Congratulations and thank you for purchasing a Rubbermaid storage building.
BEFORE YOU BEGIN – BUILDING CODES
Be sure to check your local building codes, ordinances and restrictions, and applicable neighborhood governances.
BEFORE YOU BEGIN – SURFACE PREPARATION
To ensure proper assembly and performance your shed needs to be built on a solid, level surface.
A concrete or patio surface, or a treated-wood platform is recommended.
BEFORE YOU BEGIN – LOCATION
When choosing a location in your yard make sure you choose an area with easy access and one that provides
proper drainage for water to run away from the shed location.
BEFORE YOU BEGIN – PREASSEMBLY
Thoroughly review all assembly steps (it is important
that the steps are followed in the correct order).
Review the parts list and make sure that no parts
are missing.
IMPORTANT – DO NOT RETURN
TO THE STORE
For assistance with your Rubbermaid Storage Building
or for additional product information call our toll-free
Consumer Service number: 1-888-895-2110
M–F: 8:30 a.m. to 5:00 p.m. EST
or visit us online at: www.rubbermaid.com.
Installation Steps:
1. Site Preparation
2. Floor
3. Walls
4. Roof & Doors
5. Finishing
55 ¼"
76 ¾"
51 ½"
Note: Be sure to keep this instruction manual and your original store receipt to ensure our Consumer Service
Department can accurately and quickly assist you if necessary.
P0-5L20-P0
J
RB
G
C
RB
D
M
F
E
H
L
K
X
T
FFx4
Description Part Number Assembly Letter Quantity
Front Floor5L01
Floor
Repeat Floor5L11
Repeat Left Side5L12
Left Back5L04
Repeat Right Side5L13
Right Back5L05
Walls
Front Left Side5L02
Front Right Side5L03
Wall Connector5H75
Left Door5L06
Right Door5L07
Doors
Door Handle5L74
Lock Hasp5F58
Front Roof5L08
Repeat Roof5L14
Roof
Roof Brace5L36
#14 x 3/4" Combo Pan Head Screw
Roof PinNP 5J22
Roof Pin Assembly ToolM3 5J22
Hardware
Accessory Bracket5H888
* Extra screws are supplied
A
B
C
D
E
F
G
H
Q
L
K
T
X
J
M
RB
AA
FF
GG
1
1
1
1
1
1
1
1
15
1
1
1
1
1
1
2
42*
4
1
Required Tools
Safety
Glasses
Gloves
Utility Knife
Rubber Mallet
Phillips Screwdriver
Phillips Bit
1/8" Drill Bit
Liquid
Soap
(2) Step Stools/
Stepladders
Qx15
B
A
Two Person Assembly
5L20
Drill
55 ¼"
PREASSEMBLY:
• Review ALL assembly steps before beginning construction.
• Review the parts list and make sure that no parts are missing.
NOTE:
• To simplify assembly and to ensure proper engagement of all components,
apply a mild detergent to dovetail and snap fits before assembling.
51 ½"
76 ¾"
"24
CAUTIONS
CARE & USE
CAUTION: Always use gloves when using a utility knife.
CAUTION: Always use eye protection/safety glasses
during assembly.
CAUTION: When installing screws, do not overtighten.
CAUTION: Drill only through initial panel wall, unless
otherwise indicated.
1.0Site Preparation
• Shed can be cleaned with water and mild detergent as
necessary. DO NOT USE ABRASIVE DETERGENTS,
MATERIALS OR CLEANING TOOLS.
• To maximize your shed’s performance, remove
excessive snow and/or leaf accumulation from the roof.
• In the event of severe weather, please disassemble
and store in a secure location.
FLOOR PLAN:
Size the construction site to fit the entire floor.
OPTIONAL STEP:
If desired, recessed anchor locations (8 places)
can be used to anchor the shed floor to a foundation
after you have constructed one.
"~3-5/8
"~4-15/16
"24
"~3-5/8
51½"
55¼"
Build a solid, level surface for the shed foundation. Consult your local
building authority for ordinances, restrictions, or permits required
before building any structure at your home.
Note: Minimum dimensions for foundations shown.
~23-9/16"
"18
"~5
24-7/8"
"~51-1/2
ANCHOR
LOCATIONS
~55-1/4"
120.0°
Maximum opening
2.0Floor Installation
B
A
Using a rubber mallet and
a.
screwdriver, punch out
the screw holes along
the connection edge
of Repeat Floor (B)
.
Using a utility knife, cut the long side of each wall slot
b.
tab and then use a rubber mallet and screwdriver to
knock it completely out:
• 4 places on Front Floor (A)
• 8 places on Repeat Floor (B)
1.
2.
B
Using a rubber mallet and screwdriver, knock out the
c.
tabs for the door hinge, 2 places on Front Floor (A).
B
Drill pilot hole through top surface of floor, 2 places on
d.
Front Floor (A).
CAUTION: Drill through top surface of floor only!
A
A
A
2.1Floor Installation
Connect and align Repeat Floor (B) to Front Floor (A) and install Screws (AA)
a.
9 places; keep panels aligned and even while installing screws.
HELPFUL HINT: Pilot holes may be drilled for the screws using a 1/8" drill bit.
CAUTION: Do not overtighten screws.
AA (9)
B
3.0Wall Panel C Installation
a.
C
A
Using a screwdriver, punch out the screw holes on the
top of Repeat Left Side (C) 2 places.
Screw Holes
C
Snap Repeat Left Side (C) into the back position of
b.
Repeat Floor (B).
C
Hold Repeat Left Side (C) upright to prevent it from
c.
falling (until Left Back (D) is installed).
C
ALIGN
click
ALIGN
3.1Wall Panel D Installation
a.
D
Using a screwdriver, punch out the screw holes on the
top of Left Back (D) 4 places.
Screw Holes
D
Loading...
+ 12 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.