Rosemount Quick Start Guide: Rosemount 1195 Integral Orifice Primary Element Manuals & Guides

Quick Start Guide
00825-0100-4686, Rev FB
Rosemount™ 1195 Integral Orifice Assembly
April 2021
Quick Start Guide April 2021
NOTICE
If the Rosemount 1195 Integral Orifice was ordered assembled to a Rosemount Pressure Transmitter, refer to the following Quick Start Guides for information on configuration and hazardous locations certifications:
1. Rosemount 3051S Quick Start Guide
2. Rosemount 3051SMV Quick Start Guide
3. Rosemount 3051 Quick Start Guide
WARNING
Process leaks could result in death or serious injury.
To avoid process leaks, only use the gasket designed to seal with the corresponding flange adapter. To avoid process leaks, only use the O-ring designed to seal with the corresponding flange adapter.
Contents
Rosemount 1195 Integral Orifice Assembly View......................................................................... 3
Location and orientation.............................................................................................................. 4
Primary element orientation........................................................................................................ 6
Primary element installation.........................................................................................................9
Preparing for operation.............................................................................................................. 12
Product certifications................................................................................................................. 17
2 www.emerson.com
A
B
C
D
E
F
G
April 2021 Quick Start Guide
1 Rosemount 1195 Integral Orifice Assembly
View
Figure 1-1: Enhanced Support Body
A. Manifold B. Gaskets C. Studs
D. Nuts
E. Transmitter F. Rosemount 1195 enhanced support body
G. Enhanced support orifice plate
(1)
(1)
Transmitter and housing are shown for clarity purposes - only supplied if ordered.
Quick Start Guide 3
U D
U D
U
D
Quick Start Guide April 2021

2 Location and orientation

Install the Rosemount 1195 Integral Orifice in the correct location within the piping branch to prevent inaccurate measurement caused by flow disturbances.

2.1 Straight pipe length

Use the upstream (U) and downstream (D) lengths provided below in conjunction with figures below to determine the appropriate upstream (U) and downstream (D) pipe lengths. For example, for a 1-in. line size with a beta ratio (×) of 0.4 using installation of , the straight length of upstream piping required is 25 x 1 = 25-in., and downstream 10 x 1 = 10-in.
Note
The Rosemount 1195 Integral Orifice comes with the associated pipe lengths (18D upstream and 8D downstream) when ordered with process pipe-end connections.
Straight run requirements
Figure 2-1: Reducer
(2 d to d over a length of 1.5 d to 3 d)
Figure 2-2: Single 90° Bend Flow from One Branch
Figure 2-3: Two or More 90° Bends in Same Planes
(2)
(2)
For dimensions, see Table 2-1
4 www.emerson.com
U D
U D
U D
April 2021 Quick Start Guide
Figure 2-4: Two or More 90° Bends in Different Planes
Figure 2-5: Expander
(0.5 d to d over a length of d to 2 d)
Figure 2-6: Ball/Gate Valve Fully Open
Table 2-1: Straight Run Requirements (in Pipe Diameters)
(1)
β
Figure 2-1
up­stream (U)
Figure 2-2
up­stream (U)
Figure 2-3
up­stream (U)
Figure 2-4
up­stream (U)
Figure 2-5
up­stream (U)
Figure 2-6
up­stream (U)
Figures 2-1 through 2-6 On
down­stream
(2)
(D)
0.20 20 24 25 30 22 22 10
0.40 20 25 27 31 22 22 10
0.50 20 25 28 33 23 23 10
0.60 20 27 31 37 25 25 10
0.70 23 32 35 42 28 28 10
0.75 25 35 38 45 30 30 10
(1) Interpolation of intermediate β values can be used. (2) All straight lengths are expressed as multiples of the pipe inside diameter (d) and
shall be measured from the upstream face of orifice plate.
Quick Start Guide 5
A
B
C
D
FLOW
A
C
B
D
Quick Start Guide April 2021

3 Primary element orientation

Figure 3-1: Rosemount 1195 Flowmeter Orientation with Traditional Style Manifold
Gas (horizontal) Gas (vertical)
Liquid (horizontal) Liquid (vertical)
Steam (horizontal) Steam (vertical)
6 www.emerson.com
A
C
B
FLOW
F
E
D
A
B
C
D
FLOW
April 2021 Quick Start Guide
1. 90° recommended zone
2. Vertical plane
3. Horizontal plane
1. 360° recommended zone
2. Block valves
3. Vent valves
Figure 3-2: Rosemount 1195 Flowmeter Orientation with Flange by Flange Manifold
Gas (horizontal) Gas (vertical)
Liquid (horizontal) Liquid (vertical)
Quick Start Guide 7
A
B
C
D
A
B
C
FLOW
F
E
D
Quick Start Guide April 2021
Gas (horizontal) Gas (vertical)
Steam (horizontal) Steam (vertical)
1. A. 120° recommended zone
2. B. Horizontal plane
3. C. Vertical plane
1. D. 360° recommended zone
2. E. Block valves
3. F. Vent valves
Note
For saturated steam that is not high quality, it is recommended to mount in
8 www.emerson.com
a vertical line to avoid damming effect of the liquid.