket shall be in
should
be between 280 to 330mm. (It varies from different locations).The indoor controller
shall
be at least 1.5m above the floor, and the soldering and installation of mounting
bracket
shall be stable. It shall be installed horizontally. The unit shall be installed
ou
tdoors, and the dynamic load of the mounting bracket shall be more than 250kg. If the
bracket
is installed 3 meters above the ground, it shall be added with guard rail. The water
supply
pipe and drainage pipe shall be properly installed. The water supply pipe shall be
ins
talled with pipe filer, so as to keep the incoming water clean. The drainage pipe shall
be
kept unblocked, which shall adopt PVC pipe and be connected and installed with
speed
glue.
It
is not recommended to install air pipe for model no., 18DS/B,18BS/B and 18AS/B;While
for
model no.
When
installing air pipe,the length should be within 30 meters,and the diameter of pipe
should
be changed by every 10 meters.For the first 10 meters,the di
800*
500 MM,for the second should be 700*500 MM,for the third should be 600*500MM.
The area of airflow outlet shall not be less than 1m
2
, or the length and size of the air pipe
shall
be made according to the design standard. After the air pipe enters the wall, the
airflow
outlet shall be not less than 2.2 meters above the ground (excluding special
circums
tances).
If
there is branch air pipe, the air deflector must be installed on the branch pipe to regulate
or
balance the a
design
value.
f need low noise, the silencing elbows shall be used, so as to meet the requirement.
eak-
proof treatm
10mm
drainage vents shall be left on the bottom of the waterproof elbow. When the
pipe
is connected to the room through the top of the building, leak-proof treatment is
required for the top building, so as to avoid the rainwater running into the room along the
air
pipe.
hen
the outdoor unit is installed on the wall without window or far from window, an
maintena
so as to facilitate the maintenance.
hen
the outdoor unit is installed under the window, the glass window shall be movable,
o as to open it when necessary. If
ins
tall a movable door with lock on the burglar mesh in case of any maintenance.
Before
testing the machine, check whether the water level is between the normal range. If
the
water level is too high or low, please adjust the float ball. Pull the dust and impu
of the water pipe, check the power supply and if there is any leakage on the water
inlet/outlet
pipe, then the testing can be started.
12
SAKURA – Total Air Conditioning Solution
Page 15
Clean cooling pad
Disconnect the power,unscrew the 6 screws on the shutter,then pulls the shutter slightly,and
ke off the cooling pads assy.
ta
Attention:
Do
not make too high water pressurenot use acidity or alkalinity detergent
r tank
utton
after power on and power off after 2 minutes
nnect
power,unscrew the screws on the shutterand take off the shutter
Cle t
which
easy to create bubble and
13
Clean wate
Method:
1.
Press "drain" b
2.
Disco
3.
Clean the bottom with soft brush
4.
Clean the dirt from the water level sensor
5. Clean
the water pump,drainage pump and filter with brush
an
he cabinet
Clean
the cabinet with soft detergent(Do not use the detergent
ha
rd brush)
SAKUR Total Air Conditioning Solution A –
13 CLEAN AND MAINTENANCE
Page 16
Problem Possible causes What to do
Air cooler does not start
1.
The air cooler is unplugged
2.Swithch button does not work
4.
Too low voltage
1.Check
the power
2.Re
place the main control board
phase
4.Check
the voltage
3.Check the
3.Lack of phase
1.Submerged pump broken 1.Replace the pump
Fuse blown frequent
2.Cooling pad or filter blocked 2.Clean pads or filter
flat place
kage
n
. Broken
flat place
k
ut
let assy.
let
assy.
ute assy.
1.Keep the unit in a
1. Unit not in a
2.Re
pair the water tan
2. Water tank lea
3.Re
place the water o
3. Water outlet assy. Broke
Water leakage
4.Re
place the water in
4. Water inlet assy.broken
5.Adjust
the float ball
5. Water level exceed
6.Check
the water distrib
6. Water distribute assy
7.Cl
ean the pads
7.Dirty cooling pads
1.Replace the fan blade
Nois
e
ut of shape
h
1. Fan blade demaged or o
2.Re
place motor
2. Motor abrasire
3.Clean
the bolcks
3.T ere sundries block the airout
d or too low wind
ng pad or filter pads and filter
oa
rd
am
aged or not
1.Clean or replace
1. Blocking on cooli
2.Replace main control b
2. Main control board damage
3.Check
if motor d
3. Motor no working
No
win
4.Check the phase
4.Lack of phase on motor
1.Add water
1. Lack of water
Air cooler does not cool as it
sho
uld
m
aged
in
g
bro
ken
trol
board
in control board
2.Check
water level sensor
2. Failure on water control syste
3.Replace submerged pump 3. Drainage pump dam
4.Replace main con
4.
Cooling button no work
5.Replace ma
5.Main control board
White precipitate in cabinet ate1.Mineral substance exceed normal r
1.Increase
drainaging rate
and
filter
14
SAKURA – Total Air Conditioning Solution
14 TROUBLESHOOTING
SAKURA CORPORATION
Tel: (81)45-949-8550 Fax: (81)45-949-8551 E-mail: mail@sakura-aircon.com URL: www.sakura-aircon.com
Loading...