Read and understand this instruction manual before operating
detector . Improper use of the dete ctor could result in bodily harm
or death.
Periodic calibration and maintenance of the detector is essential
for proper operation and correct readings. Please calibrate and
maintain this detector regularly! Frequency of calibration
depends upon the type of use you have and the sensor types.
T ypical calibration frequencies for most applications a re between
6 and 12 months, but can be required more often or less often
based on your usage.
65-2461RK PPM Hexane Transmitter
Page 3
Product Warranty
RKI Instruments, Inc. warrants gas alarm equipment sold by us to be free from defects in
materials, workmanship, and performance for a period of one year* from the date of
shipment from RKI Instruments, Inc. Any parts found defective within that period will be
repaired or replaced, at our option, free of charge. Parts must be returned to RKI
Instruments, Inc. for repair or replacement. This warranty does not apply to those items
which by their nature are subject to deterioration or consumption in normal service, and
which must be cleaned, repaired or replaced on a routine basis. Examples of such items
are:
a) Pump diaphragms and valvesc) Batteries
b) Fusesd) Filter elements
Warranty is voided by abuse including mechanical damage, alteration, rough handling, or
repair procedures not in accordance with instruction manual. This warranty indicates the
full extend of our liability, and we are not responsible for removal or replacement costs,
local repair costs, transportation costs, or contingent expenses incurred without our prior
approval.
THIS WARRANTY IS EXPRESSLY IN LIEU OF ANY AND ALL OTHER
WARRANTIES AND REPRESENTATIONS, EXPRESSED OR IMPLIED, AND
ALL OTHER OBLIGATIONS OR LIABILITIES ON THE PART OF RKI
INSTRUMENTS, INC. INCLUDING BUT NOT LIMITED TO, THE WARRANTY OF
MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. IN NO
EVENT SHALL RKI INSTRUMENTS, INC. BE LIABLE FOR INDIRECT,
INCIDENTAL OR CONSEQUENTIAL LOSS OR DAMAGE OF ANY KIND
CONNECTED WITH THE USE OF ITS PRODUCTS OR FAILURE OF ITS
PRODUCTS TO FUNCTION OR OPERATE PROPERLY.
This warranty covers instruments and parts sold to users only by authorized distributors,
dealers and representatives as appointed by RKI Instruments, Inc.
We do not assume indemnification for any accident or damage caused by the operation of
this gas monitor and our warranty is limited to the replacement of parts or our complete
goods. Warranty covers parts and labor performed at RKI Instruments, Inc. only, and does
not cover field labor or shipment of parts back to RKI.
This manual describes the 65-2461RK ppm hexane transmitter. This manual also describes
how to install, start up, configure, maintain, and calibrate the transmitter when it is used
with a gas monitoring controller. A parts list at the end of this manual lists replacement
parts and accessories for the transmitter.
Specifications
Table 1 lists specifications for the ppm hexane transmitter.
DescriptionSpecification
Target GasCombustible Gas, Calibrated to Hexane
Detection Range0-500 ppm Hexane
Area ClassificationExplosionproof for Class I, Groups B, C, and D
Sampling MethodDiffusion
Table 1:Specifications
Signal Output4 to 20 mA
Response Time90% in 45 seconds
W ARNING: When using the 65-2461RK, you must follow the instructions and warnings
in this manual to assure proper and safe operation of the 65-2461RK and to
minimize the risk of personal injury. Be sure to maintain and period ically
calibrate the 65-2461RK as described in this manual.
65-2461RK PPM Hexane Tra nsm itter • 1
Page 6
Description
Factory Adjust Pot
This section describes the ppm hexane transmitter’s componen ts. It is a 4 to 20 mA type
detector head. It consists of the ppm hexane detector, amplifier, and junction box.
The ppm hexane detector is a MOS type (metal oxide semiconductor) detector packaged
in a 1/2 inch NPT nipple with a sint er ed metal flame arrestor on one end allowing
ambient air to diffuse into the detector . The flame arrestor also contains any sparks which
may occur within the detector. The 1/2 inch NPT mounting threads at the top of the
detector allow you to mount it into the bottom co nduit hub of the junction box. A
rainshield screws onto the bottom of the detector (flame arrestor end). The rainshiel d
helps protect the detector from rain and debris in the monitoring environment. Three
color-coded leads extend from the top of the detector. The leads a llow you to connect the
detector to the amplifier. The output of the detector is non-linear and is linearized by the
2 • 65-2461RK PPM Hexane Transmitter
HexaneDetec tor
Page 7
amplifier (see below).
Amplifier
The amplifier converts the non-linear electrical output from the detector to a linear 4 to 20
mA signal that corresponds to the detection range and transmits the signal to a gas
monitoring controller. The amplifier includes the terminal strips, gas select jumper strip,
span pot, zero pot, load voltage pot, and test points (see Figure 1).
Controller Terminal Strip
The controller terminal strip is a three position plug-in style terminal strip located near the
top of the amplifier. Use the controller terminal strip to wire the transmitter to a controller .
Detector Terminal Strip
The detector terminal strip is a three position plug-in style terminal strip located below
the controller terminal strip. Use the detector terminal strip to connect the detector to the
amplifier.
NOTE: The detector is factory-wired to the detector terminal strip. See “Wiring the PPM
Hexane Transmitter” on pa ge 5 for all wiring procedures related to the
transmitter.
Gas Select Jumper Strip
The gas select jumper strip is a three position pin style terminal strip located in the lower
left corner of the amplifier. A label next to the jumper strip indicates which pins must be
shorted to select hexane or hydrogen. A jumper block is installed at the factory over pins 1
& 2 to select hexane as the gas type. The gas type defines the linearizing curve used by the
amplifier to linearize the detector output.
Zero Pot
The zero pot is located in the upper left corner of the amplifier (see Figure 1). Use a small
flat blade screwdriver to turn the zero pot’s adjustment screw and adjust the amplifier’s
zero (fresh air) output during the start-up and calibration procedures.
Span Pot
The span pot is located to the right of the zero pot (see Figure 1). Use a small flat blade
screwdriver to turn the span pot’s adjustment screw and adjust the amplifier’s gas
response output during the calibration procedure.
Load Voltage Pot
The load voltage pot is located below the zero and span pots (see Figure 1). The load
voltage pot is not needed for normal scheduled maintenance, so it is a right angle pot that
is not accessible unless the amplifier is lifted out of the junction box enough to access the
adjustment s crew. Us e a small flat blade screwdrive r to turn the load voltage pot’s
adjustment screw and adjust the amplifier’s detector load voltage when the detector or
amplifier is replaced.
CAUTION: The amplifier includes additional pots. They are factory-set. Do not adjust the m.
65-2461RK PPM Hexane Tra nsm itter • 3
Page 8
Installation
Test Points
The test points are in the lower left corner of the amplifier on either side of the gas select
jumper strip (see Figure 1). The test points produce a 100 to 500 mV output that
corresponds to the transmitter’s 4 to 20 mA output. Use the test points and a voltmeter to
measure the amplifier’s output during the start-up and calibration procedures. The black
test point on the left is the negative (-) test point and the red test point on the right is the
positive (+) test point.
Junction Box
Use the junction box to install the transmitter at a mounting site that is remote from the
controller. The junction box also protects the amplifier and wiring connect ions made to
the amplifier. Use the top 3/4 inch conduit hub to connect wiring from the amplifier to the
controller. Use the cover on the f ront of the junction box to access the interior of the
junction box. The detector and amplifier are factory installed in the junction box.
This section describes procedures to mount the ppm hexane transmitter in the monitoring
environment and wire the transmitter to a controller.
Mounting the PPM Hexane Tr ansmitter
3/4 NPT Female
2.70.38
3.65
7.5 max
Rubber
Spacers,
3X
J Box
3/4 x 1/2 Reducing
Bushing
Figure 2: Mounting the PPM Hexane Transmitter
4 • 65-2461RK PPM Hexane Transmitter
Hexane
Detector
.75
Page 9
1.Select a mounting site that is representative of the monitoring environment. Consider
the following when you select the mounting site.
•Select a site where the transmitter is not likely to be bumped or disturbed. Make
sure there is sufficient room to perform start-up, maintenance, and calibration
procedures.
•Select a site where the target gas is likely to be found first. For hexane, which is
heavier than air, mount the transmitter near the floor or where hexane is mos t
likely to accumulate.
2.At the monitoring site you select, hang or mount th e jun c tion box with the detector
facing down (see Figure 2).
Wiring the PPM Hexane Transmitter
WARNING: Always verify that the power to the controller is off before you make
wiring connections.
1.Turn off power to the controller.
2.Place the controller’s power switch in the OFF position.
3.Remove the junction box cover.
4.The detector leads are factory wired. Verify that the detector leads are wired to the
amplifier’s detector terminal strip as shown in Figure 3.
5.To gain access to a plug-in terminal strip for wiring, pull it out of its socket by
grasping the terminal strip and pulling. The detecto r strip is keyed so that the
controller and detector terminal strips cannot be reversed inadvertently.
6.Guide a three-conductor, shielded cable or three wires in conduit through the top
conduit hub of the junction box.
7.Pull out the controller terminal strip, and connect the three wires to the terminal strip
as follows (see Figure 3).
•Connect the positive wire to the PWR/SIG “+” terminal.
•Connect the signal wire to the PWR/SIG “S” terminal.
•Connect the negative wire to the PWR/SIG “-” terminal.
CAUTION: If shielded cable is used, leave the cable shield’s drain wire disconnected and
insulated at the transmitter. You will connect the opposite end of the cable’s drain
wire to the controller’s chassis (earth) ground.
8.Reinstall the controller terminal strip into its socket.
9.Secure the junction box cover to the junction box.
10. Route the cable or wires leading from the ppm hexane transmitter through one of the
conduit hubs at the controller housing.
CAUTION: Do not route power and transmitter wiring through the same controller conduit hub.
The power cabl e may disrupt the transmission of the transmitter signal to the
controller.
65-2461RK PPM Hexane Tra nsm itter • 5
Page 10
11. Connect the wires to the applicable detector/transmitter terminal strip at the
controller as shown in Figure 3.
+24 VDC
4-20mA In (S)
- (DC Ground)
Gas SelectJumper,
InH exane Position
Cable Shield
Controller
P WR / SIG
1-2 Hex
243
1 Gas Select
B RS
W
3-4 H2
DETE CTOR
Red
Black
White
Detector Wires
Figure 3: Wiring the PPM Hexane Transmitter to a Controller
12. If shielded cable is used, connect the cable’s drain wire to an availab le chassis (earth)
ground at the controller. RKI controllers typically have a ground stud that can be used
to ground the cable’s drain wire.
6 • 65-2461RK PPM Hexane Transmitter
Page 11
Start Up
This section describes procedures to start up the ppm hexane transmitter and place the
transmitter into normal operation.
Introducing Incoming Power
1.Complete the installation procedures described earlier in this manual.
2.Verify that the power wiring to the controller is correct and secure. Refer to the
controller operator’s manual.
NOTE: When a transmitter is first powered up after installation or being off power for an
extended period, its signal will increase rapidly over a few seconds to a hi gh
level and then the signal will decrease so that it appears stable after a few
minutes. Be sure to make arrangements so that this does not cause unwanted
alarms.
3.Turn on power to the controller.
4.Turn on the controller.
5.Verify that the controller is on and operating properly. Refer to the controller
operator’s manual.
Transmitter Burn-In Period
Once power has been applied to the transmitter, it will take several days for the
transmitter signal to the controller to stabiliz e completely. This is the burn-in period. The
zero reading may be slightly above zero after startup and will stabilize in about 5 to 7
days. The transmitter is calibrated at the factory before shipment and it is not necessary to
calibrate the transmitter after startup. If calibration of the transmitter after startup is
desired, wait at least 5 days after startup before calibrating the transmitter. A burn-in
period of 7 days is recommended. See “Calibration” on page 15 for c alibration
instructions.
After the burn-in period, set the zero reading if necessar y as described in “Calibration” on
page 15.
CAUTION: Do not adjust the zero or span potentiometers for at least 5 days after startup. If the
fresh air reading is high eno ugh to cause unwant ed alarms during the burn-in
period, adjust the zero pot only enough to bring the reading below the alarm point.
Setting the Zero Signal
CAUTION: If you suspect the presence of combustible gas in the monitoring environment, use
the calibration kit and the zero air calibration cylinder to introduce “fresh air” to the
detector and verify an accurate zero setting. See “Calibration” on page 15 for
instructions to apply zero air when setting the zero signal.
1.Verify that the transmitter is in a fresh air environment (environment known to be free
of combustible gas).
2.Unscrew and remove the junction box cover from the junction box.
3.Set a voltmeter to measure in the millivolt (mV) range.
65-2461RK PPM Hexane Tra nsm itter • 7
Page 12
4.Plug the voltmeter leads into the test points on the amplifier. Plug the positive lead
5.Verify a voltmet er reading of 100 mV (±2 mV).
6.If necessary, use a small flat-blade screwdriver to adjust the zero pot until the
7.Remove the voltmeter leads from the test points.
8.Secure the junction box cover to the junction box.
Maintenance
This section describes maintenance procedures. It includes preventive maintenance,
troubleshooting, and component replacement procedures.
Preventive Maintenance
This section describes a preventive maintenance schedule to ensure the optimum
performance of the p p m hexane transmitter. It includes daily, monthly, and quarterly
procedures.
Daily
into the red + test point; plug the negative lead into the black - test point.
voltmeter reading is 100 mV (±2 mV).
Verify a display reading of 0 ppm at the controller. Investigate significant changes in the
display reading.
Monthly
This procedure describes a test to verify that the ppm hexane transmitter responds
properly to the target gas.
WARN ING: The controller is not an active gas monitoring device during the response
test procedure.
NOTE: Performing a response test on the ppm hexane transmitter may cause alarms. Be
sure to put the controller into its calibration mode or disable external alarms
before performing this test.
NOTE: The following procedure assumes the use of a calibration kit which includes a
calibration gas cylinder, a 0.5 LPM fixed flow regulator with an on/off knob, a
calibration cup for the detector, and a humidifier tube to connect the regulator to
the calibration cup.
Preparing for the response test
1.Place the controller into its calibration mode or disable external alarms.
2.Verify that the controller disp lay reading for the channel you are testing is 0 ppm.
If the display reading is not 0 ppm, set the zero reading of the transmitter as described
in “Start Up” on page 7, then continue this procedur e.
3.Screw the calibration cup onto the bottom of the detector.
4.Use the humidifier tube to connect the regulator to the calibration cup.
5.Set a voltmeter to measure in the millivolt (mV) range.
8 • 65-2461RK PPM Hexane Transmitter
Page 13
6.Remove the junction box cover, then plug the voltmeter leads into the test points on
the amplifier.
Plug the positive lead into the red + test point; plug the negative lead into the black test point.
7.Use the following formula to determine the correct test points output for the test
sample.
Output (mV) = (calibrating sample/fullscale) X 400 + 100
For example, with a test sample of 250 ppm h exan e and a fu llsc al e se ttin g o f 500 ppm
hexane, the correct output is 300 mV.
300 (mV) = (250/500) X 400 +100
Performing the response test
1.Screw the regulator into the calibration cylinder.
2.Turn the regulator knob counterclockwise to open the regulator.
3.Allow the gas to flow for one minute.
4. Verify that the reading is within ± 20% of the response reading you determined
earlier.
NOTE: If the reading is not within ± 20% of the correct response reading, calibrate the
transmitter as described in “Calibration” on page 15 of this manual.
5.Turn the regulator knob clockwise to close the regulator.
6.Unscrew the regulator from the calibration cylind er.
7.Unscrew the calibration cup from the detector.
NOTE: For convenience, leave the regulator and calibration cup connected by the
humidifier tube.
8.Remove the voltmeter leads from the amplifier test points.
9.Reinstall the junction bo x cover.
10. When the controller display reading falls below the alarm setpoints, return the
controller to normal operation.
11. Store the components of the calibration kit in a sa fe place.
Biannual
Calibrate t h e ppm hexane transmitter as described in “Calibration” on page 15.
65-2461RK PPM Hexane Tra nsm itter • 9
Page 14
Troubleshooting
The troubleshooting guide describes symptoms, probable causes, and recommended
action for problems you may encounter with the ppm hexane transmitter.
NOTE: This troubleshooting guide describes transmitter problems only. See the
controller operator’s ma nual for problems you may encounter with the
controller.
Table 2:Troubleshooting the ppm Hexane Transmitter
Slow or No
Response/
Difficult or
Unable to
Calibrate
• Controller indicates a
fail condition.
• Transmitter responds
slowly or does not
respond to response
test.
• Unable to accurately
set the zero or
response reading
during calibration.
• Transmitter requires
frequent calibration.
Note: Under “normal”
circumstances, the
transmitter requires
calibration once every 6
months.
Some applicatio ns may
require a more frequent
calibration schedule.
• The transmitter wiring
is disconnected or
misconnected.
• The transmitter’s zero
reading is low enough
to cause a fail
condition.
• The transmitter is
malfunctioning.
• The calibration cylinder
is low, out-dated, or
defective.
• The calibration gas
flow rate is too low.
• The transmitter is
malfunctioning.
1. Verify that the transmitter wiring is
correct and secure.
2. Calibrate the transmitter.
3. If the fail condition continues, replace
the detector.
4. If the fail condition continues, contact
RKI for further instruction.
1. Verify that the calibration cylinder
contains an adequate supply of a
fresh test sample.
2. Verify that the regulator used for
calibration is a 0.5 LPM regulator.
3. If the calibration/response difficulties
continue, replace the detector.
4. If the calibration/response difficulties
continue, contact RKI for further
instruction.
Replacing Components of the PPM Hexane Transmitter
This section includes procedures to replace the ppm hexane detector and amplifier.
Replacing the PPM Hexane Detector
1.Turn off power to the controller.
2.Place the controller’s on/off switch in the OFF position.
3.Remove the junction box cover.
4.Remove the detector terminal strip from its socket.
5.Disconnect the detector leads from the detector terminal strip. Note the position of the
color-coded leads as you remove them.
6.Unscrew the detector from the junction box.
7.Guide the detector leads of the replacement detector through the bottom conduit hub
of the junction box, then screw the mounting threads of the detector into the conduit
10 • 65-2461RK PPM Hexane Transmitter
Page 15
hub.
8.Connect the detector leads to the detector terminal strip as shown in Table 3 below
and Figure 3 o n page 6 of th is manual.
Table 3:Reconnecting the PPM Detector to the Amplifier
9.Re-install the detector terminal strip into its so cket.
NOTE: When a transmitter is first powered up with a new detector, its signal will
increase rapidly over a few seconds to a high level an d then the signal will
decrease so that it appears stable after a few minutes. Be sure to make
arrangements so that this does not cause unwanted alarms.
10. Turn on power to the controller.
11. Turn on the controller and place it into normal operation.
12. Allow the transmitter to run for 3 hours.
13. Make a preliminary setting of the sensor load voltage. See “Setting the Detector Loa d
Voltage” on page 13. This will be a te mporary load voltage setting since the load
voltage will need to be set again after the burn-in period as described below.
14. Perform a preliminary calibration. See “Calibration” on page 15. This will be a
temporary calibration since the new ppm detector must burn-in before it can be
properly calibrated.
15. Allow the replacement detector to burn-in for at least 5 days before you continue with
the next step. A burn-in period of 7 days is recommended.
16. After the burn-in period, set the load voltage as described in “Setting the Detector
Load Voltage” on page 13.
17. After setting the load voltage, calibrate the transmitter as described in “Calibration”
on page 15 of this manual.
Replacing the Amplifier
If you are replacing the amplifier, it is likely that the transmitter has been off power for an
extended period. Make sure to follow the preliminary load voltage and preliminary
calibration recommendations and the burn-in period recommendation before making the
final load voltage setting and cal ibration.
1.Turn off power to the controller.
2.Place the controller’s on/off switch in the OFF position.
3.Remove the junction box cover.
4.Unplug the detector terminal strip and controller terminal strip from their sockets.
You may leave the wires connected to the terminal strips.
5.Unscrew and remove the screw with the flat and lock washers that secures the
65-2461RK PPM Hexane Tra nsm itter • 11
Page 16
amplifier to the junction box.
6.Remove the old amplifier.
7.Install the detector and controller terminals strips into their sockets on the new
amplifier as shown in Figure 3 on page 6 of this manual. If controller leads or detector
leads were re moved during this procedure, refer to Tables 4 and 5 below.
Table 4:Reconnecting the PPM Hexane Amplifier
to the Controller
Amplifier Controller
Terminal Strip
PWR/SIG “-”
PWR/SIG “S”S (4 - 20 mA In)
PWR/SIG “+”+ 24V
Table 5:Reconnecting the PPM Hexane
Detector to the Amplifier
Amplifier Detector
T erminal Strip
DETECTOR “R”RED
DETECTOR “W”WHT
DETECTOR “B”BLK
Controller
Transm itte r Terminal
Strip (typical)
- (DC -)
Detector Lead
8.Lay the new amplifier in the junction box. Do not re-install th e am plif ier in the
junction box with the screw, flat washer, and lock washer yet becaus e you will need to
pull it out for access to the load voltage adjust pot below.
NOTE: When a transmitter is first powered up with a new amplifier, the initial output
may be either high or below zero. Be sure to make arrangements so that this does
not cause unwanted alarms.
9.Turn on power to the controller.
10. Turn on the controller and place it into normal operation.
11. Allow the transmitter to run for 3 hours.
12. Make a preliminary setting of the sensor load voltage. See “Setting the Detector Loa d
Voltage” on page 13. This will be a te mporary load voltage setting since the load
voltage will need to be set again after the burn-in period as described below.
13. Install the amplifier into the junction box with the screw , lo ck washer, and flat washer
you removed in Step 5 above. A foam gasket that orients the amplifier and keeps it
from rotating is installed on the bottom of the ampli fi e r. Make sure the amplifier is
seated flat in the junction box.
14. Perform a preliminary calibration. See “Calibration” on page 15. This will be a
temporary calibration since the new ppm detector must burn-in before it can be
properly calibrated.
12 • 65-2461RK PPM Hexane Transmitter
Page 17
15. Allow the replacement detector to burn-in for at least 5 days before you continue with
the next step. A burn-in period of 7 days is recommended.
16. After the burn-in period, set the load voltage as described in “Setting the Detector
Load Voltage” on page 13.
17. After setting the load voltage, calibrate the transmitter as described in “Calibration”
on page 15 of this manual.
Setting the Detector Load Voltage
The detector load voltage must be reset when the detector or amplifier is replaced or if
you suspect that it has been ch anged from the factory setting for your detection range.
This procedure involves setting a voltage while applying calibration gas to the detector
that matches the full-scale concentration for the transmitter. After repla cing the detector or
amplifier as described earlier in this manual, the following procedure must be completed
before calibrating the sensor. Be sure to follow the timing recommendations in “Replacing
the PPM Hexane Detector” on page 10 and “Replacing the Amplifier” on page 11 fo r
setting the load voltage.
WARNING: The controller is not an active gas monitoring device during the load
voltage setting procedure.
NOTE: The following procedure assumes the use of a calibration kit which includes a
calibration gas cylinder equal to the transmitter’s full scale gas concentra tion, a
0.5 LPM fixed flow regulator with an on/off knob, a calibration cup for the
detector, an d a hu midifier tube to connect the regulator to the calibration cup.
1.Screw the calibration cup onto the bottom of the hexane detector.
2.Use the humidifier tube to connect the regulator to the calibration cup.
3.Set a voltmeter to measure in the DC volt range.
4.Remove the junction box cover.
5.Remove the screw , flat washer, and lock washer retaining the amplifier to the junction
box, and carefully lift the amplifier to gain access to the load voltage adjustment pot.
See Figure 1 for the pot location.
6.Screw the regulator into the calibration gas cylinder . The cylinder must be equal to the
transmitter’s full scale gas concentration.
7.Turn the regulator knob counterclockwise to open the regulator.
8.Allow the calibration gas to flow for one minute.
65-2461RK PPM Hexane Tra nsm itter • 13
Page 18
9.Measure the voltage between the B terminal on the detector terminal strip and the (negative) terminal on the controller terminal strip as shown belo w in Figure 4.
Controller Terminal Str ip
ZERO
SPAN
1-2 Hex
3-4 H2
as Select
G
134
2
SWBR
PWR / SIG
Digital
Voltmeter
Measure Load Voltage
Between B and -
+
D ETECTOR
Detector Terminal Strip
NOTE: Detector and Controller Wires Not Shown
Figure 4: Load Voltage Measurement
10. Adjust the load voltage adjust pot unti l t he load voltage is 4.0 V ± 0.1 V.
11. Turn the regulator knob clockwise to close the regulator.
12. Unscrew the regulator from the calibration cylinder.
13. Unscrew the calibration cup from the detector.
NOTE: For convenience, leave the regulator and calibration cup connected by the
humidifier tube.
14. Re-install the amplifier to the housing using the screw, flat washer, and lock washer
removed in Step 5 above.
15. Calibrate the ppm hexane transmitte r as described in “Calibrat ion” on page 15.
16. Verify that the controller dis p lay reading decreases and stabilizes at 0 ppm.
17. Store the components of the calibration kit in a safe and conv enient place.
Calibration Frequency
Although there is no particular calibration frequency that is correct for all ppm hexane
transmitter applications, a calibration frequency of every 6 to 12 months is adeq uate for
most applications. Unless experience in a particular application dictates otherwise, RKI
Instruments, Inc. recommends a calibration frequency of every 6 months.
If an application is not very demanding, for example detection in a clean, temperature
controlled environment where hexane is not normally present, and calibration
adjustments are minimal at calibration, then a calibration frequency of every 12 months is
adequate.
If an application is very demanding, for example if hexane is present often and in
significant concentrations or the environment is not well controlled, then more frequent
calibration than every 6 months may be necessary.
14 • 65-2461RK PPM Hexane Transmitter
Page 19
Calibration
This section describes how to calibrate the ppm hexane transmitter. It includes procedures
to prepare for calibration, set the zero reading, set the response reading, and return to
normal operation.
W ARNING: The controller is not an active gas monitoring device during the calibration
procedure.
NOTE: The following procedure assumes the use of a calibration kit which includes a
calibration gas cylinder, a 0.5 LPM fixed flow regulator with an on/off knob, a
calibration cup for the detector, and a humidifier tube to connect the regulator to
the calibration cup.
Calibration Kit Humidifier Tube
The ppm hexane detector requires normal atmospheric humidity levels to respond
properly to hexane. Normal atmospheric humidity variations do not affect the detector’s
response to hexane in ambient air , but the ultra low humidity level of gas from a
calibration cylinder requires that the calibration sample be humi difi ed for the detector to
respond properly. The calibration kit for the ppm hexane transmitter includes a
humidifier tube that is not normally inclu ded in other calibration kits. This humidifier
tube humidifies the calibration sample flowing through it by absorbing humidity from the
ambient air and adding it to the sample. The humidifier tube is included in the “Parts
List” on page 17.
WARN ING: A humi di fier tube must be used when calibrating the ppm hexane
transmitter test for the detector to respond properly to the cali br ation gas.
Failure to use a humidifier tube will result in an inaccurate cal ibration.
Prepari ng for Ca libration
1.Screw the calibration cup onto the bottom of the hexane detector.
2.Use the humidifier tube to connect the regulator to the calibration cup.
3.Set a voltmeter to measure in the millivolt (mV) range.
4.Remove the junction box cover, then plug the voltmeter leads into the test points on
the amplifier.
Plug the positive lead into the red + test point; plug the negative lead into the black test point.
5.Use the following formula to determine the correct test points output for the
calibrating sample.
Output (mV) = (calibrating sample/fullscale) X 400 + 100
For example, with a calibrating sample of 250 ppm hexane and a fullscale setting of
500 ppm hexane, the correct output is 300 mV.
300(mV) = (250/500) X 400 +100
6.Place the controller into its calibration mode or disable external alarms.
65-2461RK PPM Hexane Tra nsm itter • 15
Page 20
NOTE: Calibrating the ppm hexane transmitter may cause alarms. Be sure to put the
controller into its calibration program or disable external alarms before
continuing.
Setting the Zero Reading
NOTE: If you can verify that the ppm hexane transmitter is in a fresh air environment,
you do not need to apply zero air to the detector before adjusting the zero
reading.
1.Screw the regulator into the zero air calibration cylinder.
2.Turn the regulator knob counterclockwise to open the regulator.
3.Allow the gas to flow for one minute and verify a reading of 100 mV (±2 mV). If
necessary, use the zero pot on the amplifier to adjust the reading to 100 mV (±2 mV).
4.Turn the regulator knob clockwise to close the regulator.
5.Unscrew the regulator from the zero air calibration cylinder. Leave the sample
humidifier tube connected to the regulator and the calibration cup.
Setting the Response Reading
1.Screw the regulator into the calibration cylinder. Verify that the calibration gas is
representative of the transmitter’s target gas.
2.Turn the regulator knob counterclockwise to open the regulator.
3.Allow the calibration gas to flow for one minute and verify that the reading matches
the response reading (±2 mV) you determined ea rlier. If necessary , use the span pot on
the amplifier to adjust the reading to match the correct response reading.
4.Turn the regulator knob clockwise to close the regulator.
5.Unscrew the regulator from the calibration cylind er.
Returning to Normal Operation
1.Remove the voltmeter leads from the amplifier test points.
2.Unscrew the calibration cup from the detector
NOTE: For convenience, leave the regulator and calibration cup connected by the
humidifier tube.
3.Secure the junction box cover to the junction box.
4.When the controller display reading falls below th e alarm setpoints, return the
controller to normal operation.
5.Verify that the co ntroller display reading decreases and stabilizes at 0 ppm.
6.Store the components of the calibration kit in a safe and convenient place .
16 • 65-2461RK PPM Hexane Transmitter
Page 21
Parts List
Part NumberDescription
18-0400RKJunction box with cover; (pre-drilled for amplifier)
33-2001RK-01Humidifier tube w/3/ 16” tubi ng on ends, for cal ibra tio n kit
57-1056RK-XXAmplifier (specify target gas and detection range)
65-2461RKPPM hexane transmitter, 0 - 500 ppm
71-0144RK65-2461RK PPM Hexane Transmitter Operator’s Manual (this document)
81-0083RK-21Steel calibration cylinder, 500 ppm hexane in air, 34 liter
81-0083RK-23Steel calibration cylinder, 500 ppm hexane in air, 103 liter
81-0076RK-01Zero air calibration cylinder, 34 liter
81-0076RK-03Steel calibration cylinder, zero air, 103-liter
Table 6 lists replacement parts and accessories for the ppm he xane transmitter.
Table 6:Parts List
81-1050RKRegulator, 0.5 liter/minute; with pressure gauge a nd f low cont rol knob, fo r 17 lit er an d
81-1051RKRegulator, 0.5 liter/minute; with pressure gauge and flow control kno b, for 34 li ter al u-
81-1 117RKCalibration cup
81-F026RKCalibration kit, includes regulator, humidifier tube, calibration cup, and 103 liter 500
81-F026RK-LVCalibration kit, includes regulator, humidifier tube, calibration cup, and 34 liter 500
SG-8547-01PPM hexane detector
34 liter steel calibration cylinders
minum and 58 liter and 103 liter steel calibration cylinders
ppm hexane steel calibration cylinder
ppm hexane steel calibration cylinder
65-2461RK PPM Hexane Tra nsm itter • 17
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.