available Monday-Friday 8:00 AM to 4:30 PM (Central Time)
(English-speaking operators)
Page 2
Work on a smooth, clean surface. Locate the A Back
1
Panel and position it with the large holes up. Lay the B Left
Panel and the C Right Panel on the left and right sides of
the Back Panels with the holes facing up as shown.
Arrange the D Fixed Shelf and two E Rails above the Back
Panel withthe holes up. Place the G Vertical Divider below
the Back Panels with the four large holes up.
Insert four H Cams into the large holes at the corners of
the Back Panel, the Fixed Shelf and both Rails, with the
arrows pointing toward the nearest hole in the edge.
Insert four more Cams into the large holes of the Vertical
Divider. Screw the I Screw Posts into each small hole
that has a plastic insert (do not over-tighten).
Tap J Wood Dowels into each hole located next to a
Screw Post on the Side Panels and the Fixed Shelf.
I
E
H
J
B
I
D
C
A
H
G
Locate the F Base Panel. Position the Panel with
2
the four large holes up. Attach the K Casters to the
two corners along one long edge using four M
Small Screws per Caster. Attach the L Casters with
Brakes to the two corners along one long edge
using four M Small Screws per Caster.
K
L
5390-37: 2 of 4; Rev. 3: 11/04
Safco Products Company, New Hope, MN 55428
Turn the base panel upright onto the Casters. Insert
3
two I Screw Posts into the two small holes that
have a plastic insert (do not over-tighten).
Tap two J Wood Dowels into the holes located
next to the Screw Posts as shown.
M
J
F
I
Page 3
Raise the G Vertical Divider upright with the
4
group of small holes near the upper end.
Raise the D Fixed Shelf and guide the posts
and dowels into one end of the Vertical
divider. Gently tap the Fixed Shelf to seat the
dowels. Use a screwdriver to fasten the Cams
by turning them clockwise until they stop.
Raise the Base Panel with Casters and guide
the posts and dowels into the other end of
the Vertical divider. Gently tap the bottom of
the Base Panel to seat the dowels. Use a
screwdriver to fasten the Cams by turning
them clockwise until they stop.
Insert four H Cams into each large hole in
the bottom of the Base Panel with the cam
arrow pointing to the nearest edge hole.
D
G
H
Raise the C Right Side Panel and guide the
5
posts and dowels into the holes on the
edges of the Base Panel and Fixed Shelf.
Gently tap the Side Panel to seat the dowels.
Use a screwdriver to fasten the Cams by
turning them clockwise until they stop.
Slide the A Back Panel down onto the
6
posts and dowels between the Base Panel
and Fixed Shelf. Fasten the Cams as previously instructed.
Position the two E Rails so the cam sides
face each other. Slide the Rails down onto
the posts and dowels. Gently tap the upper
end of the Rails to seat the dowels. Use a
screwdriver to fasten the Cams by turning
them clockwise until they stop.
C
E
A
5390-37: 3 of 4; Rev. 3: 11/04
Safco Products Company, New Hope, MN 55428
Page 4
Raise the B Left Side Panel and guide the
7
posts and dowels into the holes on the
exposed edges. Gently tap the Side Panel to
seat the dowels. Use a screwdriver to fasten
the Cams by turning them clockwise until they
stop.
Insert six O Shelf Glide Push Pins into the small holes
8
on the insides of the Side Panels and each side of the
Vertical divider.
Next install the six N Plastic Shelves: guide the back
of each Shelf onto the Push Pins, tilt the Shelf enough
to start the Shelf moving, and lower the shelf to push it
all the way into position.
B
O
N
Place the P Plastic Bins into the
9
upper compartment so the side
handles rest on top of the Rails.
Insert your file folders into the Bins.
ASSEMBLED UNIT
P
5390-37: 4 of 4; Rev. 3: 11/04
Safco Products Company, New Hope, MN 55428
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.