INDUSTRIES,
INC.
Armor Link
INSTALLATION INSTRUCTIONS
™
Stainless Steel Coupling
The Armor Link™ is not designed to withstand
that the product label matches your application.
Armor Link™ is compatible with steel, CI, DI, A/C,
Concrete, PVC and HDPE pipe.
Pipe stiffeners are required on HDPE pipe.
SIZE
(inches)
4.50 4.41 - 4.61 435 2º 8 6
4.80 4.76 - 4.84 290 2º 8 6
6.63 6.54 - 6.73 330 2º 15 10
6.90 6.77 - 7.01 330 2º 15 10
8.63 8.54 - 8.78 260 2º 20 10
9.05 8.82 - 9.06 260 2º 20 10
10.75 10.63 - 10.87 215 2º 20 10
11.10 10.94 - 11.18 215 2º 20 10
12.75 12.60 - 12.83 230 2º 25 10
13.20 13.15 - 13.39 230 2º 25 10
17.40 17.32 - 17.56 230 2º 25 10
25.80 25.59 - 25.91 230 2º 45 14
RANGE
(inches)
WORKING
PRESSURE
(PSI)
ALLOWABLE
DEFLECTION
BOLT
TORQUE
(ft-lbs)
WRENCH
SIZE
(MM hex key)
Step 1 • Clean and eliminate any irregularities on
the pipe ends.
1
Step 3 • Slide the coupling over one pipe end with-
out opening the coupling.
3
Step 4 • Bring the other pipe end to a facing
position. Make sure the pipes are aligned concentrically and
that both pipe ends are correctly supported. See tolerances
indicated on the label.
4
Step 2 • On each pipe end, make a mark at a dis-
tance equal to half the width of the coupling.
Document # 10-9-0039 02/23/2015
21919 20th Avenue SE • Suite 100 • Bothell, WA 98021 • Phone (425) 951-6200 • 1-800-426-9341 • Fax (425) 951-6201
INSTALLATION INSTRUCTIONS
™
Armor Link
Stainless Steel Coupling
Step 5 • Place the coupling between the marks
and make sure that the armor is correctly placed under the
bolts.
5
½
½
Step 6 • Do not rotate the coupling or the pipe dur-
ing tightening. If there are three bolts, start with the center
bolt, and begin tightening the bolts alternately and evenly to
the required torque.
6
NOTE: Do not exceed the torque requirements
indicated on the product label.
Step 7 • If necessary, you may hydraulically test the
coupling up to 1.5 times the working pressure shown on the
product label.
HELPFUL HINTS
1. Be sure that the bolts are tightened to the proper torque shown on the label.
2. Eliminate any rocks or debris between pipe and gasket.
3. Eliminate any dirt on threads of bolts or nuts.
4. Pressure test for leaks before backlling.
5. Backll and compact carefully around coupling.
6. Reusing parts with stainless steel hardware may lead to a loss in pressure holding ability due to wear.
7. Make sure you have the proper size coupling.
21919 20th Avenue SE • Suite 100 • Bothell, WA 98021 • Phone (425) 951-6200 • 1-800-426-9341 • Fax (425) 951-6201