Rosemount 2120 Quick Release Kit Quick Start Guide

Rosemount 2120
Quick Release Kit
Quick Start Guide
00825-0200-4030, Rev AA
December 2014
Quick Start Guide
A
B
C
Boss with 2-in. NPT hole
QR device
Tighten the QR device
December 2014
The Quick Release kit is a set of accessories that enables faster fitting and removal of a Rosemount 2100 Series level switch, and makes inspection, proof-testing, and servicing easier than ever. The kit can be used in process temperatures of: –40 to 212 °F at 870 Psi and –40 to 250 °F at 725 Psi (–40 to 100 °C at 60 Bar and –40 to 121 °C at 50 Bar).
Quick Release accessories eliminate the need for a second pair of hands, tools, and dis-connection of wires (where this is a safe option). The result is reduced maintenance activities, less activity-related failures (due to less making and breaking of connections and seals), and, therefore, longer production up-time.
Requirements
An existing 2-in. NPT hole on the tank A Rosemount 2100 Series vibrating fork with 2-in. Tri-clamp option A 2100 Series Quick Release kit (Figure 1) containing:
Quick Release device (item A), Tri-Clamp (item B), and seal (item C)
Figure 1. Quick Release kit (part number 02100-1060-0001)
A. Item part number 02100-3125-0001 C. Item part number 02100-3127-0001 B. Item part number 02100-3126-0001
Fitting procedure
Caution! Failure to follow these instructions could result in serious injury. Ensure the thread on tank is clean/free from debris before inserting fitting.
1. Screw the Quick Release (“QR”) device into the 2-in. NPT hole on the tank.
2
December 2014
Seal
Alternatively, the seal can be placed and held against the recess on the flange face of the 2120.
Hold them together whilst placing the Tri-Clamp around the joined flange faces.
The seal must be in good condition, seated correctly, and not visible between the flange faces.
Both Tri-Clamp halves must be seated correctly around the flange faces. Inspect for any misalignment before final tightening.
Quick Start Guide
2. Place and hold the seal against the recess of the QR device flange.
3. Bring the flange face of the vibrating fork to join with the seal and flange face of the QR device.
4. Place the Tri-Clamp around the joined flange faces and tighten the bolt(s).
5. Continue with the rest of commissioning.
3
00825-0200-4030, Rev AA
Removal procedure
1. Caution! Ensure the internal and external pressure has equalized before releasing the Tri-Clamp.
2. When ready to release the vibrating fork from the tank: a. Loosen the Tri-Clamp bolt(s).
b.Gently ease the vibrating fork away, keeping hold of the vibrating fork,
Tri-Clamp, and seal.
3. Keep the QR device screwed into the tank.
Quick Start Guide
December 2014
Emerson Process Management Rosemou nt Inc.
8200 Market Boulevard Chanhassen, MN 55317 USA T (USA) 1 800 999 9307 T (International) +1 952 906 8888 F +1 952 906 8889
Emerson Process Management
Neuhofstrasse 19a CH 6341 Baar Switzerland T +41 (0) 41 768 61 11 F +41 (0) 41 76 1 87 40
Standard Terms and Conditions of Sale can be found at www.rosemount.com\terms_of_sale The Emerson logo is a trade mark and service mark of Emerson Electric Co. Rosemount and the Rosemount logotype are registered trademarks of Rosemount Inc. All other marks are the property of their respective owners. © 2014 Rosemount Inc. All rights reserved.
Emerson FZE
P.O. Box 17033 Jebel Ali Free Zone Dubai UAE T +971 4 811 8100 F +971 4 886 5465
Emerson Process Management Asia Pacific Private Limited
Asia Pacific Pte Ltd 1 Pandan Crescent Signapore 128461 T +65 6777 8211 F +65 6777 0947 Service Support Hotline: +65 6770 8711 Email: Enquiries@AP.EmersonProcess.com
Emerson Process Management Latin America
1300 Concord Terrace, Suite 400 Sunrise Florida 33323 USA T + 1 954 846 5030
Emerson Beijing Instrument Co
No. 6 North Street, Hepingli Dongcheng District, Beijing 100013 China T +8610 6428 2233 F +8610 64287640
Loading...