Rock-n-Roller RSH6Q Users Guide

Page 1
RSH6Q Model Specifications Your RSH6Q shipping box should contain the following part:
Length (Extended)
39.25” 4 x
⁄” low profile socket head screw
6 x swivel tab
Width 16” 4 x round support tubes 6 x short Allen bolt
2 x wing bolts with spring 6 x small 10 mm hex nut
2 x metal rail 1 x 10 mm wrench
2 x hooked mounting bracket 1 x Allen wrench, large
Page 2
vv
1. Install support tubes
With the RocknRoller Multi-Cart extended and both handles raised, install the round support tubes. Insert the 5/16” low prole
socket head screws into the handle's pre­drilled holes from the outer edge, so the support tube in inside the handle. Make sure each tube is set to the same height before screwing them in securely.
2. Install long rails
Install the 2 long metal rails to the 39" x 16" main shelf. Position the rails on the board so the hooked
end sits just past the edge. Insert 6 small Allen bolts into the shelf from the textured side, and secure each with a washer and 10 mm hex nut. Do not tighten the bolts completely yet.
3. Secure shelf
Install the shelf by placing the hooked brackets on the support tubes. Align the deck pieces together and
tighten all the short Allen bolts completely. The rails should now be secured to the shelf rmly.
Loading...